Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Tub-to-Shower Conversion Really Costs in Miami, FL
A tub-to-shower conversion in Miami runs $4,130 to $11,800 for the conversion itself, and most homeowners land between $4,500 and $9,000 once drain work, waterproofing, and tile are real line items instead of guesses. That spread matters, because the difference between a low quote and a finished bill in this city is almost always the pipe under the tub. Call (833) 968-1198 for a free estimate and we’ll tell you which number you’re actually looking at, upfront, before anyone swings a hammer.

The Problem Hiding Under Every Older Miami Tub
If your Miami home went up before 1980, the drain line under that tub is most likely cast iron or galvanized steel. It’s been carrying water, soap, and Miami’s mineral-heavy supply from the inside out for four to six decades. What looked fine from above is often scaled, pitted, or already leaking at a joint you can’t see.
Converting to a shower without replacing that line is building a new bathroom on a rotting foundation. A generic price guide will quote you tile and a shower pan and leave the drain out entirely. That’s exactly how a $4,000 estimate turns into a $9,000 invoice once the slab is open and the real pipe shows up.
So we inspect first. Camera inspection of the existing drain before demo is standard practice on every conversion we run, not an added service you have to ask for. The camera tells us whether the line is serviceable or whether it’s coming out. You get that answer before the first tile is ordered.
Why a Miami Conversion Costs More Than the National Numbers
Miami’s housing stock does things to a bathroom budget that national calculators don’t account for. The city is dense with concrete-block and CBS homes, many of them built before 1970, plus 1920s Mediterranean Revival and MiMo buildings whose plumbing has been patched a dozen times. In those homes, rerouting or lowering a shower drain isn’t a matter of pulling a pipe through a wood floor.
- Slab work: The concrete slab has to be saw-cut to move or lower the drain. That adds $600 to $1,200 and has to be patched properly, or you’ll get cracking under the new tile within a couple of years.
- Drain replacement: Corroded cast iron or galvanized runs get swapped to PVC, which is where the biggest swing in cost lives.
- Permits: A Miami-Dade conversion requires a plumbing permit and a rough inspection before tile goes in. Contractors who skip it leave you exposed at 40-Year Recertification, when the county requires structural and plumbing inspections on older buildings, and again when you sell.
- Humidity and salt air: With year-round humidity and salt-laden coastal air, waterproofing behind the tile has to be done to a higher standard than in a dry climate. This is where cheap jobs fail first.
Here’s a line-item look at what we see across Miami jobs, so the quote you get means something:
| Item | Typical range |
|---|---|
| Tub-to-shower conversion (demo, pan, tile, trim) | $4,130-$11,800 |
| Walk-in shower installation | $5,310-$14,160 |
| Shower replacement | $3,540-$10,030 |
| Full bathroom remodel (if the scope grows) | $10,620-$33,040 |
| Small bathroom remodel | $5,900-$14,160 |
| Vanity installation | $945-$3,540 |
| Drain reroute via slab saw-cut (add-on) | $600-$1,200 |
Those ranges come from real Miami-Dade market data. Upfront pricing means the number we write is the number you pay, and the pipes don’t surprise you later. For a wider look at how a full bathroom scope compares, see our Bathroom Remodeling in Miami page.
Common Scenarios We Walk Into in Miami
Not every conversion is the same job, and the scenarios repeat enough that we can tell you the likely shape of yours before we arrive.

- The 1950s CBS ranch in a flood-zone neighborhood: Original cast-iron drain, often rooted or partially collapsed. Expect a full drain replacement and slab work. This is the high end of the range, closer to $9,000 once tile and waterproofing are included.
- The post-2000 condo or townhome: PVC drain already in place, no slab cut needed. You’re looking at the lower end, often $4,500-$6,500 with a standard shower pan and tile.
- The Mediterranean Revival or MiMo property: Odd rough-in dimensions and past patch jobs, so framing and waterproofing take longer. Usually mid-range, with custom tile to match original character.
- The aging-in-place adaptation: A low-threshold curbless shower with a grab bar. Drain lowering and slab work are routine here, so budget toward the middle of the range.
One first-hand detail worth knowing: we see far more corroded galvanized lines in neighborhoods with older water mains, because the scale and sediment settle and accelerate the pipe’s decline. If your home predates 1980, plan for the camera inspection even if everything looks fine on the surface.
What Groundwork Construction Co. of Miami Brings to the Job
The plumbing rough and the finished tile are the two areas most likely to show defects after the check clears, which is why all our work is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right, for two years. That’s one of the longest workmanship guarantees in residential construction, and it applies to both the rough plumbing and the finished waterproofing and tile.
Our technicians bring up to 12 years of experience to every job, and they’re background-checked and arrive in uniform. Calls get answered by a live person 24/7, not a voicemail box that waits until Monday. Every project carries upfront pricing, and financing is available at 0% for 18 months, with $1,000 off projects over $10,000, so you can do the drain work and the tile in one project instead of paying twice in stages. If you want to see how this fits into a Bathroom Remodeling scope, that’s the place to start.
We work across the city, from Miami Beach to Coral Gables to Little Havana, and each job gets the same standard. Newer builds and additions in the area sometimes use panelized or prefab systems from brands like Mighty Buildings or Boxabl, but the plumbing under an older Miami tub is largely the same story. When a conversion grows into a Garage Conversion or a broader Home Addition, you still keep one contractor from start to finish.
Frequently Asked Questions
Expect $4,130 to $11,800, with most homes landing between $4,500 and $9,000 after drain work, waterproofing, and tile are included. Pre-1980 homes with cast-iron or galvanized drains sit at the higher end because the pipe has to be replaced, not just connected to. Call (833) 968-1198 for an exact quote; estimates are free and we’ll bring a camera to look at the drain before pricing.
Yes. Miami-Dade requires a plumbing permit and a rough inspection before the tile goes in. Skipping it leaves you exposed at 40-Year Recertification and can stall a sale, because the work wasn’t signed off. We pull the permit and schedule the inspection as part of the job, not as an extra line item.
For a sound tub in a home with good plumbing, repairing can be cheaper up front. But if the drain line is corroded or the tub is cracked, a conversion costs $4,130 to $11,800 and gives you a floor you can use for decades, versus paying twice. Camera inspection tells you which side of that line you’re on. Call (833) 968-1198 and we’ll give you the straight answer.
Most conversions run one to two weeks depending on slab work and tile, and we can usually schedule an inspection within days. The permit and rough inspection add a little time, but doing it right the first time is faster than fixing a failed drain later. Ring (833) 968-1198 to check the calendar and get your free estimate booked.
Get Your Free Estimate Today
Don’t build a new shower on a pipe that’s been failing since the 1970s. Groundwork Construction Co. of Miami will inspect your drain, price the whole conversion upfront, and back it with the 730-Day Done Right Promise. Call (833) 968-1198 for a free estimate and design consult, and we’ll answer on the first ring, any hour.
Written by the team at Groundwork Construction Co. of Miami, serving Miami, FL.
What Our Customers Say
"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong