Full Bathroom Remodeling in Olympia Heights, FL: Scope, Timeline, and Cost
Full bathroom remodeling in Olympia Heights typically runs $9,000 – $28,000 and takes 3 to 6 weeks once permits clear, with most of that gap set by the tile and fixture package you pick. The job means gutting the room to the studs and the slab, replacing the plumbing rough-in, electrical, and waterproofing, then hanging new finishes from floor to ceiling. To price your own bathroom, call (833) 968-1198. The estimate is free, line by line, and it’s handled by a live person.
How the work actually runs, stage by stage
Most contractors wave a hand and say “we handle everything.” Here’s what those weeks actually contain, so you know what to expect and what you’ll be deciding.
Days 1 – 2: demo and discovery. The crew strips tile, vanity, tub or shower, drywall, and flooring down to the concrete block and slab. This is when surprises surface. In 1950s – 70s concrete-block homes, we frequently find a cast-iron drain past its life or framing that was never waterproofed correctly. You’ll decide then whether to replace the drain and re-rough the drain line or patch and move on. The first is more money up front, but it’s the difference between a bathroom that lasts and one you revisit in five years.
Days 3 – 4: rough-in and inspections. New supply lines, drain lines, and electrical go in, plus blocking for grab bars if you want them. Then it stops for inspection. Miami-Dade County runs a plumbing and electrical rough inspection before any wall closes. We schedule it, pull the permits in your name, and don’t cover a single wall until it passes. That inspection is why a permitted job adds days a handyman’s job doesn’t. It’s also the only way an inspector ever sees what’s behind your tile.
Days 5 – 7: waterproofing and board. Cement board goes up and the whole wet zone gets a continuous waterproofing membrane – not paint-on in the corners and skip the rest. In a climate this humid, a shower that’s watertight at the base and leaky at the seams grows mold you can’t see until the tile pops. You’ll want to see the membrane before tile goes over it. We photograph it.
Days 8 – 21: tile and finishes. Floor tile, wall tile, grout, then vanity, toilet, fixtures, and glass. This is the stage with the most homeowner decisions, and it’s also the one where lead times bite. Order tile and fixtures by day five or the schedule slides. A special-order vanity that shows up three weeks late is the single most common reason a bathroom job stalls in Olympia Heights.
Final days: punch list and walkthrough. We test every drain and valve, caulk, seal, and walk you through the finished room. Anything on your list gets fixed before we’re done. That’s not a goodwill gesture – it’s covered by our 730-Day Done Right Promise, which stands behind the workmanship for two full years. If it isn’t done right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll be choosing between
- Tile grade: porcelain versus natural stone. Porcelain runs less and holds up to humidity with near-zero maintenance; travertine and marble look warmer but need sealing and stain more easily near a shower.
- Shower base: a pre-formed pan versus a mud-set tile floor. The pre-formed pan is faster and seals reliably; a mud-set floor lets you match the shower floor to the room tile and slope it exactly to the drain, but it’s more labor and more skill-dependent.
- Waterproofing: liquid membrane versus a sheet membrane system. Liquid goes on like paint and cures into a rubbery coat; sheet systems are a bonded fabric that handles movement better in block walls. Either works – the failure is skipping it or cutting corners, never the brand.
- Fixtures: a mid-tier big-box faucet versus a name-brand one. Kohler and comparable brands cost more up front and last years longer; the cheap cartridge is what fails and dribbles at year three.
- Vanity and storage: a stock vanity versus a semi-custom cabinet. Stock arrives fast and fits a standard footprint; semi-custom buys you the exact width and drawer layout for a room that isn’t square, which many mid-century bathrooms aren’t.
- Ventilation: a standard exhaust fan versus a humidity-sensing unit. In this climate, a fan on a timer isn’t always enough. A humidity-sensing fan costs a little more and runs until the room dries out, which is what actually protects the drywall and paint.
What Full Bathroom Remodeling costs in Olympia Heights, FL
Expect $9,000 – $28,000 for a full gut-and-rebuild of a standard hall or primary bath, with the low end landing on a compact room kept in its current plumbing layout and the high end on a larger room with moved fixtures and premium tile. Here’s where the number moves:
- Room size: a 5×8 hall bath sits near the bottom; a 10×12 primary bath pushes toward the top.
- Moving plumbing: keeping the toilet, sink, and shower where they are saves real money. Relocating a drain through a concrete slab means cutting, re-pouring, and re-inspecting.
- Existing condition: a failed drain or water-damaged framing adds labor and materials you can’t see until demo.
- Material grade: tile and fixture choices can swing the total by several thousand dollars on the same footprint.
- Permit scope: plumbing and electrical changes expand the permit and the inspection count, which adds time and a modest fee.
Your written estimate itemizes demo, rough-in, waterproofing, tile, fixtures, and permits – the number you see is the number you pay. No change orders unless you change the scope yourself.
See the difference
Before
After
Before
After
Before
AfterWhat Olympia Heights homes specifically do to this job
Most of what we remodel here is 1950s – 70s concrete-block and stucco ranch stock, and that shapes the work in ways a new build doesn’t. Those homes were built on shallow footings over porous Miami limestone with minimal grading, so plumbing through a slab is a genuine operation, not a quick cut. The dense Cuban-American homeowner culture here also means many of these bathrooms sit inside homes that have been expanded over generations, so you’ll often find an enclosed carport or a rear addition where walls and drains don’t line up the way the original plans show.
Permitting runs through Miami-Dade County, and the post-Andrew wind code and NOA product-approval process apply even to minor structural changes. A permit package assembled by someone who knows the process clears inspection on schedule; one that isn’t gets flagged and stalls the job. We pull the permits and manage the inspections so that doesn’t land on you. The subtropical marine climate carries its own demands: intense summer sun and heavy seasonal downpours mean UV-resistant finishes, continuous waterproofing, and ventilation that actually extracts moisture, not just moves it around. When the same stucco-and-roof envelope is being touched anyway, homeowners often pair the bathroom with Roof Repair in Olympia Heights or a Roof Replacement & Installation in Olympia Heights so the whole house gets sealed in one pass. If the scope grows to cabinets and layout in a neighboring room, that’s part of a Bathroom Remodeling in Olympia Heights conversation, and our Bathroom Remodeling service covers the wider picture. We work across Olympia Heights and the surrounding neighborhoods, including ZIP 33165.
Serving Olympia Heights, FL – Our Local Coverage Area
We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Full Bathroom Remodeling in Olympia Heights
Most full bathroom remodels take 3 to 6 weeks from demo to walkthrough. The variable is inspection scheduling and material lead times, so ordering tile and fixtures early keeps the job on schedule. Call (833) 968-1198 and we’ll give you a realistic date range for your room, not a promise.
Yes – any full remodel that touches plumbing, electrical, or structural work needs a Miami-Dade County permit and inspections. We pull the permit in your name and manage the inspection schedule. The cost is modest and it’s the only way the work behind your tile ever gets inspected. Call us for a quote that includes the permit line.
Yes – keeping the toilet, sink, and shower in their current positions is common and saves money. Moving a drain through the concrete slab is a real operation with cutting and re-pouring. If your layout works, we’ll tell you so; if it doesn’t, we’ll show you what moving it costs before you decide. Call (833) 968-1198 for a free estimate.
Full bathroom remodeling here runs $9,000 – $28,000. Where you land depends on room size, whether plumbing moves, the condition found at demo, and your tile and fixture grade. Every estimate is itemized and written, and the number you see is the number you pay. Call (833) 968-1198 for an exact quote – estimates are free.
Every full bathroom remodel is covered by our 730-Day Done Right Promise – two full years on workmanship. If something isn’t right, we come back and make it right. Our technicians have up to 12 years of experience, and the guarantee is in writing, not a verbal promise.
Get a free full bathroom remodel estimate in Olympia Heights
Call (833) 968-1198 to schedule your free on-site estimate for full bathroom remodeling in Olympia Heights. A live person answers around the clock, so you won’t hit a voicemail. We’ll walk the room, talk through your options and the real timeline, and hand you a written line-item estimate with the permit and financing details spelled out – including 0% financing for 18 months and $1,000 off projects over $10,000.