Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Small & Partial Kitchen Remodels in Miami, FL: What They Cost and How Long They Take
A small or partial kitchen remodel in Miami usually means new cabinets and counters, a backsplash, maybe a new sink and faucet, and leaving the layout where it is – and it runs $10,620 to $23,600 for a true small kitchen, or $16,520 to $53,100 when the scope widens into a partial remodel with new appliances, lighting, and flooring. Most of these jobs finish in four to six weeks of on-site work, not the three to four months a full gut takes. Call (833) 968-1198 and we’ll walk your kitchen with you and put a real number on paper.
The problem isn’t the kitchen. It’s what the salt air has already done behind it.
Here’s the pattern we run into constantly in Miami. A homeowner in Coral Way or Shenandoah decides the kitchen looks tired, calls for new doors and a countertop, and the moment we pull a base cabinet away from the wall the story changes. The cabinet box is fine. The wall behind it isn’t. Salt-laden air off Biscayne Bay has been working on that stretch of drywall and framing for thirty years, and the humidity never really lets anything dry out.
What that looks like in practice:
- Soft cabinet bottoms under the sink from a slow drip the homeowner never saw, because the particleboard was already swollen before the leak started.
- Rusted hinge plates and drawer slides on cabinets that are only fifteen years old. Inland, those same hinges would have another decade in them.
- Mold in the wall cavity behind the backsplash, especially on exterior walls where the afternoon sun hits one side and the AC hits the other.
- Failed caulk and grout at every seam, because the thermal swing between a 95-degree afternoon and a cold kitchen eats sealant faster here than almost anywhere in the country.
That’s why we open a wall before we quote a partial remodel in Miami, and why the quote you get from us includes what we found. If the cabinet run is sound, we keep it and reface. If the substrate behind it is compromised, you’ll know before demo starts, not after the crew has already hauled your old kitchen to the curb.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
How the job actually runs, stage by stage
Stage 1 – Walkthrough and scope lock (day one, two to three hours). We measure the kitchen, photograph the interior of every cabinet, and check the wall behind the sink and range. This is where you decide the biggest question on the whole job: reface the existing boxes or replace them. That single decision changes roughly half the budget. You get a written line-item estimate, not a lump sum.
The coastal failure pattern that drives most Miami kitchen calls
Concrete-block and CBS homes from before 1970 make up a big share of the housing stock in neighborhoods like Little Havana, Allapattah, and Westchester, and they behave differently from wood-frame construction. The block walls don’t move much, but the furring strips and drywall strapped to them trap moisture against the masonry. When the kitchen sink has been dripping for two years, that assembly stays wet long after the leak is fixed, and by the time the cabinet face shows damage the problem has traveled up the wall and into the adjacent room.
We plan for this. Every partial remodel we do in Miami includes a moisture reading at the sink wall, the range wall, and under the dishwasher before anything is ordered. If a reading comes back high, we open the wall, dry it, and treat the framing – and that work is quoted up front rather than discovered mid-job. In the older Mediterranean Revival and MiMo buildings around South Beach and the Roads, the kitchens were often retrofitted into what used to be a service porch or an interior room, which means the plumbing and electrical are in awkward places and cabinet depth is rarely standard. We measure those runs by hand, because a stock cabinet depth won’t fit a 1930s wall.
Newer high-rises along Brickell and Biscayne Boulevard are a different job entirely. The cabinetry is usually sound, the walls are steel stud, and the real complication is the building itself: freight elevator scheduling, working hours, protection of common corridors, and a condo association that needs drawings and a certificate of insurance before anyone touches a cart. We handle that paperwork before the first material order goes in, because a delayed elevator reservation can cost more than the backsplash.
The options you’ll be choosing between
- Reface vs. replace the boxes. Refacing keeps the existing cabinet structure and puts new doors, drawer fronts, and veneer on it. It’s typically the lower-cost path and keeps you out of a full demo, but it only makes sense if the boxes are square, dry, and the layout works. Replacement gives you new interiors, soft-close hardware, and full-depth drawers. If the boxes are swollen or the shelves are sagging, replacement wins.
- Cabinet grade. Plywood boxes with a solid-wood or MDF-core door hold up better against Miami humidity than particleboard. The trade-off is cost: you’ll pay more per linear foot, but you won’t be back in ten years with a soft bottom under the sink. KraftMaid is one of the lines we specify here because the box construction and finish hold up in coastal conditions.
- Countertop material. Quartz is the default for a reason: non-porous, no sealing, and it handles the heat and humidity. Cambria is what we usually show. Natural stone needs periodic sealing and can stain in a busy kitchen. Laminate is the budget option and honestly fine for a rental or a flip, but it won’t hold up in a household that actually cooks.
- Backsplash. Full-height tile to the underside of the upper cabinets looks finished and protects the wall. A four-inch splash is cheaper and quicker. In a Miami kitchen with an exterior wall, the full-height option is worth the extra because it stops moisture from creeping behind the counter seam.
- Flooring under the cabinets. If you’re replacing the floor, do it during the partial remodel rather than after. Luxury vinyl plank handles humidity and spills well and goes down fast. Porcelain tile is more durable and easier to clean but adds time and cost.
- Ventilation. A ducted range hood that exhausts outside matters more in Miami than most homeowners realize. Recirculating hoods just move humid, greasy air around a room that’s already damp. If there’s no duct, running one is often the single best upgrade in a partial kitchen remodel.
See the difference
Before
After
Before
After
Before
AfterWhat Small & Partial Kitchen Remodels cost in Miami, FL
Plan on $16,520 to $53,100 for a partial kitchen remodel in Miami, with most true small-kitchen scopes landing in the $10,620 to $23,600 range. Within that, cabinet installation runs $4,720 to $15,340, countertops $2,360 to $7,670, a backsplash $945 to $2,950, and a kitchen island, if you’re adding one, $3,540 to $11,800.
The variables that push a job toward the top of that range:
- Whether the wall behind the cabinets is sound. Opening, drying, and repairing a wet wall adds cost and a week. Not finding it until after the cabinets are ordered adds more.
- Cabinet count and configuration. A galley with eight boxes is a different job than an L-shape with a peninsula and a pantry. Linear footage is the number that moves this line the most.
- Moving plumbing or electrical. Keeping the sink and range where they are keeps the price down. Relocating a sink drain or adding a circuit for a new range pushes the job up and usually pulls a permit.
- Material grade. Stock cabinets and laminate at one end, semi-custom plywood boxes with quartz and full-height tile at the other. The gap between those two is most of the spread in the range.
- Permit scope. A cosmetic reface may not need one. Anything touching plumbing, electrical, or wall structure does, and the inspection schedule becomes part of the timeline.
Every estimate we write is line-item and fixed. The number you see is the number you pay, and if we find something behind a wall that genuinely wasn’t visible on the walkthrough, we stop and quote it in writing before we proceed. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available if spreading the cost out helps.
What Miami homes specifically do to this job
Miami-Dade County is the only place in the country with its own product-approval system, which means any exterior door, window, or impact product we specify for a kitchen that opens onto a porch or balcony carries a Miami-Dade NOA number – not just a Florida approval. That matters in a partial remodel more than people expect, because the moment you replace a slider or a kitchen window you’re in scope, and the inspector will ask for the NOA. We pull the permit and meet the inspector ourselves.
The other local reality is the recertification calendar. Miami-Dade requires structural and electrical inspection at 40 years, and at 25 years for buildings close to the coast. That deadline drives a wave of work in older buildings, and it’s common for a kitchen remodel in a building approaching recert to uncover electrical that has to be brought current before the kitchen can pass. We check the panel and the kitchen circuits before we order anything, because rewiring mid-job is the single most expensive surprise in this category. If your building is also due for exterior work, homeowners often pair the kitchen with Roof Repair in Miami so the inspections happen in one pass.
We work across Miami – from the pre-1970s block homes in Flagami and Grapeland Heights to the high-rises on Brickell and the MiMo buildings near the Upper East Side – and the older the building, the more often we open a wall and find something worth fixing before it becomes a bigger job.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Small & Partial Kitchen Remodels in Miami
Most partial kitchen remodels in Miami run four to six weeks of on-site work, with a week of ordering and permit time in front of that. A reface with new counters can finish in under three weeks. Call (833) 968-1198 for a timeline based on your actual kitchen.
You need a permit if the work touches plumbing, electrical, or a structural wall, and you don’t need one for a pure cosmetic reface. In Miami-Dade, exterior openings also require product approval under the NOA system, so anything that changes a door or window to the outside is a permitting item. We pull the permits and handle the inspections.
Yes, and that’s the most common way we do it. Keeping the sink, range, and refrigerator in their current positions avoids the two biggest cost drivers and keeps the job inside the lower half of the range. If the layout genuinely doesn’t work, we’ll tell you on the walkthrough rather than after demo.
Between $10,620 and $23,600 for a small kitchen and $16,520 to $53,100 for a wider partial remodel with new appliances and flooring. Call (833) 968-1198 for an exact line-item quote – estimates are free.
Every partial kitchen remodel we do is covered by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right, for two full years after completion.
Get a real number on your Miami kitchen
We’ll walk your kitchen, check the wall behind the cabinets, and hand you a written line-item estimate with a fixed price and a realistic schedule. If you’re also updating a bathroom nearby, homeowners often pair this with Small Bathroom Remodels in Miami to keep one crew and one schedule. When the scope widens past a partial, the wider job is our Kitchen Remodeling in Miami work, and if you’re still deciding which path fits, Kitchen Remodeling is where the full service sits. Call (833) 968-1198 to schedule your free estimate – a live person answers, and we take the call.
Written by the team at Groundwork Construction Co.