A Groundwork company - serving Miami, FL

Wellborn Home Additions & ADU in Miami, FL

Home additions & ADUHome additions & ADU
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Wellborn Home Additions & ADU: The Miami Owner’s Guide

We build Wellborn-compatible home additions and ADUs in Miami, and a finished, permitted addition typically runs $53,100 – $153,400 installed depending on footprint, foundation type, and finish level. Detached ADUs are a separate budget: $106,200 – $259,600, and garage conversions land at $35,400 – $94,400. We plan these projects, so nothing happens same-day; what we can do is give you a real number on a free estimate. Groundwork Construction Co. of Miami is an independent builder and is not affiliated with Wellborn.

Construction workers preparing for a professional residential fence installation project. in Miami, FL

Call (833) 968-1198

Owners usually arrive at this page mid-project, not at the start. The addition got framed and dried in, then a subcontractor vanished, or the finishes never matched the main house. Others bought a house with an unpermitted addition and found out during a Miami-Dade inspection or a refinance appraisal. Whatever brought you here, the first step is the same: figure out what’s actually permitted, what’s actually built, and what it costs to close the gap.

Which Wellborn Models This Applies To

Wellborn doesn’t build additions, so “Wellborn-compatible” means the cabinetry, built-ins, and millwork package inside the addition is spec’d to match Wellborn lines already in your home. That matters most in an ADU kitchenette or a mother-in-law suite, where homeowners want the new space to read as part of the same house, not an afterthought.

Identifying the right match starts with a label, not a guess. Wellborn cabinet boxes carry a series and finish code inside the door or on the back panel, and the door profile has a name and a species. Photograph that label before you call anyone. The compatibility gotcha we see most in Miami: a discontinued finish or a door style that’s been revised will not match across a new run, and dye-lot variation on painted finishes shows on a wall of cabinets in south-facing Florida light, even when the code matches. On a partial run, we usually recommend matching the profile and accepting a close finish, or refacing the existing run so everything comes from one batch.

OEM versus aftermarket for Wellborn: OEM is the right call when the addition shares sightlines with existing cabinetry and you want a true match. A quality aftermarket equivalent makes sense in a detached ADU, where nothing sits beside the original boxes and the money is better spent on impact glazing or a stronger roof deck.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your Wellborn Home Additions & ADU Is Failing

“Failing” on an addition rarely means the walls are falling down. It usually means one of these five things, and each tells you something different about the fix.

  • Soft or sloping floors near the new perimeter. Under a slab-on-grade addition in Miami’s water table, that’s often soil settlement or a footing that wasn’t sized for our sandy, high-moisture soil. It shows up first at door thresholds and along the tie-in to the original house.
  • Sticking doors and hairline cracks at the tie-in wall. The new structure and the original house move differently. A missing or undersized expansion joint at that seam lets the two fight each other, and drywall cracks follow.
  • Water staining at the flat-roof or low-slope tie-in. Our summer downpours find every weak flashing detail. If the addition roof meets the main roof at a valley with no cricket, water ponds and works its way in within a season or two.
  • Mold or musty smell in the new room. Miami humidity needs the addition’s HVAC to be sized and ducted for the added square footage, plus a proper vapor barrier under the slab. A mini-split added later often means the original system was never upsized.
  • Code or permit paperwork that doesn’t match what’s built. Wrong egress window size, a bedroom without a closet or a legal second exit, an ADU with no recorded utility meter. This one surfaces at resale, appraisal, or insurance renewal, and it’s the most expensive to unwind.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Here’s what a Miami addition or ADU actually costs to build or bring up to standard, with parts, labor, permits, and inspections folded into each range:

  • Home addition (attached, finished, permitted): $53,100 – $153,400
  • Detached ADU: $106,200 – $259,600
  • Garage conversion to living space or ADU: $35,400 – $94,400

The range is driven by square footage first, then foundation type (slab versus raised), roof structure, impact-rated glazing, and whether the existing electrical panel has capacity for the added load. In Miami, a panel upgrade is a common hidden line item, and so is the impact-window package. You get a written, line-item quote with upfront pricing, no surprises: the number you see is the number you pay. Every addition we build is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right, in writing. Permits get pulled and inspections get passed, because an unpermitted addition costs you more at resale than it ever saved.

DIY or Call Us?

Here’s the honest split. You can safely check your own paperwork: pull the permit history from Miami-Dade County’s online portal, find the addition on your survey, and photograph the Wellborn labels and any visible framing or flashing. You can also note where cracks, stains, or soft spots are.

Everything structural is where DIY goes wrong. Foundation work, roof tie-in flashing, load-bearing wall changes, and electrical panel work for an added HVAC load are all genuinely dangerous, and a bad fix on any of them costs several times what the right fix would have. If your addition is unpermitted, correcting it involves engineering, permitting, and inspection that an owner can’t self-certify. This is where you call a licensed, insured crew. We’ll walk the space, tell you what’s built right, what isn’t, and what it costs to fix. Call (833) 968-1198 for a free estimate, and a background-checked, uniformed technician will come out.

FAQs

Need Construction help nationwide? Licensed & insured · free written estimates
Call (833) 968-1198
Local Service Coverage

Request a Free Estimate in Miami

Tell us what you need - Groundwork Construction Co. of Miami responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch