A Groundwork company - serving Miami, FL
A remodeled primary bathroom with a soaking tub and a walk-in shower
Full Bathroom Remodeling · South Miami, FL

Full Bathroom Remodeling in South Miami - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Miami
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in South Miami, FL: What It Really Involves

Full bathroom remodeling in South Miami means gutting the room to the studs and rebuilding it: demolition, new rough plumbing and electrical, backer board and waterproofing, tile, fixtures, and a final inspection before the walls close. Most South Miami full bathroom remodels run 4 to 6 weeks of active work, and they typically cost $10,620 to $33,040. Call (833) 968-1198 for a free on-site estimate and a written, line-item scope.

Call (833) 968-1198

How a Full Bathroom Remodel Runs, Stage by Stage

A tile setter installing wall tile in a shower

A full gut renovation has a real sequence, and the decisions land in a predictable order. Here is what actually happens between the first hammer swing and the final walkthrough.

  • Stage 1: Demolition and discovery (days 1 – 3). We pull the fixture set, strip tile and drywall to the studs, and open the floor around the drain. This is where we find out what the room is really made of – 1950s CBS block behind the tile, old cast-iron or galvanized lines, or a surprise layer of mud-set tile over a mortar bed. You decide nothing here; we document and photograph what’s found. Dumpster and permit posting fall in this window.
  • Stage 2: Rough-in (days 3 – 7). Licensed plumbing and electrical run new supply, drain, and vent lines and set boxes for the vanity, fan, and lighting. If you’re keeping the fixture layout, this is fast; if you’re moving the toilet or shower, the drain relocations add days and cost. This is the moment to finalize valve positions and confirm your rough-in dimensions before the walls close.
  • Stage 3: Inspections and close-up (days 7 – 9). The rough plumbing and electrical inspections happen before backer board goes up. Nobody skips this step, and skipping it is why some bathrooms fail at resale. After sign-off, our crews hang moisture-resistant board, then Schluter waterproofing membrane on the wet areas.
  • Stage 4: Tile, setting, and finishes (days 9 – 20). Floor tile, shower walls, grout, then vanity cabinet, countertop, faucets, toilet, mirror, and lighting. You’ll pick tile and fixtures in the planning phase, not mid-project. This is the longest visible stretch and where the room starts to take shape.
  • Stage 5: Final inspection and punch list (days 20 – 28 and beyond). The final building inspection, a written punch list, and a walkthrough with you. Then the 730-Day Done Right Promise kicks in – if anything isn’t right, we make it right.

Most South Miami full bathroom remodels finish in roughly four to six weeks of working days. Schedule matters here. Summer thunderstorms and the permitting calendar both shape when material deliveries and inspection slots land.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape a Full Bathroom Remodel

Once the room is open, the spec decisions are what you’re really paying for. Here’s what you’re choosing between, with the honest trade-offs.

  • Shower and tub configuration. A full walk-in shower with a linear drain and Schluter waterproofing is the modern default and costs more upfront than a standard pan, but it holds up better in South Florida humidity. A tub-and-shower combo is cheaper and gives you a tub, but it eats floor space in a 5-by-8 room.
  • Vanity and countertop. A standard 30-inch vanity with a quartz or solid-surface top handles a small footprint; a double vanity needs at least 60 inches and rewrites the plumbing. Delta and American Standard fixtures are the workhorse picks; Toto toilets carry a higher price for a quieter, more efficient flush.
  • Tile. Porcelain is the durable, low-maintenance choice for floors and wet walls. Natural stone (marble, travertine) looks warmer but needs sealing and shows water spotting – and in South Miami’s humidity, stone in a shower is a maintenance commitment, not a one-time finish.
  • Waterproofing system. A bonded membrane like Schluter in the shower and wet floor is what keeps a remodel from becoming a leak behind the wall. It’s not glamorous, but it’s the difference between a bathroom that lasts and one that molds.
  • Ventilation. A properly sized exhaust fan piped to the exterior, not into the attic, matters more in Florida than anywhere. Ask for it explicitly on the estimate.

What Full Bathroom Remodeling Costs in South Miami, FL

A new curved paver walkway to the front porch

Full bathroom remodeling in South Miami runs $10,620 to $33,040 for a complete gut renovation, with most mid-century homes landing in the $15,000 to $24,000 range. The spread comes down to four variables.

Size and layout. A 40-square-foot hall bath is at the low end; a 75-square-foot primary with a double vanity and walk-in shower pushes toward the top.

Existing condition. Opening a 1950s block home often reveals galvanized supply lines, cracked cast iron, or tile embedded in a mortar bed that adds demolition days. Rotten subfloor or a slow leak found during demo is the most common cost bump.

Relocating plumbing, electrical, or structure. Moving the toilet or shower drain, rerouting electrical for a new lighting plan, or opening a wall changes the job from a refit to a reconfiguration. Each adds cost and inspection scope.

Material grade and permit scope. Porcelain versus natural stone, a stock vanity versus a custom one, and a full permit set for plumbing and electrical all move the number.

Your written estimate itemizes demolition, rough-in, waterproofing, tile, fixtures, labor, and permit fees separately. What it typically does not include: structural repairs discovered behind the walls, HOA application fees, and fixture upgrades you choose after the contract is signed. No-hassle upfront pricing means the number you see is the number you pay on the agreed scope.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What South Miami Homes Do to a Bathroom Remodel

South Miami is its own jurisdiction, not Miami-Dade County, with its own building department and review process. On any remodel that touches structure or adds square footage, plan review is granular. A large share of the housing stock is 1940s – 1960s concrete-block and CBS construction with terrazzo or tile floors and small footprints, so a bathroom gut often uncovers a mortar bed under the tile, cast-iron drain lines, and undersized electrical. On tight infill lots near the mature live oaks, tree surveys and root-protection zones can reshape where you can trench or stage material. We see the same failure patterns in these older baths: failed pan liners, mold behind tile on an exterior block wall, and fans vented into the attic. If exterior work comes up alongside the bathroom, homeowners often pair this with Roof Repair in South Miami or a full Roof Replacement & Installation in South Miami. If you’re reworking multiple rooms at once, this fits naturally into Bathroom Remodeling in South Miami or our broader Bathroom Remodeling service. We cover South Miami and the surrounding neighborhoods including Glenvar Heights and Coral Terrace.

Serving South Miami, FL – Our Local Coverage Area

We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Full Bathroom Remodeling in South Miami

A galley kitchen opened up to the dining room with a new peninsula

Get a Free Estimate for Full Bathroom Remodeling in South Miami

If you’re planning full bathroom remodeling in South Miami, start with a free on-site estimate. We’ll measure the room, open up what we can see, talk through the layout and material choices, and hand you a written line-item quote with no surprises. Promotions include $1,000 off projects over $10,000 and 0% financing for 18 months. Call (833) 968-1198 to schedule.

Written by the team at Groundwork Construction Co.

Why South Miami Chooses Groundwork Construction Co. of Miami

We set the standard for full bathroom remodeling in South Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in South Miami

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What South Miami Customers Say

Trusted by homeowners across South Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA stone counter, tile backsplash and open shelf after a kitchen remodelA garage converted into a guest room and home officeNew architectural shingles with a clean valleyA new casement window over a kitchen sink

More services in South Miami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Miami

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Miami team

A local vetted partner works across Miami and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Full Bathroom Remodeling in South Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in South Miami.

(833) 968-1198

Request a Free Estimate in South Miami

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch