Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Home Additions & ADU for Miami Homeowners
Miami lots are small, lots are expensive, and moving is a bigger bill than building. That’s why so many homeowners here choose to add on instead of sell: a garage conversion for an aging parent, a detached ADU for rental income, a second story for a growing family. The problem is that most contractors in this market are happy to take a deposit and then vanish into another job. We built Groundwork Construction Co. of Miami around upfront pricing, permits pulled and inspections passed, and our 730-Day Done Right Promise. Our technicians have up to 12 years of experience, and every crew member is background-checked and arrives in uniform. Call (833) 968-1198 and a live person answers, day or night. Estimates are free.
What Our Home Additions & ADU Service Includes
An addition is not one trade. It’s framing, roofing, electrical, plumbing, impact glazing, and finishing, all sequenced tightly so one delay doesn’t eat the whole schedule. We run the permits, coordinate the inspections, and stay on site from foundation to finish line. Here’s what that looks like across the work we do in Miami.
ADU Design & Permitting
ADU design and permitting covers the drawings, site plan, and municipal approvals needed before anyone breaks ground. You need it the moment you decide to build, because Miami-Dade and City of Miami review timelines can run several months and a rejected plan costs you a season. We handle the coordination with your architect or ours, submit the package, respond to plan-review comments, and track inspections through to certificate of occupancy.

Garage Conversion ADU
A garage conversion turns an existing, already-built structure into a legal living unit. It’s often the cheapest path to an ADU because the slab, walls, and roof already exist. Miami garages run hot and humid, so the work is all in what you can’t see: insulation, vapor control, a dedicated electrical panel, and impact-rated openings. We bring the shell up to code and finish it out so it passes final inspection the first time.

New Detached ADU
A detached ADU is a standalone structure in the yard, usually a studio or one-bedroom. You need one when the existing house has no room to convert and you want rental income or a separate address for family. We build it as a full structure: footings, framing, roofing, utilities run from the main service, impact windows, and interior finishes that match the quality of your house, not a shed with a bathroom.

Junior ADU & Interior Conversion
A junior ADU is a smaller unit carved out of the existing house, often a bedroom suite with a kitchenette and its own entrance. It suits a multigenerational household or a short-term rental that doesn’t require a separate building. We handle the wall layout, the added bath and kitchenette rough-in, and the separate entrance, keeping everything inside the existing footprint.
ADU Site Prep & Utilities
Site prep is the unglamorous groundwork: grading, drainage, slab, and the utility runs for water, sewer, gas, and power. It matters in Miami because our water table is high and our rainy season is real, so a slab that doesn’t drain properly becomes a problem in year two. We coordinate with Miami-Dade Water and Sewer and the local utility on service upgrades and meter placement before the first pour.
Room Additions
Room additions extend the main house, whether that’s a primary suite, a family room, or a home office. You need one when you love the house but have run out of rooms. We frame and tie the new structure into the existing roofline, match the exterior so it reads as original, and finish the interior with the same materials and trim you already have.
Second Story Additions
A second story addition builds up instead of out, which is often the only option on a tight Miami lot. It requires structural evaluation first: the existing foundation and framing have to carry the new load, and we won’t quote without that answer. Once the structural work checks out, we handle the framing, the new roof, impact windows, and the interior build-out. If you’re also replacing impact glazing, our home services page covers windows and doors alongside additions.
Sunrooms & Enclosed Patios
A sunroom or enclosed patio turns screened space into year-round living space. It’s the right call when you already have a covered patio and want to use it more than four months a year. We enclose it with impact-rated glass and hurricane-rated framing, because in Miami an enclosure that doesn’t hold up to a summer storm is a liability, not an upgrade.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Work With for Home Additions & ADU
Construction is only as good as what goes inside the walls. For plumbing fixtures, we install Delta and American Standard with equal comfort, and we know where each one tends to give trouble. Delta’s cartridge valves are straightforward to service, while American Standard’s tubs and toilets hold up well in our hard water and humidity. In wet areas, we set tile over Schluter waterproofing systems because Florida’s humidity punishes a poorly sealed shower pan, and we see the difference at the ten-year mark. Toto fixtures are the ones we get asked for most in ADU bathrooms, and they’re a good fit for a unit that sees daily rental turnover.
You aren’t locked into any one make. Whether your plans specify a brand we’ve named or something else entirely, we’ll tell you honestly what we think of it and install it correctly. The brands we recommend are the ones we’ve watched perform in Miami’s climate, not the ones with the biggest dealer incentive.
Signs You Need Home Additions & ADU Right Now
- You’ve run out of bedrooms. A teenager, an aging parent, or a returning adult child has pushed the house past capacity. Before you start looking at listings, price what an addition costs, because in most Miami neighborhoods the math favors building.
- Your garage is storage, not a car. If the garage has been a junk room for years and you need income or a separate suite, a garage conversion is usually the fastest and least expensive path. It reuses the structure you already paid for.
- You want rental income. Miami rents are high enough that a detached ADU can pay for itself over time. Get the numbers on paper before the market shifts.
- Your patio is unusable half the year. A screened patio that’s too hot in July and too wet in September is wasted square footage. An enclosed, impact-rated sunroom changes how the whole house gets used.
- You’re getting permits before you list. An unpermitted addition gets flagged in a buyer’s inspection, and it can stall a closing. If you’re planning to sell, get the work permitted and inspected now.
Our Home Additions & ADU Process – Step by Step
- 1
Call and talk to a person. Dial (833) 968-1198 any hour and a live person answers. We ask about your lot, your goals, and your budget so the first visit isn’t wasted.
- 2
Free design consult and site walk. We meet on site, look at the structure, check setbacks, and map the utility runs. If a second story is on the table, this is where the structural question gets answered.
- 3
Written line-item estimate. You get a written quote with the line items spelled out, backed by our 0% financing for 18 months and ol,000 off projects over ol0,000. The number you see is the number you pay, and there are no surprise change orders for work that was always part of the plan.
- 4
Permits and inspections. We pull the permits and coordinate the plan review and site inspections. You don’t chase the building department; we do.
- 5
Build and final walkthrough. The crew is on site, background-checked and in uniform, from foundation to finish line. At the close we walk it with you. If anything isn’t right, the 730-Day Done Right Promise means we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Home Additions & ADU Cost in Miami?
Home additions and ADU work in Miami runs $53,100 – $153,400, and that gap reflects how different the projects are. A garage conversion typically lands in the $35,400 – $94,400 range, while a fully detached ADU runs $106,200 – $259,600 depending on size, utility runs, and finishes. A second story or full room addition costs more than a conversion because you’re building structure rather than reusing it. Here’s what drives the spread:
- Site conditions: a high water table or a lot that needs grading and drainage adds cost before the first pour.
- Utility distance: the farther the new unit sits from the main service panel and sewer line, the more the runs cost.
- Impact glazing: Miami-Dade impact requirements are non-negotiable, and the door and window package is a real line item.
- Structural upgrades: second stories and tie-ins usually need foundation or framing work.
- Finishes: a rental-grade ADU and a primary suite cost different money.
The fast way to avoid overpaying is a written line-item quote so you can see what each part costs, plus a contractor who pulls permits. A cheap unpermitted job costs more at resale than it saved. To keep the outside of an addition matching the house, see our Home Additions & ADU in Miami service guide, and ask about free estimates, which include the design consult.
Home Additions & ADU Near Miami – Our Service Area
We work throughout Miami and the surrounding neighborhoods, including Brownsville, Gladeview, Miami Springs, West Little River, Coral Terrace, Pinewood, South Miami, Coral Gables, Westview, Glenvar Heights, and Fountainebleau. Scheduling depends on permit timelines more than distance, but we’ll tell you honestly when we can start. For nearby service details, see Home Additions & ADU in Brownsville or our Home Additions & ADU in Gladeview page.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Home Additions & ADU in Miami
A home addition extends your existing house, while an ADU (accessory dwelling unit) is a separate living space, either detached, converted from a garage, or carved out of the interior. Both add usable square footage and, in the case of an ADU, can create rental income. Miami allows ADUs under county and city rules, but the requirements differ by lot and zoning, so the first step is a site check. Call (833) 968-1198 for a free estimate and we’ll walk your lot with you.
Most Miami projects run several months, with detached ADUs and second stories on the longer end and garage conversions on the shorter end. The biggest variable is the permitting timeline through Miami-Dade or the City of Miami, which can take a while before construction starts. We give you a schedule with the permit window and build phase separated, so you know what’s happening when. Call (833) 968-1198 to talk through your timeline.
Home additions and ADUs run $53,100 – $153,400 in Miami, with detached ADUs from $106,200 – $259,600 and garage conversions from $35,400 – $94,400. The final number depends on size, utility runs, impact glazing, and finishes. We give a written line-item estimate, and with 0% financing for 18 months plus $1,000 off projects over $10,000, the number is what you agree to. Call (833) 968-1198 for your free estimate.
Yes. We install Delta and American Standard fixtures regularly in additions and ADU baths, and we set tile over Schluter waterproofing systems because Miami’s humidity makes a sealed shower pan critical. We have no brand requirement, so if your plans specify Toto or another make, we’ll install it correctly. Call (833) 968-1198 to discuss your plans.
Yes, we pull the permits and coordinate plan review and every inspection through to certificate of occupancy. Unpermitted additions get flagged at resale and can stall a closing, so we treat the permit as part of the job, not an extra. You don’t chase the building department; we do. Call (833) 968-1198 to start the permit process.
Every project is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t right within that window, we make it right, and it’s in writing rather than a verbal promise. The guarantee covers the work, and the materials carry their manufacturers’ warranties on top. Call (833) 968-1198 to review the details.
Start with your goals: how the space will be used, who it’s for, and your budget range. Gather your property survey and any existing plans, clear access to the work area and the utility panel, and expect some dust and daily noise during the build. The site walk in our process covers the rest. Call (833) 968-1198 to schedule your free design consult.
Schedule Your Home Additions & ADU Service in Miami Today
Ready to add square footage or build an ADU? Call Groundwork Construction Co. of Miami at (833) 968-1198. A live person answers around the clock. Your estimate and design consult are free and no-obligation, the pricing is upfront with no surprises, and every project carries our 730-Day Done Right Promise. Let’s walk your lot.
Written by the team at Groundwork Construction Co.