Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat Does a Bathroom Remodel Cost in Miami, FL?
A full bathroom remodel in Miami runs $10,620 to $33,040, and that range already assumes the one thing most national cost guides skip: opening the walls of an older concrete-block home and fixing what’s behind the tile. In Miami’s pre-1970s CBS houses, spalled block, rusted rebar, and decades of trapped moisture are common, not rare. Call (833) 968-1198 for a free estimate and a live person answers, day or night. We give you a real number up front, not a lowball that climbs once the demo starts.

Why Miami Bathroom Budgets Aren’t Like the Ones You Read About Online
Open the walls of a bathroom in a 1960s Coral Gables CBS home and you’ll often find what we call the surprise behind the tile: concrete block that’s been crumbling slowly under ceramic for decades, rebar that’s gone rusty from Miami’s year-round humidity, and block that’s holding moisture it never should. National calculators don’t budget for this. Experienced Miami contractors do.
The homes here explain it. Much of the older stock is unreinforced concrete block and stucco built before 1970, sitting in salt-laden coastal air with humidity that never really quits. Poke into a shower wall that’s been sealed shut since the Johnson administration and the block underneath has had 50-plus years to take on water. We plan for that before anyone picks a vanity.
Miami Bathroom Remodel Cost Breakdown
Here’s how a real Miami bathroom budget splits up. Use this as your line-item guide, and note the masonry contingency near the bottom, which is the line most bids leave out.
| Item | Cost Range |
|---|---|
| Full bathroom remodel (all-in) | $10,620 - $33,040 |
| Small bathroom remodel | $5,900 - $14,160 |
| Walk-in shower installation | $5,310 - $14,160 |
| Tub-to-shower conversion | $4,130 - $11,800 |
| Shower replacement | $3,540 - $10,030 |
| Bathroom vanity installation | $945 - $3,540 |
| Concrete/masonry remediation contingency (pre-1970 CBS) | $1,500 - $6,000 |
That contingency covers spall repair and waterproofing on the block, and it’s standard practice for contractors who actually work in Miami’s older housing stock. It isn’t a scare tactic. It’s the difference between a bid that holds and one that grows by a few thousand dollars the day the tile comes off. Upfront pricing is the whole point: the number you see is the number you pay, with no surprise invoice mid-project.
The Waterproofing Spec That Actually Survives Miami Humidity
Drywall-backed tile installations pass code in plenty of U.S. cities. In Miami, they’re a slow failure waiting on the first wet season. Year-round humidity and driving rain work their way behind tile, and standard drywall and cement board without a proper membrane will grow mold and let water reach the framing.
We specify full membrane systems, either a Schluter or a RedGard setup, behind every tile surface inside a shower enclosure. It’s the minimum for a bathroom that holds up here, not an upsell. It does add to material cost, and we show you that line plainly so you can weigh it against the alternative: a shower that looks fine for three years and then starts leaking into the wall.
Come from the ground up and the waterproofing is part of a single accountable job. That’s why homeowners bring their whole scope to us, from foundation to finish line, rather than piecing trades together. You can see the full scope of what we handle on our Bathroom Remodeling service page.
Termites, Vanities, and Why Floor-Level Work Gets Special Treatment
Termite pressure on wood framing in Miami is severe, and a bathroom vanity cabinet or a subfloor patch sits right in the danger zone. Warmth, moisture, and wood at floor level are exactly what subterranean termites look for. We specify treated lumber and concrete backer any time we’re working at floor level, so the cabinet frame and the substrate under your tile aren’t a termite buffet.

The cost difference versus standard construction is modest on paper and enormous over ten years. A treated-lumber and concrete-backer approach keeps the structure sound and keeps your new vanity from becoming a housing project for bugs. Budget for it once and you won’t be paying to tear out a rotting cabinet in a few years.
Common Local Scenarios We Walk Into
- A 1960s Coral Gables CBS hall bath: original tile over block, hidden spalling, and a shower pan that’s been seeping for years. The masonry contingency is doing real work here.
- A Mediterranean Revival guest bath in Coral Way: charming original footprint, plumbing that predates modern shutoffs. Budget for updated supply lines before the cosmetic redo.
- A Brickell condo bath refresh: tighter footprint, condo HOA rules on water shutoff windows, and impact-rated considerations given the High Velocity Hurricane Zone. Miami-Dade’s product-approval (NOA) system means the materials carry the right approvals, not just national ones.
- A mid-century home near Biscayne Boulevard: a tub-to-shower conversion where the old substrate is gone and the membrane system is the whole project.
Who’s Actually in Your Home for This
A bathroom is the most invasive trade we run. It means access to the most private rooms in your house, over multiple days, with crews coming and going. Our technicians are background-checked and arrive in uniform, and our technicians bring up to 12 years of experience to the job. That verified professionalism is the baseline, not a selling point we dust off for the estimate.
Everything we finish is backed by our 730-Day Done Right Promise. If it’s not done right, we make it right. In a humid climate the callbacks that matter most are grout, caulk, and waterproofing failures, so “making it right” means we come back and correct the failing seal or membrane, not hand you a warranty pamphlet and disappear. That guarantee is one of the longest workmanship guarantees in residential construction, and it’s written, not implied.
Financing helps too. We offer 0% financing for 18 months plus $1,000 off projects over $10,000, so a full Miami bath redo lands within reach without draining savings. Pair that with no-hassle upfront pricing and you can plan the project against a real number. Start with the home page to see the rest of what we do.
How Do You Keep a Miami Bathroom Project on Budget?
You keep it on budget by pricing the structural wildcard up front and choosing materials on both cost and performance, not just availability. We work from a curated set of top-tier brand partners so a vanity or fixture decision is a quality call, not a scramble for whatever’s in stock. Settle the waterproofing spec and the masonry contingency before you fall in love with a tile, and the rest of the budget behaves.
FAQs
A full bathroom remodel in Miami typically costs $10,620 to $33,040, with small bathrooms landing between $5,900 and $14,160. The big variable in older concrete-block homes is the masonry work behind the tile, which we price as a $1,500 to $6,000 contingency. Call (833) 968-1198 for an exact quote, and estimates are free.
Because online calculators don’t open your walls. In pre-1970s Miami CBS homes, spalled block and rusted rebar are common finds that need repair before finish work begins, and a full membrane waterproofing system is required to survive the humidity. Those are real costs a generic estimate leaves out. Call (833) 968-1198 and we’ll walk you through a bid that includes them.
Repair is cheaper when the block and plumbing are sound; replacement wins when the substrate is gone and the layout no longer works. In a 50-year-old Miami bathroom, we assess the block and rebar first, because that determines which path actually saves you money over the long run. Call (833) 968-1198 for a free design consult and an honest read on your specific bathroom.
We answer the phone 24/7 with a live person, so you can reach us today and get the estimate scheduled fast. Bathroom remodels are planned projects rather than emergency calls, but a free estimate and design consult can happen right away. Call (833) 968-1198 to get on the schedule.
Get a Real Miami Bathroom Number
Your bathroom budget deserves a figure that accounts for what’s actually behind the tile. Call Groundwork Construction Co. of Miami at (833) 968-1198 for a free estimate and design consult, backed by upfront pricing, 0% financing for 18 months, $1,000 off projects over $10,000, and the 730-Day Done Right Promise. A live person answers around the clock.
Written by the team at Groundwork Construction Co. of Miami, serving Miami, FL.
What Our Customers Say
"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong