Full Bathroom Remodeling in Miami: Cost, Scope & Timeline
A full bathroom remodel in Miami typically runs $10,620 to $33,040 and takes four to eight weeks from demo to final inspection, depending on whether walls and plumbing move. This job means stripping a bathroom to the studs and rebuilding it: new subfloor and backer board, waterproofing, tile, fixtures, vanity, lighting, ventilation, and paint. If you want a real number for your bathroom rather than a range, call (833) 968-1198 and we’ll walk the room with you.
How a full bathroom remodeling project actually runs
Most contractors say “we handle everything.” Here’s what that looks like day by day, so you know what you’re buying and when you’ll be making decisions.
Stage 1: Walkthrough and written scope (about a week). We measure the room, check what’s behind the walls where we can, and confirm the layout. You get a written line-item estimate with materials, labor, and permits broken out. This is where you decide the big question: keep the plumbing where it is, or move it. That one choice swings the budget more than any finish.
Stage 2: Permits and demo (days 1 to 3). We pull the plumbing and electrical permits the project requires, then protect the floors and hallways and demo down to studs and joists. Old tile, old drywall, old cement board, and any water-damaged framing come out. On a pre-1970s Miami house, this is the day we find out what’s really there.
Stage 3: Rough-in and rough inspection (days 3 to 10). New drain and supply lines, new electrical for lighting and exhaust, and any structural fixes happen now. The rough inspection happens before any wall closes, which is why the schedule can’t be compressed. You confirm fixture and tile selections in this window because lead times start the clock.
Stage 4: Waterproofing, tile, and finish work (days 10 to 30). Backer board, a bonded waterproofing membrane system, then tile for the floor and shower, set and grouted. Vanity, toilet, and fixtures go in after tile. This is the longest stretch and the one that shows daily progress.
Stage 5: Final inspection and punch list (last week). The final inspection clears the permitted work. You walk the room with us and anything that isn’t right gets a deficiency on the list and gets fixed. Then we hand back the bathroom.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll make, and what each one really costs you
Almost every design decision on a full bathroom remodel is a trade of money against maintenance. Here’s how the options actually compare.
- Tile size and layout: Large-format porcelain means fewer grout lines to scrub and a cleaner look. It also requires a flatter, better-prepped substrate, so labor goes up. Smaller tile and mosaics handle a sloping shower floor better but cost more in install time. Both hold up in Miami’s humidity; porcelain is the safer choice on a floor.
- Waterproofing system: A bonded sheet membrane like Schluter’s systems, or a liquid-applied membrane, sit behind the tile and are what stop moisture from reaching framing. It’s an invisible line item and it’s the one you don’t skip. Going cheap here is how a five-year-old shower starts growing things.
- Toilet and fixtures: Many buyers start with Toto or American Standard for performance and parts availability. Standard-height vs. comfort-height is a comfort call; one-piece vs. two-piece is a cleaning and cost call.
- Vanity and countertop: Stock cabinets save money and install fast. Semi-custom buys you the right fit and storage in an awkward alcove.
- Exhaust ventilation: A properly sized fan vented outside is non-negotiable in a Miami bathroom. Without it, humidity stays in the room and paint and drywall pay for it.
- Lighting: A vanity light plus a ceiling fixture plus a shower light is the usual answer. Adding circuits is a permit item, not a hardware swap.
What full bathroom remodeling costs in Miami, FL
The market range for a full bathroom remodel in Miami is $10,620 to $33,040, and where a job lands on that range comes down to five things:
- Room size. A small hall bath and a primary bath are not the same job. Material quantities, labor hours, and tile square footage all scale with the room.
- Existing condition. Water-damaged subfloor, old galvanized or cast-iron drains, or missing framing turns a finish job into a repair job. This is the most common surprise in older Miami housing.
- Moving plumbing, electrical, or structure. Relocating a drain in a concrete slab is the priciest line item on the page. Keeping fixtures in place keeps the number down.
- Material grade. Standard vs. custom cabinetry, porcelain vs. natural stone, and plumbing-fixture tier all move the total.
- Permit scope. More permitted trades means more inspection steps and more cost, but unpermitted work is a problem at resale.
Your written estimate spells out materials, labor, permits, and what’s excluded. Call (833) 968-1198 for an exact quote; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Miami homes specifically do to this job
Miami construction is defined by the High Velocity Hurricane Zone. Miami-Dade County is the only place in the US with its own product-approval system, so exterior doors, windows, and shutters get a Miami-Dade NOA number, not just a national approval. That matters on a bathroom remodel because swapping a window or exterior door pulls wind-load compliance into the scope.
Then there’s the 40-Year Recertification rule, and 25-year for buildings near the coast. It creates a steady wave of concrete restoration and systems upgrades in older buildings. Much of the pre-1970s stock is CBS construction, concrete block and stucco, with unreinforced masonry walls. We run into cast-iron and galvanized drain lines that are past their service life in Coral Gables and older Miami neighborhoods, and that shows up the day tile comes off. Salt air and year-round humidity mean bathroom exhaust, sealants, and waterproofing get no slack. If your bathroom sits under a tired roof, homeowners often pair this with Roof Repair in Miami or a full Roof Replacement & Installation in Miami so water intrusion stops before the new tile goes in. We cover Miami and the surrounding area, so check the service-area page for your street. If the scope is broader than one bathroom, our Bathroom Remodeling in Miami page covers the wider range of work, and the full Bathroom Remodeling service covers what we do under that roof.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: full bathroom remodeling in Miami
Four to eight weeks is typical, with the longer end when plumbing, electrical, or structure moves. A same-layout job can finish in four; a full gut with a relocated shower can run closer to eight. Call (833) 968-1198 to get a schedule tied to your actual bathroom.
Yes, if the plumbing, electrical, or any structural work changes, the permitted trades require a permit and inspections. Cosmetic work (paint, tile over sound substrate, new vanity) often doesn’t. We pull the permits that apply and handle the inspections. Call for a permit check on your scope.
Yes, and keeping drains and supply lines where they are is the cheapest way to remodel. You can still replace the tub, vanity, toilet, and tile. Moving a drain in a concrete slab is what really drives the number up.
$10,620 to $33,040 is the realistic range for a full bathroom remodel in Miami. Size, existing condition, relocated plumbing, material grade, and permit scope push a job toward one end or the other. Call (833) 968-1198 for an exact quote – estimates are free.
Every project carries our 730-Day Done Right Promise: if something isn’t done right, we come back and make it right. That covers workmanship for two years. Ask us in writing at the estimate about what’s covered on materials.
Get a free estimate for your full bathroom remodeling in Miami
We’ll come to the bathroom, measure it, and give you a written line-item estimate with permits, materials, and labor broken out. Estimates are free, and the price you see is the price you pay. Call (833) 968-1198, and a live person answers any hour. We’ll show up with a scope you can compare against any other bid.
Written by the team at Groundwork Construction Co.