Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Fountainebleau, FL: What It Costs and How Long It Takes
A full kitchen remodeling in Fountainebleau, FL runs $14,000 – $45,000 and typically takes 5 to 9 weeks from demo to final walkthrough, depending on whether you’re moving plumbing or walls. The work includes tear-out, new cabinet and counter, flooring, lighting and electrical, backsplash, sink and fixture, and final inspections. Call (833) 968-1198 for a free on-site estimate with a written line-item scope.
What a Full Kitchen Remodeling Project Actually Looks Like, Stage by Stage
Most contractors tell you “we handle everything.” That’s not a schedule. Here’s what day one through the final week looks like on a full kitchen remodel in Fountainebleau.
Stage 1: Demo and rough-in protection (days 1 – 3)
Crews mask adjacent rooms, lay floor protection, shut off and cap utilities, then strip cabinets, counter, backsplash, and flooring. If the plan includes new plumbing or electrical, the rough-in opens the walls in this window. You decide ahead of time which appliances stay, which get replaced, and where the new outlets go. Older Fountainebleau kitchens often hide surprises behind the drywall: galvanized supply lines, undocumented junction boxes, or a soffit that was never framed for a load.
Stage 2: Rough-in trades and inspection (days 3 – 10)
Plumbing, electrical, and any HVAC or structural work happen here. In unincorporated Miami-Dade, rough-in inspections must pass before walls close. We schedule the inspection and don’t cover anything until the sticker is on. You decide the sink location, the lighting plan, and under-cabinet power runs in this stretch. Every material change here costs less than a change after tile.
Stage 3: Drywall, prime, and layout (days 10 – 18)
Walls close, drywall goes up, seams get taped and primed, and cabinet layout is marked. This is when the room finally takes shape and you can see traffic flow. It’s also your last easy window to move a light or add an outlet before finishes go down. Most jobs hold here for 2 – 3 days while cabinets and countertops are ordered and staged.
Stage 4: Cabinet, counter, and finish install (days 18 – 35)
Cabinet boxes go in, uppers and lowers get leveled and shimmed, doors and hardware follow. Templates get taken for stone, and the slab is cut and set. Backsplash, sink, faucet, and appliances drop in. If you’re planning related projects, this is when homeowners often pair this with Full Bathroom Remodeling in Fountainebleau to save on demo and scheduling.
Stage 5: Final inspections and punch list (days 35 – 45)
Final electrical and plumbing inspections close out the permit. Floors finish, trim goes up, caulk and paint get touched in. We walk the room with you, write a punch list, and schedule the return visit. Cabinets and counters are backed by manufacturer warranties; labor is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make: Materials, Grades, and Trade-Offs
- Cabinet construction: Particleboard boxes with stapled joints hold up 10 – 15 years in a humid South Florida kitchen. Plywood boxes with dado joints and solid-wood or MDF-painted doors last 20 – 30. The price spread is meaningful; the lifespan gap is bigger.
- Countertop material: Laminate lands low but shows seams and scorch marks. Quartz is non-porous, doesn’t need sealing, and handles Miami’s humidity without issue. Granite is durable but needs resealing annually. Porcelain slabs cost more than quartz and win on heat and stain.
- Sink and faucet: Undermount stainless is standard and forgiving. Fireclay farmhouse sinks look right in a renovated kitchen but need a cabinet that accommodates the apron. Brands like Delta and Kohler hold up well and parts are easy to source for decades.
- Waterproofing under tile: Schluter membrane under kitchen floor tile handles slab moisture in a way cement board alone does not. Worth the upcharge every time, especially if the slab sits on grade.
- Flooring: Porcelain tile is impervious and handles moisture. Luxury vinyl plank floats and is forgiving of slab cracks. Engineered hardwood looks best but expands and contracts in year-round humidity; solid hardwood is a commitment in a Fountainebleau kitchen.
- Lighting: Recessed cans plus under-cabinet LED strip are the practical baseline. Adding pendants over a peninsula or island is 1 – 2 hours of added work and a few hundred in materials.
What Full Kitchen Remodeling Costs in Fountainebleau, FL
Full kitchen remodeling in Fountainebleau runs $14,000 – $45,000 for most homes. Small or partial remodels sit lower; that project type has its own page and range.
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation: $3,000 – $10,000 (where layout allows)
Five things move the number:
- Size and layout: A galley at 90 square feet costs less to finish than an open 250-square-foot kitchen with a peninsula.
- Existing condition: Old galvanized plumbing, aluminum wiring, or a soffit that needs removing adds labor and inspection steps.
- Relocation: Moving the sink, range, or refrigerator more than a few feet means new supply, drain, and vent lines.
- Material grade: The gap between stock cabinets and semi-custom is often bigger than the gap between quartz and laminate.
- Permit scope: A like-for-like swap permits faster than a project that touches plumbing, electrical, or structure.
A written estimate from us lists line items, brands, and quantities. It includes demo, haul-away, install labor, permit pulls, and final inspection. It does not include appliance purchase (unless you ask us to source), structural engineering if a load-bearing wall is involved, or HOA application fees. Expect upfront pricing, no surprises. Call (833) 968-1198 for an exact figure.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau Homes Specifically Do to This Job
Most kitchens we remodel in Fountainebleau sit inside 1970s-to-2000s masonry buildings along the 33172 corridor, where walls are stucco-over-concrete-block and cabinets mount to furring strips rather than wood frame. That changes the job. Anchoring upper cabinets needs the right fasteners and layout, and the wall behind often needs to be leveled before boxes go up. Ceilings in mid-rise units are usually lower than in newer construction, which pushes cabinet heights down and sometimes forces an alternative to ceiling-height uppers.
Permitting here means Miami-Dade County, not a small city hall. Plans route through the county, and any hurricane-rated product you specify (impact-rated windows in a kitchen addition, for instance) has to carry a Miami-Dade Notice of Approval. That’s a stricter system than most neighboring jurisdictions, and paperwork timing matters. If your building is hitting its 25 or 40-year recertification milestone, the recert team may have questions about interior penetrations too, so we coordinate the permit scope early. Building HOA approval also adds a step: most Fountainebleau condo and townhome associations require a submission before work begins, and we prepare the packet with the drawings and scope. Summer scheduling means afternoon thunderstorms and storm-season permit crunches, so we build weather-flex days into the timeline. Our technicians have up to 12 years of experience working with concrete-block construction, and it matters on every cut and anchor point.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions: Full Kitchen Remodeling in Fountainebleau
A full kitchen remodeling in Fountainebleau takes 5 to 9 weeks on site, from demo to final inspection. Add permit review time before demo if plumbing, electrical, or structure is moving. Call (833) 968-1198 to talk through scope and timing on your kitchen.
Yes. Any full kitchen remodeling in unincorporated Miami-Dade moves electrical and plumbing, which triggers permit and inspection requirements. Cosmetic swaps only (paint, hardware, like-for-like appliance replacement) can sometimes skip permitting. Our team pulls the permit for you and schedules the inspections.
Yes. A full kitchen remodeling that keeps the sink, range, and refrigerator locations stays within the same plumbing and structural footprint, which cuts both cost and timeline. Expect closer to the low end of the $14,000 – $45,000 range. Major layout changes are the usual cause of a project climbing toward the top of the range.
Full kitchen remodeling in Fountainebleau costs $14,000 – $45,000 for most homes, driven by size, existing condition, relocation of services, material grade, and permit scope. A written estimate from us breaks the number down line by line. Call (833) 968-1198 for an exact figure.
Every full kitchen remodeling we do is covered by our 730-Day Done Right Promise. If something we installed isn’t right, we come back and make it right. Cabinet and countertop manufacturers also carry their own warranties, and we register them on your behalf.
Get a Free On-Site Estimate for Your Fountainebleau Kitchen
Call (833) 968-1198 to schedule a free estimate for full kitchen remodeling in Fountainebleau. We walk the space, measure, note the plumbing and electrical condition, and talk through material options. You leave with a written line-item scope, a realistic schedule, and no surprise pricing later. Live person, 24/7. Background-checked, uniformed technicians on the visit. Our Kitchen Remodeling in Fountainebleau page covers the broader service if you’re still deciding what scope fits the project. Homeowners often pair a kitchen project with Walk-In Showers & Shower Remodeling in Fountainebleau to consolidate the disruption. Our Kitchen Remodeling service line is the hub if you want to see how we run these jobs. We cover the whole Fountainebleau area and surrounding neighborhoods.
Written by the team at Groundwork Construction Co.