Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Fountainebleau, FL
A tub-to-shower conversion in Fountainebleau, FL typically runs $3,500 to $10,000 and takes 5 to 10 working days from demo to final walkthrough. The job means pulling the tub and its surround down to the studs, reworking the drain and valve, then rebuilding a walk-in shower with new waterproofing, wall finish, and door or curtain. Call (833) 968-1198 for a free on-site estimate before you commit to a layout.
How our tub-to-shower conversion process actually runs
Here is the real sequence, stage by stage, with what you decide and when. No two Fountainebleau bathrooms follow the exact same calendar, but this is the shape of every tub-to-shower conversion we build.
Stage 1: On-site measure and layout, about 60 to 90 minutes. We confirm the alcove dimensions, the drain location, and whether the existing valve is behind the tub deck or offset to one side. This is when you decide shower footprint (roughly 30×60 is standard for a tub alcove; you can widen to 36 or 42 inches if you take wall from an adjacent closet) and whether you want a linear drain or center drain. Drains at the center of the footprint keep the job simplest.
Stage 2: Demo and rough-in, day 1 into day 2. We remove the tub, surround, and old backer down to the studs, then inspect for hidden rot, soft framing, or moisture behind the walls. The drain is re-set to the new shower location and the valve body is checked or replaced. If the copper or PEX is sound and the drain sits where the new pan wants it, this stays quick. If the framing is compromised, that’s the moment it surfaces, and we price the fix before moving forward.
Stage 3: Waterproofing, day 2 and day 3. In wet, humid coastal-Dade construction we bond a waterproof membrane to the framing and pan and wrap the seams. This stage has cure time, so it isn’t a swipe-and-go. You choose the wall system here: cement board with a sheet membrane, a bonded waterproof foam board, or a pre-formed pan and wall kit for a tighter budget.
Stage 4: Tile and finish, days 4 through 7 or 8. Wall tile, floor tile, and grout go in, then the glass or shower door and fixtures. Tile layout, grout color, and door style are your calls at this stage. Large-format tile speeds things up; small mosaics with intricate patterns add a day or two of labor.
Stage 5: Punch and final walk, one hour. We run the shower, check the drain slope and every seam, clean up, and hand you the care notes. Any touch-ups are documented on the spot under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between for a Tub-to-Shower Conversion
Most of the decisions boil down to these forks. Each has a real trade-off, so it pays to know the cost of each before we sit down.
- Tiled shower with a membrane system. The premium look, and it holds up best against South Florida humidity when the waterproofing is done right. Expect the upper half of the price range. Best if you plan to stay.
- Pre-formed acrylic or fiberglass pan-and-wall kit. Fastest install, easiest to clean, lowest cost. The trade-off: fewer style options and it can feel less substantial underfoot. A solid choice for rentals or a quick resale-ready fix.
- Frameless glass vs. framed door vs. curtain. Frameless gives the cleanest sightline and needs precise tile work to support it. Framed doors cost less and tolerate more out-of-square openings. A curtain is the budget option.
- Large-format tile vs. mosaic. Large tile goes in faster and shows fewer grout lines to scrub. Mosaic looks richer but adds labor and grout upkeep.
- Linear drain vs. center drain. A linear drain lets you use a single large floor tile and a curbless entry; it costs more in parts and install. A center drain is simpler and cheaper.
- Niche, bench, or grab bars. Each adds function and cost. Grab bars and a low curb matter if the shower may serve an older family member.
What Tub-to-Shower Conversion costs in Fountainebleau, FL
Plan on $3,500 to $10,000 for a tub-to-shower conversion in Fountainebleau, with most full conversions landing in the $5,500 to $8,500 band. Here is how the line items typically break out:
| Line item | Typical range |
|---|---|
| Demo and haul-away | $300 – $700 |
| Plumbing rework (drain and valve) | $500 – $1,800 |
| Waterproofing and pan | $600 – $1,600 |
| Wall and floor tile | $900 – $3,000 |
| Glass door or enclosure | $500 – $2,200 |
| Fixtures (showerhead, valve trim) | $200 – $800 |
What pushes a Fountainebleau job toward the low end: a standard 30×60 alcove, the drain already centered, sound framing, and a pre-formed kit. What pushes it high: widening the footprint into an adjacent closet, moving the drain across the floor, discovering rotted framing or a failed valve, or upgrading to frameless glass and large-format porcelain. The variables that move the number most are footprint size, existing condition behind the walls, whether plumbing or electrical has to relocate, material grade, and how much tile labor the pattern demands.
A written estimate covers demo, rough plumbing, waterproofing, tile, fixtures you select, glass, and cleanup. It typically does not cover moving a load-bearing wall, replacing subfloor that’s gone soft, or code upgrades the inspector requires after opening the wall; we document each of those in writing the moment we find it so there are no surprise change orders. Upfront pricing, and the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau homes specifically do to this job
Fountainebleau (33172) is a dense stretch of 1970s-to-2000s mid-rise condos, garden apartments, and townhomes sitting in unincorporated Miami-Dade just west of the Florida Turnpike, and that housing stock shapes nearly every conversion we price here. These are concrete-block and masonry buildings with stucco over CMU, not wood frame, so when we open up a bathroom the walls are solid and the plumbing chase runs through block, which changes how a drain moves. Behind the tub of a 1980s unit on the corridors off Fontainebleau Boulevard, we regularly find a decade of trapped moisture that never drained right, and it’s often a soft frame that surfaces on demo day one.
Two local rules affect the work itself. Miami-Dade runs its own product-control (NOA) system for hurricane-rated, moisture-resistant materials, so the backer board and waterproofing we spec carry the right approval paperwork. And when a building passes its 25, 30, or 40-year milestone, the mandatory recertification window mobilizes a lot of concurrent repair work, so permit and inspection queues tighten. Condo HOAs also dictate what you can change: many board approvals cover the valve and drain but restrict altering the wall or floor footprint, so we confirm those limits before ordering material. If the surrounding project grows into more than the shower, that work lives on our Bathroom Remodeling in Fountainebleau page, and our Bathroom Remodeling service covers the broader scope. We serve the whole Fountainebleau area and nearby communities like Olympia Heights, Coral Terrace, Miami Springs, and Glenvar Heights.
Impact-rated considerations matter beyond the shower itself. Homeowners often pair a bathroom rebuild with Metal Roofing in Fountainebleau or Tile Roofing in Fountainebleau when the building envelope or recertification repairs are already underway, and PGT and CGI impact-rated products are common choices for the door and window openings when a unit gets a moisture reset.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Tub-to-Shower Conversion in Fountainebleau
Most conversions take 5 to 10 working days, with a pre-formed kit closer to 5 and a fully tiled conversion with frameless glass closer to 10. Curing time for the waterproofing and dry-time between grout coats are what set the floor on that timeline. Call (833) 968-1198 for a schedule matched to your unit.
Yes in most cases, because relocating a drain or valve is a plumbing change that Miami-Dade requires to be permitted and inspected. Like-for-like tile replacement alone often doesn’t trigger one. We pull the permit and manage the inspection so the work is done to code the first time.
Yes. If the drain already sits where the new shower pan wants it and the valve is sound, we keep both in place and the conversion stays in the lower cost range. Widening the footprint or moving the drain across the floor is what requires more plumbing and structure work.
The typical range is $3,500 to $10,000, with most jobs landing between $5,500 and $8,500. Footprint, existing condition behind the walls, material grade, and glass choice are the biggest levers. Call (833) 968-1198 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right, one of the longest workmanship guarantees in residential construction. The waterproofing and tile installation both fall under it. Ask for the written terms when we quote – no fine print.
Get your free Tub-to-Shower Conversion estimate in Fountainebleau
Call (833) 968-1198 and a live person answers, any hour – no voicemail black hole. We’ll book a free on-site estimate, measure your alcove, and write a line-item quote for a Tub-to-Shower Conversion in your Fountainebleau home, detailing what’s included and what isn’t. Financing at 0% for 18 months and $1,000 off projects over $10,000 are available, and every technician arrives background-checked, in uniform, ready to work.
Written by the team at Groundwork Construction Co.