Garage Conversion ADU in Coral Terrace, FL | Groundwork Construction Co. of Miami

Garage Conversion ADU in Coral Terrace - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Coral Terrace, FL: What It Costs and How Long It Takes

A garage conversion ADU in Coral Terrace typically runs $45,000 to $130,000 and takes three to five months from demolition to final inspection, depending on whether the slab stays, whether plumbing moves, and whether the garage door gets replaced with a wind-rated wall. The work turns an existing garage footprint into a permitted, livable unit, and because the shell already exists, you’re paying for systems, finishes and inspection compliance rather than new structure. Call (833) 968-1198 to set up a free on-site estimate specific to your Coral Terrace property.

Call (833) 968-1198

How a Garage Conversion ADU Comes Together, Stage by Stage

Every conversion follows roughly the same sequence here. What changes is how much of the existing garage fights back, which on Coral Terrace’s post-war lots it often does.

Stage 1: Assessment and drawings (1 – 3 weeks)

We measure the slab, check ceiling height, and map the existing electrical panel and any plumbing that runs under or through the garage. You decide the unit’s layout at this point: studio with a full bath, or a one-bedroom with a small galley kitchen. Then come the drawings and the county submittal, which for an unincorporated Coral Terrace property goes through Miami-Dade County rather than a municipal building department.

Stage 2: Demo and slab work (1 – 2 weeks)

Out comes the old door, the tracks, and any shelving or water heater. We check the slab for cracks and moisture intrusion, since many of these 1950s – 1970s garages sit at or just above grade. A new floor build-up usually includes a vapor barrier and either a sleeper system or a self-leveling pour. You choose the finished floor here: luxury vinyl plank is the common pick for cost and moisture tolerance, tile handles a wet bath better, and polished concrete is the cheapest and most durable if you like the look.

Stage 3: Electrical, plumbing and mechanical rough-in (2 – 3 weeks)

This is where budgets move. A new subpanel and dedicated circuits are standard. Plumbing gets harder if the garage slab is post-tension or if the bathroom has to tie into a drain line on the far side of the house. Rough-in gets inspected before anything closes up, so scheduling with the county drives the calendar. Decide now on the water heater type (tankless versus a small tank) and on mini-split versus a ducted system; the mini-split is usually the right answer for a single-room unit.

Stage 4: Insulation, drywall and the exterior envelope (3 – 4 weeks)

South Florida’s humidity makes this stage a waterproofing job as much as a finishing job. We seal the wall-to-slab joint, foam or batt the walls to the required R-value, and inspect the transition where the new garage-front wall meets the original block. The old door opening gets framed, sheathed and finished with a wind-rated assembly rated for the HVHZ. You’ll pick the exterior finish: stucco to match the house, or a fiber cement panel like Boral’s for a cleaner modern line.

Stage 5: Finishes, trim-out and final inspection (2 – 3 weeks)

Kitchenette, bath fixtures, door hardware, paint, and the final electrical and building inspections. Most of the homeowner’s remaining decisions land here: cabinet and countertop choices, the shower surround, and whether the unit gets its own exterior entry door or shares the house. Homeowners often pair the kitchenette finish with Cabinets & Countertops in Coral Terrace from the same project team, and floors and shower tile with Backsplash, Tile & Flooring in Coral Terrace.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

  • Bathroom layout: a full bath with tub runs toward the high end for plumbing complexity; a walk-in shower with a linear drain is simpler to build and easier to keep dry in a small unit. Tile over a bonded waterproof membrane lasts; a pre-fab surround costs less and shows wear sooner.
  • Kitchenette versus full kitchen: a sink, two-burner cooktop and under-counter fridge keeps the permit and plumbing simpler than a full range and hood, which needs dedicated circuit capacity and venting.
  • Climate control: a ductless mini-split is the standard choice for one room, costs less to install than extending the central system, and lets the tenant control their own temperature. Ducted tie-in suits a unit you plan to use as part of the main house later.
  • Garage-front assembly: a framed wall with impact windows is the common answer and keeps the house looking like a house. Impact-rated glazing from PGT or CGI meets the wind-load requirements and gets you daylight into the unit, at a higher material cost than solid wall.
  • Exterior cladding: stucco to match the existing house, or a fiber cement panel for a crisper look. Stucco needs proper control joints and paint that can take the sun; panel systems cost more up front and hold their finish longer.
  • Flooring: luxury vinyl plank as the default, tile in the bath and anywhere wet, polished concrete for the most durable and lowest-cost option.

What a Garage Conversion ADU Costs in Coral Terrace, FL

Most Coral Terrace garage conversions land between $45,000 and $130,000. The parent scope, if the unit is part of a larger Home Additions & ADU in Coral Terrace plan, prices differently, but a standalone conversion sits in that band. Five variables push the number:

  • Size and layout: a one-car garage at roughly 200 – 250 square feet converts for less than a two-car at 400-plus square feet, mostly because of flooring, drywall and cabinet counts.
  • Plumbing distance: tying a new bath into the main drain line runs $3,000 – $12,000 on its own when the run is long or the slab must be cut.
  • Electrical service: a new subpanel, dedicated circuits and possibly a service upgrade add $2,500 – $8,000.
  • Envelope and wind rating: replacing the garage door with a rated wall and impact glazing adds $6,000 – $18,000 depending on opening size and product line.
  • Finish grade: builder-grade finishes and custom kitchenette cabinetry can sit $20,000 apart on the same footprint.

A written estimate itemizes demolition, framing, the electrical and plumbing rough-in, insulation and drywall, flooring, kitchenette and bath, exterior work, and permits. What it typically excludes: any foundation repair discovered under the slab, termite treatment, landscaping restoration, and separate utility connection fees if the unit gets its own meter. Our pricing is upfront and the number on the estimate is the number you pay; projects over $10,000 qualify for $1,000 off, and 0% financing for 18 months is available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Coral Terrace Homes Do to This Job

Coral Terrace is unincorporated Miami-Dade, ZIP 33155, just south of Coral Gables, and that boundary matters more than most homeowners expect. The same job that would need a city permit a couple of blocks north runs through the Miami-Dade County Building Department here, and county inspection scheduling rather than a small-town permit window shapes the sequencing and timeline on nearly every conversion. Because the neighborhood is dominated by 1950s – 1970s single-story concrete-block ranch homes on small subdivided infill lots, we regularly find garages that were never wired for much beyond a light and an opener, aging panels that need replacement before a subpanel can be added, and block walls that need careful anchoring for new framing. Many of these homes also sit on flat or low-slope roofs that fail fast in hurricane-season rain, which is why we inspect the roof-to-wall junction and the garage front flashing before closing anything up. The flood zone that drains toward the Coral Gables canal system makes vapor barriers and slab moisture control non-negotiable, and the salt-laden humid air means the waterproofing and wind-rated assemblies are held to the HVHZ standard rather than treated as an upgrade.

Serving Coral Terrace, FL – Our Local Coverage Area

We serve Coral Terrace and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Coral Terrace

Schedule a Free Estimate for Your Garage Conversion ADU in Coral Terrace

Call (833) 968-1198 to book a free on-site estimate. A live person answers, day or night. On the visit we’ll measure the garage, check the slab and panel, and walk you through the permit path through Miami-Dade County. You’ll get a written, line-item quote with upfront pricing and a clear start date. Our technicians have up to 12 years of experience, and our home additions and ADU work across Coral Terrace is coordinated through our Home Additions & ADU service.

Written by the team at Groundwork Construction Co.

Why Coral Terrace Chooses Groundwork Construction Co. of Miami

We set the standard for garage conversion ADU in Coral Terrace.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Coral Terrace

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Coral Terrace Customers Say

Trusted by homeowners across Coral Terrace and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Coral Terrace?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Coral Terrace.

(833) 968-1198

Request a Free Estimate in Coral Terrace

Tell us about your garage conversion ADU needs. We'll respond within the hour.