Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in South Miami, FL: What It Really Involves
Full bathroom remodeling in South Miami means gutting the room to the studs and rebuilding it: demolition, new rough plumbing and electrical, backer board and waterproofing, tile, fixtures, and a final inspection before the walls close. Most South Miami full bathroom remodels run 4 to 6 weeks of active work, and they typically cost $10,620 to $33,040. Call (833) 968-1198 for a free on-site estimate and a written, line-item scope.
How a Full Bathroom Remodel Runs, Stage by Stage

A full gut renovation has a real sequence, and the decisions land in a predictable order. Here is what actually happens between the first hammer swing and the final walkthrough.
- Stage 1: Demolition and discovery (days 1 – 3). We pull the fixture set, strip tile and drywall to the studs, and open the floor around the drain. This is where we find out what the room is really made of – 1950s CBS block behind the tile, old cast-iron or galvanized lines, or a surprise layer of mud-set tile over a mortar bed. You decide nothing here; we document and photograph what’s found. Dumpster and permit posting fall in this window.
- Stage 2: Rough-in (days 3 – 7). Licensed plumbing and electrical run new supply, drain, and vent lines and set boxes for the vanity, fan, and lighting. If you’re keeping the fixture layout, this is fast; if you’re moving the toilet or shower, the drain relocations add days and cost. This is the moment to finalize valve positions and confirm your rough-in dimensions before the walls close.
- Stage 3: Inspections and close-up (days 7 – 9). The rough plumbing and electrical inspections happen before backer board goes up. Nobody skips this step, and skipping it is why some bathrooms fail at resale. After sign-off, our crews hang moisture-resistant board, then Schluter waterproofing membrane on the wet areas.
- Stage 4: Tile, setting, and finishes (days 9 – 20). Floor tile, shower walls, grout, then vanity cabinet, countertop, faucets, toilet, mirror, and lighting. You’ll pick tile and fixtures in the planning phase, not mid-project. This is the longest visible stretch and where the room starts to take shape.
- Stage 5: Final inspection and punch list (days 20 – 28 and beyond). The final building inspection, a written punch list, and a walkthrough with you. Then the 730-Day Done Right Promise kicks in – if anything isn’t right, we make it right.
Most South Miami full bathroom remodels finish in roughly four to six weeks of working days. Schedule matters here. Summer thunderstorms and the permitting calendar both shape when material deliveries and inspection slots land.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape a Full Bathroom Remodel
Once the room is open, the spec decisions are what you’re really paying for. Here’s what you’re choosing between, with the honest trade-offs.
- Shower and tub configuration. A full walk-in shower with a linear drain and Schluter waterproofing is the modern default and costs more upfront than a standard pan, but it holds up better in South Florida humidity. A tub-and-shower combo is cheaper and gives you a tub, but it eats floor space in a 5-by-8 room.
- Vanity and countertop. A standard 30-inch vanity with a quartz or solid-surface top handles a small footprint; a double vanity needs at least 60 inches and rewrites the plumbing. Delta and American Standard fixtures are the workhorse picks; Toto toilets carry a higher price for a quieter, more efficient flush.
- Tile. Porcelain is the durable, low-maintenance choice for floors and wet walls. Natural stone (marble, travertine) looks warmer but needs sealing and shows water spotting – and in South Miami’s humidity, stone in a shower is a maintenance commitment, not a one-time finish.
- Waterproofing system. A bonded membrane like Schluter in the shower and wet floor is what keeps a remodel from becoming a leak behind the wall. It’s not glamorous, but it’s the difference between a bathroom that lasts and one that molds.
- Ventilation. A properly sized exhaust fan piped to the exterior, not into the attic, matters more in Florida than anywhere. Ask for it explicitly on the estimate.
What Full Bathroom Remodeling Costs in South Miami, FL

Full bathroom remodeling in South Miami runs $10,620 to $33,040 for a complete gut renovation, with most mid-century homes landing in the $15,000 to $24,000 range. The spread comes down to four variables.
Size and layout. A 40-square-foot hall bath is at the low end; a 75-square-foot primary with a double vanity and walk-in shower pushes toward the top.
Existing condition. Opening a 1950s block home often reveals galvanized supply lines, cracked cast iron, or tile embedded in a mortar bed that adds demolition days. Rotten subfloor or a slow leak found during demo is the most common cost bump.
Relocating plumbing, electrical, or structure. Moving the toilet or shower drain, rerouting electrical for a new lighting plan, or opening a wall changes the job from a refit to a reconfiguration. Each adds cost and inspection scope.
Material grade and permit scope. Porcelain versus natural stone, a stock vanity versus a custom one, and a full permit set for plumbing and electrical all move the number.
Your written estimate itemizes demolition, rough-in, waterproofing, tile, fixtures, labor, and permit fees separately. What it typically does not include: structural repairs discovered behind the walls, HOA application fees, and fixture upgrades you choose after the contract is signed. No-hassle upfront pricing means the number you see is the number you pay on the agreed scope.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami Homes Do to a Bathroom Remodel
South Miami is its own jurisdiction, not Miami-Dade County, with its own building department and review process. On any remodel that touches structure or adds square footage, plan review is granular. A large share of the housing stock is 1940s – 1960s concrete-block and CBS construction with terrazzo or tile floors and small footprints, so a bathroom gut often uncovers a mortar bed under the tile, cast-iron drain lines, and undersized electrical. On tight infill lots near the mature live oaks, tree surveys and root-protection zones can reshape where you can trench or stage material. We see the same failure patterns in these older baths: failed pan liners, mold behind tile on an exterior block wall, and fans vented into the attic. If exterior work comes up alongside the bathroom, homeowners often pair this with Roof Repair in South Miami or a full Roof Replacement & Installation in South Miami. If you’re reworking multiple rooms at once, this fits naturally into Bathroom Remodeling in South Miami or our broader Bathroom Remodeling service. We cover South Miami and the surrounding neighborhoods including Glenvar Heights and Coral Terrace.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in South Miami

A typical full bathroom remodel in South Miami takes 4 to 6 weeks of active work, plus a week or two of planning and permit review before demo begins. If you’re moving plumbing or opening a wall, add a week. Call (833) 968-1198 for a schedule estimate tied to your specific bathroom.
Yes, almost always. Full bathroom remodeling that touches plumbing, electrical, or structure requires permits from the City of South Miami building department, with rough and final inspections. This is the company pulling the permit, not you. Call (833) 968-1198 to walk through what your project needs.
Yes, and it’s the most common way to hold a full bathroom remodel to the lower end of the range. Keeping the toilet, shower, and sink in place avoids drain relocation and cuts both labor and inspection scope. You still get new tile, fixtures, waterproofing, and finishes.
Expect $10,620 to $33,040 for a complete gut renovation in South Miami, depending on size, condition, layout changes, and material grade. Call (833) 968-1198 for an exact quote – estimates are free.
Every full bathroom remodel we complete is backed by our 730-Day Done Right Promise. If anything we built isn’t right, we make it right. Calls are answered by a live person 24/7, and our technicians are background-checked and arrive in uniform.
Get a Free Estimate for Full Bathroom Remodeling in South Miami
If you’re planning full bathroom remodeling in South Miami, start with a free on-site estimate. We’ll measure the room, open up what we can see, talk through the layout and material choices, and hand you a written line-item quote with no surprises. Promotions include $1,000 off projects over $10,000 and 0% financing for 18 months. Call (833) 968-1198 to schedule.
Written by the team at Groundwork Construction Co.