Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinet Installation & Refacing in Miami, FL
Cabinet installation in Miami typically runs $4,800 to $9,500 for a standard 10×10 kitchen, while refacing the same footprint usually lands between $2,400 and $5,200. Refacing keeps your existing cabinet boxes and swaps the doors, drawer fronts, veneer, and hardware; installation means new boxes, new layout, and a shot at fixing storage that’s never worked. Groundwork Construction Co. of Miami does both, handles the plumbing and electrical that come with a layout change, and backs the work with our 730-Day Done Right Promise.
We’re a full-scope construction company, which matters more than it sounds. When a cabinet job turns up a slow leak under the sink or a wall that isn’t square, we’re not waiting on a second contractor to show up. Call (833) 968-1198 and a live person picks up, any hour, any day. Our technicians have up to 12 years of experience, arrive background-checked and in uniform, and quote upfront pricing before anything gets ordered. This page is part of our Kitchen Remodeling in Miami service, so if the cabinets are one piece of a bigger overhaul, we can scope the whole thing in one visit.
Why Miami Kitchens Are Hard on Cabinets
Humidity is the quiet killer here. Miami sits at 70 to 80 percent relative humidity most of the year, and that moisture works on cabinet boxes from the inside out. Particleboard and MDF cores swell at the bottom near the toe kick, especially in kitchens with a dishwasher or a sink that’s leaked once and been forgotten. We see it constantly in older homes in Little Havana and Shenandoah, where 1950s and 60s cabinetry was built for a drier climate and never stood a chance.
Salt air is the other factor. In coastal buildings from Miami Beach up through Surfside and Bal Harbour, the salt in the air attacks hinges, drawer slides, and any exposed metal faster than inland homeowners expect. A hinge that would last fifteen years in Kendall can seize up in six near the ocean. That’s why we push stainless and corrosion-resistant hardware on coastal jobs and spec plywood boxes over particleboard whenever the budget allows.
Then there’s the sun. South and west-facing kitchens in Miami take direct afternoon light through the summer, and it bleaches finishes and warps thermofoil doors that weren’t rated for it. If your cabinets face a sliding glass door onto a lanai, that’s a real cost factor and we’ll say so before you sign anything.
When You Need Cabinet Installation & Refacing
Most homeowners call us when one of these finally pushes them over the edge:
- Doors that won’t close or drawers that stick. In Miami humidity, wood swells and settles. If you’re slamming a cabinet door every morning, the box has likely absorbed moisture and the hinges are pulling out of soft, swollen material. Patching it works for a season, then it fails again.
- Water damage under the sink or beside the dishwasher. A slow drip you didn’t notice for two years will rot the cabinet floor and the toe kick. We open it up, replace the damaged box, and fix the source before we install anything new over it.
- A layout that fights you every day. Corner cabinets you can’t reach, a pantry that’s too shallow for Costco runs, no drawer stack wide enough for a sheet pan. If you’re gutting the footprint anyway, new installation lets us fix the geometry, not just the faces.
- Outdated doors in a home you’re about to sell or rent. In the Miami market, buyers and renters notice dated cabinets in the first ten seconds. Refacing gets you a modern look for roughly half the cost of new boxes.
- Thermofoil peeling at the edges. Common in 1990s and 2000s builds across Miami-Dade, particularly in tract homes. Once the foil lifts, moisture gets behind it and the door delaminates. It doesn’t stop on its own.
- You’re remodeling the whole kitchen. If counters, backsplash, or flooring are also going, cabinets are the anchor everything else gets measured from. Doing cabinets first saves you money on the rest.
Installation vs. Refacing: Which One Fits Your Kitchen?
This is the decision that shapes your budget, and it comes down to the condition of your boxes. Refacing makes sense when the cabinet boxes are solid, square, and dry, and you’re happy with the layout. We remove the doors and drawer fronts, apply a real wood veneer or rigid thermofoil to the visible box faces, install new doors and drawer fronts, and replace the hinges and slides. It’s a faster job and it can transform a kitchen.
Full installation is the right call when the boxes are swollen, water-damaged, or the layout is wrong. New cabinets mean new boxes, new doors, new hardware, and the chance to add a pull-out trash, a deep drawer bank for pots, or a taller pantry. It also means addressing whatever’s behind the old cabinets: plumbing, electrical, drywall. In Miami’s older neighborhoods, that’s often where the real surprises live.
We tell homeowners the truth here even when it costs us the bigger job. If your boxes are sound, refacing is the smarter spend. If they’re not, refacing puts a nice face on a problem that comes back in two years, and we won’t sell you that.
Our Cabinet Installation & Refacing Process
- Free in-home estimate and design consult. We measure the actual kitchen, not a sketch. We check the boxes for moisture and give you a firm number on installation versus refacing with no-hassle upfront pricing. The number you see is the number you pay.
- Material and hardware selection. We walk you through door styles, finishes rated for Miami humidity, and hardware that won’t corrode near the coast. Our brand partners include names like KraftMaid for cabinetry and Cambria for counters, and we’ll pair cabinet choices with the rest of the kitchen so nothing looks bolted on.
- Ordering and site prep. Cabinets are ordered to spec and staged. We protect floors and counters, shut off and cap plumbing where needed, and schedule the tear-out around your household so you’re not without a kitchen longer than necessary.
- Removal and any rough work. Old cabinets come out, and we address what’s behind them: a leaking shutoff, an outlet that needs to move for the new layout, drywall repair. Because we’re a full-scope builder, none of this becomes a separate contractor and a two-week delay.
- Installation and leveling. New cabinets get set, shimmed, and leveled, then scribed to walls that are almost never perfectly plumb (especially in older Miami homes). Doors and drawers are hung and adjusted so they close with one finger, and hardware goes on last.
- Final walkthrough and cleanup. We walk the kitchen with you, open every drawer, and fix anything that isn’t right before we leave. Then it’s covered by our 730-Day Done Right Promise. If something fails, we make it right.
Cabinet Installation & Refacing Pricing in Miami
Here’s what Miami homeowners actually pay. These are real ranges for this market, and they move based on cabinet count, material, and whether the layout stays put.
| Scope | Typical Miami Range |
|---|---|
| Refacing, 10×10 kitchen (doors, veneer, hardware) | $2,400 – $5,200 |
| Refacing, larger kitchen (20+ linear feet) | $5,000 – $9,000 |
| Stock cabinet installation, 10×10 kitchen | $4,800 – $7,500 |
| Semi-custom installation, 10×10 kitchen | $7,500 – $9,500 |
| Custom cabinetry | $15,000 and up |
| Layout change (moving sink, adding a run) | Adds $800 – $2,500+ in plumbing and electrical |
| Coastal corrosion-resistant hardware upgrade | $150 – $400 |
What drives the number up or down: the cabinet line (stock versus semi-custom versus custom), door style and finish, how many drawers versus doors, whether the layout changes, and the condition of what’s behind the old cabinets. Coastal homes near Miami Beach and Key Biscayne pay a bit more for hardware that survives salt air. Older homes in Little Havana or Allapattah sometimes need drywall and plumbing work once the boxes come out, and we quote that openly rather than surprising you mid-job.
Two things make the budget easier to plan. We offer 0% financing for 18 months, and you get $1,000 off projects over $10,000. That brings a lot of these jobs into reach without stretching a savings account. Financing is a real cost-helper backed by real pricing. Request your free project estimate and design consult and you’ll have a firm number in writing before you commit. Call (833) 968-1198 to lock it in.
Why Groundwork for Your Miami Cabinets
Most cabinet jobs fail for boring reasons: vague bids, subcontracted crews nobody vets, and a warranty that turns out to cover almost nothing. We built Groundwork Construction Co. around removing every one of those. You get a live person on the phone 24/7, no voicemail and no waiting until Monday. You get background-checked, uniformed technicians on every project who respect your home. And you get the written 730-Day Done Right Promise on the workmanship. If it isn’t done right, we make it right.
Because we cover the full scope of a home, cabinets also connect to everything else. Counters, backsplash, flooring, plumbing, and lighting can all run through one contractor. If your cabinet project is part of a larger kitchen overhaul, see our umbrella service at Kitchen Remodeling in Miami, and remember there is a strong link between cabinet layout and how well your counter and tile work line up later. Built to last, backed in writing.
FAQs – Cabinet Installation & Refacing
How much does cabinet refacing cost in Miami?
Cabinet refacing in Miami typically runs $2,400 to $5,200 for a standard 10×10 kitchen, with larger kitchens up to $9,000. The range depends on door style, finish, whether you upgrade hardware for coastal air, and how many visible surfaces need veneer. Call (833) 968-1198 for an exact quote. Estimates are free, and pricing is upfront with no surprises.
Is it cheaper to reface or replace cabinets?
Refacing usually costs 40 to 60 percent less than full installation because you keep the existing boxes. That’s the right move when the boxes are solid and layout is fine. If the boxes are water-damaged or swollen from Miami humidity, replacement is the smarter spend because refacing hides a problem that comes back. We’ll tell you which applies after we look, not before. Call (833) 968-1198 to schedule a free consult.
Can you install cabinets the same day?
Refacing a small kitchen can often be handled in one or two visits, and simple cabinet swaps are frequently done the same day once materials are on site. Larger installations and layout changes take longer because of ordering, plumbing, and electrical work. Most jobs move quickly because our technicians have up to 12 years of experience and we schedule tightly. Call (833) 968-1198 for a realistic timeline for your kitchen.
What’s the best cabinet material for Miami humidity?
Plywood cabinet boxes outperform particleboard in Miami’s climate because plywood resists moisture absorption better, and solid wood or high-quality MDF doors that are properly sealed last longer than unsealed thermofoil. Near the coast, spec stainless or corrosion-resistant hinges and slides. We’ll match the material to your kitchen’s exposure and budget during the free consult. Call (833) 968-1198 to talk options.
Written by the team at Groundwork Construction Co. of Miami, serving Miami.