A Groundwork company - serving Miami, FL
New Detached ADU in Hialeah, FL | Groundwork Construction Co. of Miami

New Detached ADU in Hialeah - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Hialeah, FL: What It Takes

A new detached ADU in Hialeah, FL is a separate, fully self-contained house on your lot with its own entrance, kitchen, bathroom and utility connections. From signed contract to move-in, plan for 7 to 11 months, and budget $45,000 – $130,000 depending on size, site work and finish level. Call (833) 968-1198 and we’ll walk your lot, check setbacks, and put a real number in writing.

Call (833) 968-1198

How We Build a New Detached ADU in Hialeah, Stage by Stage

Detached means what it sounds like: new slab, new walls, new roof, new meter. Nothing about it piggybacks on the main house except the address. Here’s the order we work in, and where your decisions land.

Stage 1: Site walk and feasibility (week 1)

We measure the lot, find the actual property lines, and check lot coverage and setbacks before anyone draws anything. In Hialeah this is where most projects live or die, because decades of rear and side additions have already eaten the buildable area. You decide the footprint and where the unit sits relative to the main house, the fence line and the driveway.

Stage 2: Design and permitting (weeks 2 through 12, sometimes longer)

Drawings go to the city, and the city comes back with comments. Structural, wind-load and flood-elevation details all get reviewed, and we respond to each round in writing. You decide the exterior finish, roof style and window package here, because those choices show up on the plans. This is the slowest stretch of the job, and it’s the one nobody can shortcut.

Stage 3: Site prep and slab (weeks 1 through 3 of construction)

We clear the footprint, strip the grass, grade for drainage, and set forms. Underground plumbing and electrical conduit go in before the concrete, then the slab is poured and cured. You decide utility routing with us, since the tie-in point to the main service affects both cost and inspection sequence.

Stage 4: Structure, roof, rough-in (weeks 4 through 12)

Block walls or frame go up, the tie-beam and roof structure follow, and then plumbing, electrical and mechanical rough-ins get inspected before anything closes up. Under Miami-Dade wind-borne debris rules, this is when the opening protection and roof-to-wall connections get looked at closely. We schedule inspections so the framer, electrician and plumber don’t stack on top of each other.

Stage 5: Finishes, final inspection, handover (weeks 13 through 20)

Drywall, paint, flooring, cabinets, fixtures and trim. Then the final inspections, a meter, and a walkthrough where we hand you the warranty paperwork and the as-built drawings. You decide countertops, flooring and paint at the front of this stage, not the back, or you’ll stall the crew.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

Most of the budget swings live in a handful of decisions. Here’s how they break down, and what each one costs you in money or upkeep.

  • Footprint and unit size: a 500 – 600 sq ft one-bedroom keeps you near the low end of $45,000 – $130,000. A two-bedroom at 750 – 900 sq ft pushes toward the top, mostly because of foundation, roof area and another bathroom.
  • Wall system: concrete block matches the neighborhood’s mid-century homes and handles humidity well; wood frame is faster and cheaper up front but needs more attention to stucco and paint over time.
  • Roof: a low-slope flat roof with a membrane or a shingle roof from GAF or CertainTeed. Flat roofs read cleaner next to flat-roofed block homes but demand disciplined drainage; pitched shingle roofs shed water faster and are easier to repair.
  • Windows and doors: impact-rated units cost more per opening but cut insurance friction and skip the shutter routine every June.
  • Kitchen and bath finishes: stock cabinets and a prefab shower keep the unit affordable; a tiled walk-in shower and quartz counters add real money and real durability.
  • Utility metering: separate meter means a separate monthly bill for the tenant and a cleaner rental setup. Shared service is cheaper to install and messier to split.

What a New Detached ADU Costs in Hialeah, FL

In Hialeah, a detached ADU runs $45,000 – $130,000, with the bulk of jobs landing in the middle. That range covers design coordination, permits, site work, structure, roof, utilities and finishes. A studio or one-bedroom at 500 sq ft sits at the low end. A two-bedroom with impact windows, a tiled bath and a separate meter sits at the high end.

Five things move the number:

  • Size: every extra 100 sq ft adds foundation, wall, roof and finish cost.
  • Site conditions: tight rear lots that need a crane or hand-digging, or lots where the buildable area is already squeezed by existing additions, cost more to start.
  • Utility runs: the farther the ADU sits from the main service and sewer or septic tie-in, the more trenching and wire you pay for.
  • Finish grade: builder-grade finishes versus tile, quartz and custom cabinetry is a real gap.
  • Permit scope: a clean lot with straightforward setbacks moves faster and cheaper than one where we have to resolve a lot-coverage issue before the city will even accept the application.

Your written estimate is line-item: site work, foundation, structure, roof, MEP, finishes, permits. What it doesn’t include is anything the city asks for after the fact if site conditions change, and we tell you that up front so it isn’t a surprise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Lots and Homes Do to This Job

Hialeah is a dense owner-investor market, and most of the work here is built around homes from the 1950s through the 1970s: single-story concrete block and stucco, flat or low-slope roofs, and a whole lot of converted garages and rear additions built over decades. That history is exactly what makes a detached ADU tricky. Rear and side additions built right up to the property line are common, so setback and lot-coverage issues surface at permitting that were never a problem when the original block home went up. Plenty of the work is also in Spanish, and permitting, inspections and client communication all run that way, which is part of why we operate bilingually here rather than hiring a translator after the fact. In the ZIP codes we work most, 33017, 33014, 33013 and 33016, the sun and humidity chew through stucco and waterproofing fast, so we build to Miami-Dade wind-borne debris and flood elevation rules rather than cutting corners that come back in year three.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Hialeah

Get a Real Number on Your Detached ADU

We’ll walk your Hialeah lot, check setbacks against what’s already built, and put a line-item estimate in writing for a new detached ADU. That’s the free on-site estimate: no vague square-foot pricing, no number that changes after the first truck pulls up. Call (833) 968-1198 to schedule yours. If the wider project includes a full Home Additions & ADU in Hialeah scope, we’ll price that alongside it, and homeowners often pair this with Kitchen Design & Layout in Hialeah or Backsplash, Tile & Flooring in Hialeah for the unit’s finishes. You can also see the broader Home Additions & ADU work we do and the rest of our Hialeah service area.

Written by the team at Groundwork Construction Co. of Miami.

Why Hialeah Chooses Groundwork Construction Co. of Miami

We set the standard for new detached ADU in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(833) 968-1198

Request a Free Estimate in Hialeah

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch