New Detached ADU in Miami, FL | Groundwork Construction Co. of Miami

New Detached ADU in Miami - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Miami Really Costs and How Long It Takes

A new detached ADU in Miami typically runs $106,200 to $259,600 for a full standalone structure, and the build itself takes 6 to 11 months once permits clear Miami-Dade review. That number covers foundation, framing, roof, impact-rated openings, utilities and finishes; what it does not cover is the permitting wait, which in this county can add 3 to 6 months on its own. Call (833) 968-1198 for a free on-site estimate before you commit to a lot position or a plan.

Call (833) 968-1198

How a New Detached ADU Gets Built Here, Stage by Stage

The order of operations for a detached ADU is unforgiving: get it wrong and you rip out concrete. Here’s the sequence we run, and what you’re deciding at each step.

1. Site and wind-load evaluation (2 to 4 weeks)

Before any design work, we walk the lot to confirm setbacks, elevation, flood zone (VE or AE changes everything about how the slab is set), and where the new structure can legally sit relative to the main house. You decide the footprint and orientation here, because moving a detached ADU later means demolishing it. This is also where we confirm the exposure category and wind-design criteria the structure has to meet.

2. Permitting under the High Velocity Hurricane Zone (3 to 6 months)

Miami-Dade runs its own product-approval system, so the plan set has to list specific NOA numbers for the roof assembly, windows, doors, and shutters. Nothing generic passes. You choose the opening schedule and roof type now, because those approvals drive the review timeline. Expect this to be the longest single stretch of the project.

3. Foundation, slab and structural frame (4 to 7 weeks)

Pour, cure, then frame. Concrete block and CBS construction is standard here for good reason: it holds up to salt air and wind pressure far better than wood, and it resists the termite pressure that eats framed structures in this climate. Inspections happen at the slab and at the framing before anything gets closed up.

4. Dry-in, rough-ins and inspections (4 to 6 weeks)

Roof, windows, doors, then electrical, plumbing and mechanical rough-in, each with its own inspection. You decide fixture locations and panel capacity here. This is the stage where a change costs real money, so lock the layout before it starts.

5. Finishes and final inspection (5 to 8 weeks)

Drywall, flooring, trim, paint, and the finish-out. Then the final inspection, the certificate of occupancy, and the walkthrough. A new detached ADU isn’t finished until it passes; we don’t hand over keys before that.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a Detached ADU

Most of the cost swing on a new detached ADU in Miami comes down to a handful of choices you make before framing. The honest trade-offs:

  • Impact glass vs. shutters. Impact-rated windows and doors from a maker with a Miami-Dade NOA carry a higher up-front cost, but you skip the pre-storm installation ritual every June. Accordion or panel shutters cost less initially and protect just as well when deployed, but you or a tenant have to put them up. For a rental ADU, impact glass usually pays for itself in tenant convenience.
  • Tile vs. metal roof. Tile holds up to intense sun and matches most Miami housing stock, but it’s heavier and pricier. Standing-seam metal sheds rain and lasts, at a higher ticket. Either way the assembly needs a NOA number and the underlayment has to handle year-round humidity, because sealants and underlayments degrade fast in this climate.
  • CBS block vs. wood frame. Block costs more and takes longer to lay, but it handles wind pressure and salt air far better, and termites don’t eat concrete. Framed structures are cheaper and faster but need serious termite protection in South Florida.
  • Attached utilities vs. separate meter. Pushing into the main house’s panel and water line is cheaper up front. A separate meter and panel cost more but make the ADU simpler to rent or hand to family.
  • One bedroom vs. two. A second bedroom adds footprint and finish cost but widens who the unit suits, which matters if you plan to rent.

Homeowners often pair a new detached ADU with Kitchen Design & Layout in Miami for the unit’s galley or island, and with Backsplash, Tile & Flooring in Miami to carry the same finishes from the main house into the new structure.

What a New Detached ADU Costs in Miami, FL

The lead range for a new detached ADU in Miami is $53,100 to $153,400 for a compact, modest-finish structure; a full two-bedroom detached ADU with premium impact openings and a tile roof pushes toward $259,600. The low end is a simple footprint with attached utilities and standard finishes; the high end is square footage plus the five variables below.

  • Footprint and bedroom count – more square footage, a second bath, and a second bedroom each add cost.
  • Site conditions – a tight lot, a high water table, or a VE flood zone pushing the slab up all add work.
  • Utility runs – trenching to a separate meter vs. tying into the main house changes the number.
  • Roof and opening grade – impact glass, metal vs. tile, and NOA-approved assemblies raise the ticket.
  • Permit scope – a build inside the High Velocity Hurricane Zone with full structural review costs more in fees and time than a simple remodel.

Your written estimate lists what’s included line by line: slab, framing, roof assembly, openings with their NOA numbers, rough-ins, finishes, inspections, and the 730-Day Done Right Promise on workmanship. What’s typically not included: landscaping, fencing around the new structure, and any upgrade the plan set didn’t carry. The number you see is the number you pay, with no change orders for work we scoped.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Homes Specifically Do to a New Detached ADU

Miami is the only place in the United States with its own product-approval system, so every roof, window, and shutter on a new detached ADU has to carry a Miami-Dade NOA number, not just a Florida or national approval. That single fact changes the entire plan set and the inspection schedule. Older properties add a second layer: the 40-Year Recertification law (25 years near the coast) means the main house often comes under structural and electrical scrutiny during the same period you’re building, so a lot in Coral Gables or along the older corridors can trigger wind-mitigation and concrete-restoration work alongside the new structure. Salt-laden coastal air and year-round humidity punish underlayments and exterior finishes, and hurricane season drives flood-zone elevation rules. We see failures most often in aged roof assemblies and unreinforced older stock, which is why we don’t cut corners on the wind-rated envelope. Groundwork Construction Co. of Miami covers the full job here, and if the scope widens into anything attached to the main house it becomes part of a full Home Additions & ADU in Miami conversation.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Miami

Get a Free Estimate for Your New Detached ADU in Miami

A new detached ADU is a big commitment, and you shouldn’t price it blind. Call (833) 968-1198 to schedule a free on-site estimate anywhere in our Miami service area. On the call we’ll ask about your lot, your intended use, and your timeline, then walk the property and put a line-item number in front of you. No pressure, no vague bids – just a clear scope and an upfront price. See our Home Additions & ADU service for the wider picture, and call when you’re ready to price the job.

Written by the team at Groundwork Construction Co.

Why Miami Chooses Groundwork Construction Co. of Miami

We set the standard for new detached ADU in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 968-1198

Request a Free Estimate in Miami

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch