Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterJunior ADU & Interior Conversion in Miami, FL
A junior ADU is a smaller secondary dwelling unit, usually 350 to 650 square feet. In Miami, homeowners build them inside existing footprints, carving space out of an attached garage, a deep back bedroom, or an underused side of a house. Interior conversion is the work of turning that raw space into something legal, rentable, or livable for family: a full bath, a proper kitchenette, a separate entry, and the permitting that makes it count as its own address. If you’ve been quoted a “convert the garage” number that feels like guesswork, we turn it into a real scope with real permits and a fixed price. Call Groundwork Construction Co. of Miami at (833) 968-1198 for a free estimate.
We’re part of the Home Additions & ADU line here at Groundwork, which means this work sits on the same permit, framing, and inspection backbone we use on full additions. Nothing about a junior ADU is small when it comes to code.
Key Takeaways
- Junior ADUs in Miami typically land between 350 and 650 sq ft and run $85,000 to $180,000 depending on whether a bathroom is added from scratch.
- Miami-Dade requires real permits for any secondary dwelling, including garage conversions. Unpermitted ADU work gets flagged at resale and during insurance inspections.
- All our work carries the 730-Day Done Right Promise, and pricing is upfront, no surprises.
- Technicians are background-checked and arrive in uniform on every job.
- Calls reach a live person, 24/7 – no voicemail, no waiting until Monday.
When You Need Junior ADU & Interior Conversion
Homeowners reach out about junior ADUs for a few reasons that show up again and again in Miami’s housing market. If any of these sound like you, it’s worth a conversation.
- You want rental income without buying another property. A junior ADU in the 400 to 600 sq ft range can rent for $1,600 to $2,300 a month in neighborhoods like Little Havana, Coral Way, and Kendall. Converting an unused garage or back bedroom is often the cheapest path to that income.
- You need a home for an aging parent or adult child. Multigenerational living is the norm in Miami’s Cuban, Venezuelan, and Haitian communities, and a junior ADU gives family privacy without a second mortgage. It’s a far better option than a shared bedroom.
- Your garage is a storage unit, not a garage. In Miami we see this constantly: two-car garages in Palmetto Bay and Westchester that haven’t held a car in years. That’s 400+ sq ft of permitted living space going to waste.
- You’ve been told your conversion is “not legal” and need it fixed. Unpermitted garage conversions from prior owners are common across Miami-Dade. We bring them up to code and get them permitted, which protects your ability to sell.
- You’re adding a home office or studio that needs its own entry. Post-2020, plenty of Miami homeowners want a separate workspace with a dedicated door, a half bath, and its own AC zone. That’s a small junior ADU in all but name.
- You have a covered patio or enclosed carport to convert. Miami’s older neighborhoods, especially in Hialeah and Sweetwater, have many enclosed carports that can become a legal junior unit with the right structural and code work.
Our Junior ADU & Interior Conversion Process
Every junior ADU we build follows the same six-step process. It’s built to protect your permit timeline and your budget, in that order.
- Site walk and feasibility check. We assess the existing structure: foundation, ceiling height, electrical service size, plumbing runs, and setback from lot lines. In Miami, this is where we catch the surprise problems early, like a 100-amp panel that can’t carry a full kitchen, or a slab that needs a moisture barrier because of the water table.
- Design and permit drawings. We put together the drawings and pull the permits from Miami-Dade County and the city, including any Miami-Dade Building Code compliance items like wind-borne debris protection for the new entry doors. We handle the paperwork, not you.
- Fixed-price estimate. We deliver an upfront, line-item estimate before a single hammer swings. You see the number, you approve it, that’s the number you pay. No surprise change orders three weeks in.
- Construction. Framing, electrical rough-in, plumbing rough-in, HVAC, insulation, drywall, and finish. Our technicians have up to 12 years of experience, and they arrive in uniform, background-checked, on schedule. For fixtures, we typically spec Delta shower and faucet valves, American Standard toilets, or Toto if you want a bidet seat, with Schluter waterproofing systems in every wet area.
- Inspections and punch list. We coordinate every county inspection: framing, electrical, plumbing, mechanical, and final. You get a walkthrough punch list before the final sign-off.
- Final walkthrough and guarantee handoff. We turn over the permit closeout, warranties on fixtures and materials, and the 730-Day Done Right Promise in writing. Two years of coverage on our workmanship, one of the longest in residential construction.
Want to see how this fits with a larger addition? Read more about our Home Additions & ADU in Miami overall.
Junior ADU & Interior Conversion Pricing in Miami
Here’s the honest range. In Miami-Dade, a junior ADU conversion – meaning you’re reworking an existing structure rather than pouring a new foundation – typically runs $85,000 to $180,000 for a finished, permitted, rentable unit. That range is real for the Miami market in 2026, and it varies because of three factors: whether the space needs a new bathroom, whether the electrical panel must be upgraded, and whether the space meets ceiling height and egress code as it stands.
| Scope item | Typical Miami range |
|---|---|
| Garage or carport conversion (400-500 sq ft), full bath, kitchenette, entry, HVAC | $95,000 – $145,000 |
| Interior bedroom-to-studio conversion with half bath | $65,000 – $95,000 |
| Bathroom addition with Schluter waterproofing, Delta or American Standard fixtures | $14,000 – $26,000 |
| Electrical panel upgrade (100A to 200A) | $2,800 – $5,500 |
| Mini-split HVAC system, one zone | $4,500 – $8,000 |
| Permit fees (Miami-Dade, variable by scope) | $3,000 – $9,000 |
| New entry door with impact glass (Miami-Dade code) | $2,200 – $4,500 |
Three things push that number up or down on any given home:
- Whether the space needs a full wet bath. A half bath adds $9,000 to $14,000 over a space with no plumbing at all, because we’re running new drain and supply lines from the main stack.
- Electrical capacity. If your existing service can’t carry the new load, you’re adding an upgrade. In older Miami neighborhoods like Little Havana and Allapattah, this is common.
- Impact code compliance. Miami-Dade requires impact-rated glass on all exterior doors and windows for a legal dwelling. That’s a fixed cost that can’t be skipped.
Three standing offers make this easier: a free project estimate and design consultation, $1,000 off projects over $10,000, and 0% financing for 18 months. Call (833) 968-1198 and we’ll walk you through the numbers, no high-pressure sales.
Why Use Groundwork for a Junior ADU in Miami?
We’ve been building in Miami since 2014, and we know the code inspectors, the permit bottlenecks, and the specific quirks of building here. A junior ADU is different from an interior remodel in one key way: it has to pass inspection as a legally habitable dwelling, which means egress, ventilation, and impact compliance are non-negotiable. That’s where we focus.
Our brand partners help on the finish side. In the bath, we spec Delta, American Standard, or Toto fixtures. For waterproofing, we use Schluter systems in every shower and wet floor. For durability, we lean on industry-leading brands across every trade, from KraftMaid cabinetry to GAF roofing if the conversion touches the roof. Built to last, backed in writing – that’s not a slogan on our jobs, it’s the literal 730-day guarantee.
FAQs – Junior ADU & Interior Conversion
How much does a junior ADU cost in Miami?
A junior ADU conversion in Miami typically costs $85,000 to $180,000 for a permitted, rentable unit built inside an existing structure – garage, carport, or unused interior space. The range depends on bathroom scope, electrical upgrades, and impact-door code requirements. Call (833) 968-1198 for an exact quote; estimates are free and upfront.
Do I need a permit for an interior conversion or garage-to-ADU in Miami-Dade?
Yes. Miami-Dade County requires a building permit for any secondary dwelling unit, including garage conversions, even when you’re not adding square footage. Unpermitted work surfaces at resale, during appraisals, and when you file an insurance claim. We pull every permit and coordinate every inspection – you don’t touch the paperwork.
Can you come look at my space today?
We schedule site walkthroughs quickly across Miami, often within a day or two of your call, and we answer the phone 24/7. If you’re in Coral Gables, Kendall, Miami Beach, or Doral, call (833) 968-1198 and we’ll get a walkthrough on the calendar. The first estimate and design consultation are free.
Is a junior ADU better than a full addition?
For most Miami homeowners, a junior ADU is the cheaper and faster path to rental income or multigenerational living because it reuses existing walls, slab, and roof. A full addition costs more and takes longer, but it can add more square footage. We’ll tell you honestly which fits your lot and budget after a walkthrough – that straight answer comes before any sales pitch.
What’s the difference between a junior ADU and a regular ADU in Miami?
A junior ADU is smaller (typically under 650 sq ft) and usually an interior conversion of existing space, while a full ADU is a larger, separately structured unit. In Miami-Dade, both require permits, and both count as secondary dwellings. If your lot can support a detached unit, we’ll walk you through that option too; if not, a junior conversion is often the only legal path.
How long does the process take?
Most junior ADU conversions in Miami take 4 to 7 months from signed estimate to final inspection, with permit review eating 6 to 12 weeks of that. The construction phase for a garage conversion usually runs 8 to 14 weeks. We keep the timeline updated in writing so you’re not guessing.
Will the work be done by your own crews?
Every job is staffed by background-checked technicians who arrive in uniform, and our technicians have up to 12 years of experience. We connect your project with vetted, local independent professionals who perform the work under our project management and our 730-Day Done Right Promise.
Do you offer financing?
Yes. We offer 0% financing for 18 months on approved credit, and $1,000 off any project over $10,000. For a junior ADU where cash flow matters, that spreads the cost out without a penalty period trap. Ask us about it when you call.
If you’re ready to see what your garage, back bedroom, or covered patio could become, call Groundwork Construction Co. of Miami at (833) 968-1198 for a free estimate and design consultation. Upfront pricing, no surprises, backed by the 730-Day Done Right Promise. From foundation to finish line, we’ll get your junior ADU permitted, built, and livable.
Written by the team at Groundwork Construction Co. of Miami, serving Miami.