New Detached ADU in Hialeah, FL: What It Takes
A new detached ADU in Hialeah, FL is a separate, fully self-contained house on your lot with its own entrance, kitchen, bathroom and utility connections. From signed contract to move-in, plan for 7 to 11 months, and budget $45,000 – $130,000 depending on size, site work and finish level. Call (833) 968-1198 and we’ll walk your lot, check setbacks, and put a real number in writing.
How We Build a New Detached ADU in Hialeah, Stage by Stage
Detached means what it sounds like: new slab, new walls, new roof, new meter. Nothing about it piggybacks on the main house except the address. Here’s the order we work in, and where your decisions land.
Stage 1: Site walk and feasibility (week 1)
We measure the lot, find the actual property lines, and check lot coverage and setbacks before anyone draws anything. In Hialeah this is where most projects live or die, because decades of rear and side additions have already eaten the buildable area. You decide the footprint and where the unit sits relative to the main house, the fence line and the driveway.
Stage 2: Design and permitting (weeks 2 through 12, sometimes longer)
Drawings go to the city, and the city comes back with comments. Structural, wind-load and flood-elevation details all get reviewed, and we respond to each round in writing. You decide the exterior finish, roof style and window package here, because those choices show up on the plans. This is the slowest stretch of the job, and it’s the one nobody can shortcut.
Stage 3: Site prep and slab (weeks 1 through 3 of construction)
We clear the footprint, strip the grass, grade for drainage, and set forms. Underground plumbing and electrical conduit go in before the concrete, then the slab is poured and cured. You decide utility routing with us, since the tie-in point to the main service affects both cost and inspection sequence.
Stage 4: Structure, roof, rough-in (weeks 4 through 12)
Block walls or frame go up, the tie-beam and roof structure follow, and then plumbing, electrical and mechanical rough-ins get inspected before anything closes up. Under Miami-Dade wind-borne debris rules, this is when the opening protection and roof-to-wall connections get looked at closely. We schedule inspections so the framer, electrician and plumber don’t stack on top of each other.
Stage 5: Finishes, final inspection, handover (weeks 13 through 20)
Drywall, paint, flooring, cabinets, fixtures and trim. Then the final inspections, a meter, and a walkthrough where we hand you the warranty paperwork and the as-built drawings. You decide countertops, flooring and paint at the front of this stage, not the back, or you’ll stall the crew.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make on a Detached ADU
Most of the budget swings live in a handful of decisions. Here’s how they break down, and what each one costs you in money or upkeep.
- Footprint and unit size: a 500 – 600 sq ft one-bedroom keeps you near the low end of $45,000 – $130,000. A two-bedroom at 750 – 900 sq ft pushes toward the top, mostly because of foundation, roof area and another bathroom.
- Wall system: concrete block matches the neighborhood’s mid-century homes and handles humidity well; wood frame is faster and cheaper up front but needs more attention to stucco and paint over time.
- Roof: a low-slope flat roof with a membrane or a shingle roof from GAF or CertainTeed. Flat roofs read cleaner next to flat-roofed block homes but demand disciplined drainage; pitched shingle roofs shed water faster and are easier to repair.
- Windows and doors: impact-rated units cost more per opening but cut insurance friction and skip the shutter routine every June.
- Kitchen and bath finishes: stock cabinets and a prefab shower keep the unit affordable; a tiled walk-in shower and quartz counters add real money and real durability.
- Utility metering: separate meter means a separate monthly bill for the tenant and a cleaner rental setup. Shared service is cheaper to install and messier to split.
What a New Detached ADU Costs in Hialeah, FL
In Hialeah, a detached ADU runs $45,000 – $130,000, with the bulk of jobs landing in the middle. That range covers design coordination, permits, site work, structure, roof, utilities and finishes. A studio or one-bedroom at 500 sq ft sits at the low end. A two-bedroom with impact windows, a tiled bath and a separate meter sits at the high end.
Five things move the number:
- Size: every extra 100 sq ft adds foundation, wall, roof and finish cost.
- Site conditions: tight rear lots that need a crane or hand-digging, or lots where the buildable area is already squeezed by existing additions, cost more to start.
- Utility runs: the farther the ADU sits from the main service and sewer or septic tie-in, the more trenching and wire you pay for.
- Finish grade: builder-grade finishes versus tile, quartz and custom cabinetry is a real gap.
- Permit scope: a clean lot with straightforward setbacks moves faster and cheaper than one where we have to resolve a lot-coverage issue before the city will even accept the application.
Your written estimate is line-item: site work, foundation, structure, roof, MEP, finishes, permits. What it doesn’t include is anything the city asks for after the fact if site conditions change, and we tell you that up front so it isn’t a surprise.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah Lots and Homes Do to This Job
Hialeah is a dense owner-investor market, and most of the work here is built around homes from the 1950s through the 1970s: single-story concrete block and stucco, flat or low-slope roofs, and a whole lot of converted garages and rear additions built over decades. That history is exactly what makes a detached ADU tricky. Rear and side additions built right up to the property line are common, so setback and lot-coverage issues surface at permitting that were never a problem when the original block home went up. Plenty of the work is also in Spanish, and permitting, inspections and client communication all run that way, which is part of why we operate bilingually here rather than hiring a translator after the fact. In the ZIP codes we work most, 33017, 33014, 33013 and 33016, the sun and humidity chew through stucco and waterproofing fast, so we build to Miami-Dade wind-borne debris and flood elevation rules rather than cutting corners that come back in year three.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Hialeah
Most projects run 7 to 11 months from signed contract to final inspection, and permitting alone eats 8 to 12 weeks of that. Construction is usually 18 to 22 weeks once the permit is issued. Call (833) 968-1198 to get a schedule based on your lot.
Yes. A detached ADU requires full building, electrical, plumbing and mechanical permits, plus wind-load and flood-elevation review. We handle the submittal and inspections as part of the job. Call (833) 968-1198 and we’ll explain what your lot will need before you commit to anything.
Usually yes, because a detached unit has its own plumbing and its own structure. The main house only gets touched at the utility tie-in point. That’s one of the reasons detached is often easier to permit than an interior conversion. Call for a site walk to confirm.
$45,000 – $130,000, with size, site conditions, utility distance and finish grade driving the spread. A one-bedroom at roughly 500 sq ft sits near the bottom; a two-bedroom with impact windows and a separate meter sits near the top. Call (833) 968-1198 for an exact quote, and estimates are free.
Every ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it isn’t done right, we make it right. Call (833) 968-1198 to schedule your free estimate.
Get a Real Number on Your Detached ADU
We’ll walk your Hialeah lot, check setbacks against what’s already built, and put a line-item estimate in writing for a new detached ADU. That’s the free on-site estimate: no vague square-foot pricing, no number that changes after the first truck pulls up. Call (833) 968-1198 to schedule yours. If the wider project includes a full Home Additions & ADU in Hialeah scope, we’ll price that alongside it, and homeowners often pair this with Kitchen Design & Layout in Hialeah or Backsplash, Tile & Flooring in Hialeah for the unit’s finishes. You can also see the broader Home Additions & ADU work we do and the rest of our Hialeah service area.