Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does ADU Construction Cost in Miami?
ADU construction in Miami runs $106,200 to $259,600 for a complete, permitted accessory dwelling unit, with most Miami homeowners landing between $150,000 and $200,000 for a 600 – 900 sq ft detached unit. The low end of that range covers a garage conversion or a simple attached studio; the high end reflects a fully detached two-bedroom unit with a kitchen, full bath, impact glass, and separate utility metering.
Before you call anyone, know this: an ADU is a second house on your lot. It carries its own foundation, roof, electrical service, plumbing rough-in, and impact-rated envelope. The gap between the cheapest bid and a solid one in Miami is usually a missed line item, not a discount. If a number looks too low, something on the scope got dropped.
Key Takeaways
- A permitted ADU in Miami costs $106,200 – $259,600 depending on size, type, and site conditions.
- Garage conversions are the cheapest route at $35,400 – $94,400 because the shell and foundation already exist.
- Impact-rated windows and doors add real money in Miami-Dade but aren’t optional, and they’re required for a certificate of occupancy.
- Site work (septic tie-in, drainage, tree removal, utility trenching) is the line that blows budgets most often.
- Live person, 24/7 at (833) 968-1198, with free estimates and upfront pricing so the number you see is the number you pay.
ADU Construction Cost Breakdown (2026)
Here’s what the money actually goes to. These ranges reflect the Miami market for a detached or attached ADU built to code, including permits and inspections. Your actual number depends on square footage, site conditions, and finish level.
| Line Item | Typical Miami Cost | What It Covers |
|---|---|---|
| Design & permit fees | $6,000 – $18,000 | Architectural plans, engineering, Miami-Dade permit and impact-fee review |
| Site prep & grading | $8,000 – $25,000 | Clearing, excavation, drainage, fill, utility trenching |
| Foundation | $12,000 – $28,000 | Slab or stem-wall, termite treatment, waterproofing for the water table |
| Framing & shell | $25,000 – $55,000 | Stick framing, sheathing, roof structure |
| Roofing | $8,000 – $18,000 | Hurricane-rated roofing assembly to current Miami-Dade wind-load |
| Windows & doors (impact) | $9,440 – $29,500 | Impact-rated glazing required in the high-velocity wind zone |
| Electrical service | $6,000 – $15,000 | Panel, wiring, fixtures, separate metering if you want to rent the unit |
| Plumbing | $7,000 – $16,000 | Supply, drain, water heater, lateral to sewer or septic |
| HVAC | $5,000 – $12,000 | Ducted or mini-split system sized to the unit |
| Insulation & drywall | $5,000 – $12,000 | Spray foam or batt, hang, tape, finish |
| Flooring, kitchen, bath finishes | $18,000 – $45,000 | Cabinets, counters, tile, fixtures, appliances |
| Exterior finishes & landscaping | $6,000 – $18,000 | Siding or stucco, paint, walkways, basic landscaping |
| Total (detached ADU) | $106,200 – $259,600 | Permitted, finished, and ready for occupancy |
If the shell already exists, you’re looking at a different math. A garage conversion runs $35,400 – $94,400 because you skip foundation, framing, and most of the roof. Additions with shared walls also come in lower than fully detached units. We see the widest swings on the site-prep and utility lines, and narrow swings on the finishes, because a 700 sq ft kitchen has a floor and a ceiling no matter how nice the counters are.
What Affects ADU Construction Pricing in Miami
Six things move the number more than anything else. If you want to control the budget, these are the levers.
- Detached vs. attached vs. garage conversion. A detached unit is the most expensive because it’s a whole new building. An attached ADU shares a wall and foundation, saving roughly 15 – 25%. A garage conversion reuses the shell and comes in lowest, at $35,400 – $94,400.
- Lot and site conditions. In Miami neighborhoods like Little Havana, Coconut Grove, and Coral Gables, mature trees, tight rear-yard access, and old septic systems drive up site work. A lot with an easy trench run and clear access saves thousands; a lot where a crane can’t reach the back saves nothing.
- Impact-rated envelope. Miami-Dade’s high-velocity hurricane zone requires impact glass, specific roof-to-wall connections, and continuous load path detailing. Impact windows and doors alone run $9,440 – $29,500. They are not optional, and they are among the most common places a cheap bid under-quotes.
- Utilities and metering. If you plan to rent the ADU, separate electrical and water meters cost more up front but pay back quickly. We help Miami homeowners decide when separate metering makes sense based on how long they intend to rent.
- Finish level. A rental-grade kitchen with laminate counters and stock cabinets saves $10,000 – $25,000 versus a custom unit. A higher finish level pays back if the ADU is for family, not renters.
- Permit and impact fees. Miami-Dade ADU permits involve zoning review, plan review, and impact fees that can run $6,000 – $18,000 depending on the unit size and the utility service area. These are non-negotiable and typically billed separately from construction.
How to Save on ADU Construction
You can’t change the code requirements. You can change how you approach the project.
- Start with a garage conversion if your garage qualifies. If your lot has a detached garage that can be brought up to code, a conversion is the single biggest cost lever available. At $35,400 – $94,400, it’s less than half the cost of a fully detached unit.
- Design to the standard plan. Custom architectural drawings add cost and time. Using a proven footprint reduces plan review friction and simplifies permit review at the county.
- Group trades and stage the build. Building the ADU and a fence in the same project, or coordinating a new driveway, lets crews work in sequence rather than returning months later. Grouped scopes save real money.
- Choose materials that don’t need maintenance. James Hardie siding and impact-rated Andersen or Pella windows cost more upfront but avoid the repaint and repair cycle that eats long-term budgets in Miami’s humidity and salt air.
- Take the financing offer seriously. 0% financing for 18 months and $1,000 off projects over $10,000 change the cash-flow math on a $150,000 build.
- Get one clear estimate from a team that answers the phone. Free estimates with upfront pricing stop the “revised bid” surprises that hit most ADU projects. Call our Miami service area team at (833) 968-1198.
Is an ADU a Good Investment in Miami?
In most cases, yes, and the math is straightforward. A permitted 700 sq ft ADU in a Miami neighborhood like Wynwood, Little Haiti, or Allapattah can rent for $1,800 – $2,800 per month depending on location and finish level. That puts payback on a $150,000 build somewhere between 4.5 and 7 years, before you count the resale value the unit adds to the property. Lenders increasingly recognize ADU rental income when underwriting, which changes what you can borrow against the property.
The investment question turns on three things: whether the unit is permitted, whether the envelope is solid enough to avoid water damage in Miami’s wet season, and whether the units are separated enough that a renter and a homeowner don’t share walls. Converting a garage with a shared wall is cheaper up front but usually rents for less because of privacy.
Do You Need Permits for an ADU in Miami?
Yes, always. Every ADU in Miami-Dade County requires a building permit, and most require zoning approval, electrical, plumbing, and mechanical permits, and a certificate of occupancy before anyone can live in it. Unpermitted ADUs create real problems at resale, at insurance renewal, and if the county discovers the unit, they can require it be brought up to current code or removed. We handle permit coordination as part of every ADU project, from plan review through final inspection.
FAQs – ADU Construction Cost
What does a typical ADU cost in Miami?
The typical Miami ADU project lands between $106,200 and $259,600, with most homeowners spending $150,000 – $200,000 for a 600 – 900 sq ft detached unit. Garage conversions run $35,400 – $94,400. Call (833) 968-1198 for a free estimate on your specific lot.
Is it cheaper to convert a garage or build a detached ADU?
Garage conversion is significantly cheaper at $35,400 – $94,400 versus $106,200 – $259,600 for a detached unit, because the shell and foundation are already in place. The conversion only makes sense if your existing garage can meet current code for height, ventilation, and egress. We’ll tell you which one fits your property during the free estimate.
How long does ADU construction take in Miami?
A detached ADU typically takes 6 – 10 months from permit to final inspection in Miami, with permit review consuming 8 – 14 weeks of that window. Garage conversions take 3 – 5 months. Weather in Miami’s rainy season and how fast the county processes your permit are the two biggest variables.
What’s the $1,000 off and 0% financing offer worth on an ADU?
On a $150,000 ADU, $1,000 off plus 0% financing for 18 months can save several thousand dollars in interest versus a conventional construction loan. Both offers are standing promotions and can be combined with the free estimate. Call (833) 968-1198 to see what your project qualifies for.
Can I share utilities between the ADU and the main house?
Yes, you can share water and power with the main house, and doing so saves $5,000 – $12,000 in separate meter installation. The trade-off is what you can legally charge for rent and how you split the bills. We walk Miami homeowners through both setups before drawings are finalized.
Do impact windows really add that much to the cost?
Impact windows and doors add $9,440 – $29,500 to an ADU in Miami-Dade, and they are required by code in the high-velocity hurricane zone. There is no code-compliant ADU in Miami without them. We install Andersen and Pella impact-rated units because they carry the ratings and the warranty to back the envelope.
Why Miami Homeowners Call Groundwork Construction Co.
An ADU is a big enough project that one missed warranty, one disappearing crew, or one vague bid can cost you more than the upgrade was worth. We built Groundwork around the parts of the process that most contractors make you gamble on.
- 730-Day Done Right Promise. If any part of your ADU isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, in writing, on every project. Built to last, backed in writing.
- Live person, 24/7. Calls are answered by a real person around the clock, not a voicemail box waiting for Monday morning. That matters when a permit question, an inspection, or a change order can’t wait.
- Background-checked, uniformed technicians. The crews who work in your home and on your lot are verified and arrive in uniform, on schedule, with the trades they need.
- Upfront pricing, no surprises. The number you see is the number you pay. We quote the full scope, including the site work and utility lines that get left off other bids, so you’re not renegotiating in the middle of a build.
- Curated brand partners across every trade. KraftMaid, Cambria, Kohler, GAF, CertainTeed, Andersen, Pella, James Hardie, Belgard, and more. Every ADU uses products we stand behind, not just whatever’s in stock.
- 0% financing for 18 months and $1,000 off projects over $10,000. Real levers on a real budget, not marketing fluff.
- Experienced technicians. Our technicians bring up to 12 years of experience to every job, and it shows in the details that pass inspection the first time.
We handle everything on an ADU from foundation to finish line: design coordination, permits, site work, structural, envelope, mechanical, and finishes. One contractor, one point of contact, one written promise covering the whole build. If your project also touches the main house, we offer home additions and other services so you don’t have to coordinate multiple crews.
Get a Free ADU Estimate in Miami
The best way to know what your ADU costs is to price your actual lot. We give you a full-scope estimate, including permits, site work, and finishes, so the number you see is the number you pay. There’s no charge and no pressure to book.
Call (833) 968-1198 today for a free estimate and design consult on your Miami ADU project. Someone answers the phone around the clock, and we’ll walk you through options for your specific lot, budget, and how you plan to use the unit. From foundation to finish line, backed by the 730-Day Done Right Promise.
Pricing reflects the Miami market as of 2026. Groundwork Construction Co. of Miami offers free estimates – call (833) 968-1198.
What Our Customers Say
"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong