Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Pinewood, FL: What It Really Involves
Full kitchen remodeling in Pinewood typically runs $14,000 – $45,000 and takes six to twelve weeks from demolition to final walkthrough, depending on whether plumbing and electrical move. You get a gutted-to-studs kitchen with new cabinets, counters, backsplash, flooring, lighting, and appliances, permitted through Miami-Dade County. Call (833) 968-1198 for a free on-site estimate in the 33167 ZIP and we’ll put the scope and the number in writing before any cabinet comes down.
How a Full Kitchen Remodeling Project Moves, Stage by Stage
Most contractors describe the work as “we handle everything.” That tells you nothing about what happens on your tile floor on a Tuesday morning. Here’s the actual order.
Stage 1 – Protection, demo, and disposal (days 1 – 3). We seal off the kitchen from the rest of the house, pull the old cabinets and counters, strip flooring to the slab, and haul it out. On the concrete-block homes common in Pinewood, this is also where we discover what the walls will and won’t let us do. You decide nothing here; we document what we find and photograph it.
Stage 2 – Rough-in and inspection (days 4 – 10). If plumbing or electrical is moving, this is when it happens: new supply and drain lines, dedicated circuits for the range and microwave, added outlets. Miami-Dade requires rough-in inspection before walls close, and we schedule that inspection as a fixed milestone, not an afterthought. You decide appliance models now, because their cutouts and power needs drive the rough-in.
Stage 3 – Drywall, block patching, and finish prep (days 11 – 17). Cutting into solid CMU walls to move a box or add a vent leaves a patch that has to be furred, taped, and skimmed to blend with 60-year-old plaster or drywall. Mold-resistant board goes up in any wall that shares space with plumbing, which in this climate matters more than most people expect. You pick paint and the exact backsplash layout during this stretch.
Stage 4 – Cabinets, counters, and tile (days 18 – 45). Cabinet boxes go in and get leveled and shimmed; quartz or granite countertops are templated, fabricated, and installed about seven to ten business days later; backsplash typically follows the counter. You approve the template on site before the slab is cut.
Stage 5 – Final fixtures, punch list, and walkthrough (days 46 – 60). Sink, faucet, lighting, and appliances get set, then we walk the room with you and write down anything you want corrected. That punch list gets closed before we call the job done – and everything is covered by the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Pinewood Kitchen
A full remodel forces a dozen decisions in a short window. These are the ones buyers spend the most time on, and the honest trade-offs behind each.
- Cabinet construction. Stock cabinets keep the budget lean but limit sizes to a catalog, which leaves filler strips. Semi-custom lets you fit the odd corner in a 1950s layout cleanly. KraftMaid sits in that middle tier and handles non-standard runs well.
- Countertop material. Quartz is uniform and low-maintenance; granite is durable and forgiving of heat but needs periodic sealing. Cambria quartz holds up to daily use without sealing.
- Flooring over slab. Porcelain tile handles the humidity and slab moisture that make hardwood riskier in South Florida. Luxury vinyl plank is the budget-friendly middle path; solid hardwood needs careful acclimation and a moisture barrier.
- Windows in the kitchen wall. If you’re replacing the old jalousie or awning units while the walls are open, this is the moment. Impact-rated options from PGT or CGI meet Miami-Dade’s windborne-debris product approvals and often earn insurance credits.
- Ventilation and lighting. A properly sized range hood ducted to the exterior matters in a subtropical kitchen; recirculating hoods fight a losing battle against humidity. Recessed LED lighting and under-cabinet strips are the standard package.
- Layout changes. Moving the sink or range raises cost because plumbing and gas lines travel. Keeping them in place and reworking only the cabinets and counters is the budget lever.
What Full Kitchen Remodeling Costs in Pinewood, FL
Expect a full gut remodel in Pinewood to land between $14,000 and $45,000. The spread is wide because the variables below swing hard.
| Line item | Typical range |
|---|---|
| Cabinets | $4,000 – $13,000 |
| Countertops | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island (if added) | $3,000 – $10,000 |
| Full kitchen remodel, all-in | $14,000 – $45,000 |
What pushes a job toward the low end: galley or small U-shaped footprint, cabinets and plumbing staying put, stock or semi-custom cabinets, laminate or LVP floors, and no window replacement. What pushes it high: relocating the sink or range line, removing a wall for an open plan, moving the kitchen’s electrical circuits, custom cabinetry, natural stone counters, and adding an island or pantry.
A written estimate from us spells out demo, disposal, rough-in, inspection fees, cabinet and counter allowances, tile, install labor, and the punch-list walkthrough. What sits outside it by default: appliance packages you purchase separately, structural work if a load-bearing wall comes down, and any surprise found behind the walls after demo, which we price in writing before proceeding so there are no change-order surprises.
Budgeting help is available: 0% financing for 18 months and $1,000 off projects over $10,000. Call (833) 968-1198 for an exact quote – estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Specifically Do to This Job
The homes here shape the scope more than any design wish list. In the 33167 ZIP you’re often working inside a 1950s – 60s concrete-block ranch with a flat or low-slope roof – and that means cutting into solid CMU walls, which is a different trade than cutting drywall. Wiring a new outlet through a block wall takes longer and costs more, so any rough-in plan gets priced against that reality rather than assumed. Jalousie or awning windows are a common find, and if they’re original, swapping to impact-rated units while the walls are open is the practical move. PGT and CGI are the brands we spec most often for the windborne-debris approvals this part of Miami-Dade demands; inland Florida never has to meet the same standard, so quotes from out-of-area contractors can leave that out.
Block construction also has a habit of hiding small surprises: a 1950s kitchen often hides a vent or a line behind cabinetry, and low-lying blocks east of Northwest 22nd Avenue near the Little River sit close enough to the water table that floodplain elevation requirements shape any work that touches the slab. Nine times out of ten a kitchen remodel doesn’t go near the foundation – but if a wall opens to a new addition, storm-water sequencing has to be planned. The June through November hurricane season is the other scheduling constraint: exterior work needs to wrap around storm watches, and we plan summer jobs with a buffer for afternoon downpours. For the wider project scope beyond the kitchen alone, see our Kitchen Remodeling in Pinewood page; homeowners often pair the kitchen with Full Bathroom Remodeling in Pinewood in the same permit cycle.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in Pinewood
Six to twelve weeks is the realistic window, and most Kitchens finish closer to eight. Cabinetry lead times and Miami-Dade rough-in inspections are the two biggest schedule variables. You’ll get a week-by-week timeline in the written estimate, and calls are answered by a live person, 24/7, so scheduling questions don’t sit over a weekend.
Yes, if you’re moving plumbing, electrical, gas, or a wall – and almost every full remodel does at least one. Miami-Dade County issues the permits and inspects the rough-in before walls close. We pull the permits and pass the inspections as part of the project, and the cost is in your written estimate, not added later.
Absolutely, and it’s the most common approach we price. Keeping the sink, range, and walls in place trims a job toward the low end of $14,000 – $45,000 because there’s no rough-in or structural work. You still get new cabinets, counters, backsplash, floors, lighting, and appliances – a full remodel, not a facelift. Call (833) 968-1198 to price both versions.
Most Kitchens in the 33167 area land in the $14,000 – $45,000 range, with the number driven by footprint size, existing wall and wiring condition, whether plumbing moves, material grade, and permit scope. We give a line-item written quote and back the workmanship with our 730-Day Done Right Promise. Estimates are free – call (833) 968-1198.
Every full kitchen remodel is covered by our 730-Day Done Right Promise – if something isn’t right, we make it right, for two full years after we hand you the keys. It’s one of the longest workmanship guarantees in residential construction.
Get a Free On-Site Estimate for Full Kitchen Remodeling in Pinewood
Call (833) 968-1198 and a live person picks up, day or night. We’ll schedule a free on-site walkthrough of your Pinewood kitchen, measure the footprint, talk through layout and material options, and follow up with a written line-item estimate and design consult. No pressure, no vague pricing – just the scope, the schedule, and an honest number. Read more about our kitchen remodeling work, and see the Pinewood area we cover.
Written by the team at Groundwork Construction Co.