A Groundwork company - serving Miami, FL
ADU Site Prep & Utilities in Westview, FL | Groundwork Construction Co. of Miami

ADU Site Prep & Utilities in Westview - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Westview, FL: What the Job Actually Costs

Site prep and utilities for a detached ADU in Westview run $45,000 – $130,000 for a full new-construction hookup and slab package, and most jobs take 11 to 16 weeks from the first day of clearing to the final utility inspection. That number covers grading, concrete work, the water and sewer tie-in, the electrical service run, and the permits that go with them. Call (833) 968-1198 to schedule a free on-site estimate before you commit to a site plan.

Call (833) 968-1198

How Our ADU Site Prep & Utilities Team Works Through the Job

No two Westview lots start the same way, but the sequence is honest and repeatable. Here’s what actually happens, in order, and what you decide along the way.

Stage 1: Site survey, soil check, and utility locate (days 1 – 3)

We pull a utility locate on the parcel and confirm where the existing water lateral, sewer stub, and electrical feed sit. On a tight infill lot, that survey is the single biggest factor in whether the soil under your slab meets the load requirement Miami-Dade County will demand. You get a written narrative of what we found and a line-item number for the concrete work before anyone swings a hammer.

Stage 2: Demolition and clearing (days 4 – 7)

Old slabs, dead trees, and leftover fence lines come out. On these small lots the demo work is faster than the hauling and permits, which is why this stage can leak time if the dumpster permit runs late. We pull that paperwork early. The homeowner’s one job here is to sign off on the grading plan the county inspector will review.

Stage 3: Grading, excavation, and underground rough-in (weeks 2 – 5)

We excavate for the footing and slab, dig the sanitary sewer line and water service trench, and rough the electrical conduit and gas line out to the ADU footprint and back to the main dwelling. This is where the price can move: a long trench run to the street or a run under a driveway adds significant material and labor. You decide at this stage how the ADU connects to the main house: a direct service tap or a separate meter stack. Both are legitimate; the trade-off is cost upfront versus future bill handling.

Stage 4: Slab, flatwork, and utility connection (weeks 6 – 9)

The slab goes down, the concrete pad for the HOA-compliant AC equipment gets set, and we make the actual connections at the county meter and service lateral. Electrical inspections are usually the pace-setter here, so get your inspection scheduled as soon as the conduit is signed off. We coordinate that scheduling directly with Miami-Dade’s building department since the unincorporated Westview parcels are handled there.

Stage 5: Final inspections and turnover (weeks 10 – 16)

Concrete, electrical, plumbing, and building inspections close out the package. You get a plan review record, the utility connection record, and a documented walkthrough. Most Westview jobs at this point are ready for the ADU build itself. This is also where we recommend pairing the site package with a Full Bathroom Remodeling in Westview inside the new footprint once the structure is framed, since roughing the plumbing now saves a rough-in retrofit later.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Weigh Before the Slab Pours

Every ADU site prep package is a series of material and configuration calls. Here’s where the real decisions happen and how each one changes the number.

  • Water and sewer service size: A single dedicated ¾-inch service tap runs less than a full-meter downstream run to the street, but a second meter means a second account and separate billing. Choose the tap for lower upfront cost; choose the dedicated meter if you plan to rent the ADU separately.
  • Electrical service: A 100-amp subpanel fed from the main house is the lower-cost path. A dedicated 200-amp service with its own meter is more expensive but gives the ADU full independence. Most families going the rental route choose the 200-amp.
  • Plumbing rough-in grading: Chlorinated PVC (CPVC) and PEX both hold up in South Florida, but PEX resists the hard water scaling in this area better. Use American Standard or Delta fixtures where a tub or toilet lands inside the ADU so the trim lasts.
  • Concrete grade and reinforcement: Standard 2,500-psi slab with wire mesh meets code for a detached ADU. A 3,000-psi mix with rebar adds cost but handles the sandy, waterlogged soils in older Westview lots more predictably.
  • Grading and drainage: A French drain and swale system is optional, but on a lot that slopes toward the alley it prevents the crawlspace flooding that kills ADU floor systems. Budget for it upfront; water damage after the fact costs more.

What ADU Site Prep & Utilities Costs in Westview, FL

The honest answer: $45,000 – $130,000 for the site prep and utilities package alone, before the ADU structure goes up. If you’re pairing this with a detached build, the full ADU Construction range in Westview sits between $90,000 and $220,000.

What pushes a job to the top of that range:

  • Trench run length: A 30-foot service line is cheap. A 90-foot run to a far easement adds excavation and pipe.
  • Existing condition: An aging septic line, an old service panel, or a dead tree on the utility path adds demo and replacement.
  • Utility relocation: Moving a water lateral or rerouting a gas line means additional permits and inspection.
  • Slab and foundation scope: Sandy infill lots often need engineered fill or a deeper footing, both of which push the concrete line up.
  • Permit scope: A full site and utilities package pulls permits across multiple trades. Each one has a fee and an inspection that can add time.

What’s typically included in a written estimate: locate, survey, grading, excavation, slab, utility connections, and the inspection scheduling. What’s typically not: structural framing, ADU design or permitting (a separate job), landscaping, and finishes. Ask for the line-item list, not a lump sum. We offer upfront pricing with no surprises, and for larger packages the Home Additions & ADU team handles the wider scope.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Westview Lots Do to This Job

Westview is unincorporated Miami-Dade, which means the county reviews the plans, not a city building department. That’s a practical difference: the county handles site plan review for grading, drainage, and utility tie-ins for the whole unincorporated footprint. Expect the review window to take longer than a neighboring incorporated municipality, and plan your build calendar around it rather than fighting it.

The housing stock here is mostly 1950s – 1970s concrete-block single-family homes and small apartment buildings, plus neighborhood churches on tight lots. On those parcels, the ADU site plan often has to fit inside a narrow side yard, and the utility trench has to share space with the existing sewer lateral. Our crews have up to 12 years of experience with concrete-block construction and drill-through rigging, which is what most Westview parcels demand. The rainy season here compresses exterior excavation into a December-to-April window; we schedule site work around it. When the site package is one piece of a larger plan, that’s where Home Additions & ADU in Westview covers the wider project, and homeowners often pair this with Small & Partial Kitchen Remodels in Westview inside the main house.

Serving Westview, FL – Our Local Coverage Area

We serve Westview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Westview, FL

Get an ADU Site Prep & Utilities Estimate in Westview

If you’re planning an ADU on a Westview lot, the first step is a free on-site estimate. We’ll walk the parcel, run the utility locate, and hand you a written line-item scope with the grading, trench, and connection work priced separately. Call (833) 968-1198 to schedule. We also serve the surrounding area, including Westview and nearby Pinewood, Gladeview, and Opa-locka.

Written by the team at Groundwork Construction Co.

Why Westview Chooses Groundwork Construction Co. of Miami

We set the standard for ADU site prep & utilities in Westview.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Westview

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Westview Customers Say

Trusted by homeowners across Westview and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Site Prep & Utilities in Westview?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Westview.

(833) 968-1198

Request a Free Estimate in Westview

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch