FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in Pinewood, FL: Scope, Timeline and What It Costs
Full bathroom remodeling in Pinewood runs $9,000 – $28,000 and takes three to five weeks of working time from demo to final inspection, assuming the layout stays roughly where it is. The work is a complete gut: tile and old drywall out, tub or shower, vanity, toilet, lighting and ventilation replaced, walls closed back up and waterproofed correctly. If you’re planning the whole house at once, this is often the job that anchors it as part of a full Bathroom Remodeling in Pinewood scope. Call (833) 968-1198 to price a full bathroom remodel.
How a Full Bathroom Remodel Moves From Gutted to Finished
We run full bathroom remodels in a fixed sequence so you always know what’s happening next and what you need to decide. Here’s what each stage actually looks like.
Stage 1: Site protection and demolition (days 1 – 3)
We lay protection over the paths and floors before a single tile comes up, then shut off water and power to the room and pull out fixtures, tile, drywall and the old subfloor or tub surround. A typical full bath on 33167’s mid-century block homes takes two to three days depending on how much CMU wall the old tile is bedded to. Day-3 decisions: confirming final fixture locations and confirming whether any hidden rot or water damage gets folded into the written scope.
Stage 2: Rough-in plumbing and electrical (days 3 – 7)
Pipes get re-routed for the new shower valve and drain location, the vanity supply and waste lines get set, and the electrician runs dedicated circuits for the vanity, exhaust fan and any heat lamp. If you’re moving the toilet from one wall to another, this is the stage that decides whether it’s a cheap move in the same joist bay or a saw-cut to the stack. Decisions here: exhaust fan sizing (a real vent to the exterior, not a ceiling recirculator), shower valve brand, and outlet count.
Stage 3: Inspection (days 7 – 10)
Rough plumbing and electrical get inspected before any wall closes up. This is non-negotiable on a full bathroom remodel, and it’s the stage where Pinewood jobs differ from work in most of the state. Building inspectors sign off on the rough-in and the crew waits for the result, usually next business day, before drywall.
Stage 4: Close-up, waterproofing and tile (days 10 – 22)
Walls close up, the shower gets a bonded waterproof membrane (not a vinyl liner behind backer board on a boxed-out curb unless the geometry demands it), and then tile goes on floors, walls and shower. A mortar bed, curing, grouting and sealing sequence is genuinely long, and rushing it is what causes the failures you see two winters later. Decisions here: tile size and pattern, grout color, and where the niche or shelf goes.
Stage 5: Fixtures, glass and punch list (days 22 – 28)
Vanity set, toilet set, shower trim, mirror and lights, then glass enclosure, then a final walkthrough with a punch list in hand. You approve each item before we leave. Then a final inspection. If you’ve been burned by a crew that vanishes at 85% complete, this stage is the whole point.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Decide What Your Bathroom Looks Like in Five Years
- Shower base and enclosure: A tiled shower pan with a linear drain handles curbless, aging-in-place layouts and looks clean, but it costs more and needs a skilled installer. A manufactured pan with a tileable lip is faster and less expensive, but it shows its limits on large format tile. Frameless glass adds to the price but reads as a real upgrade.
- Wall tile vs. full-height panels: Full porcelain to the ceiling is the top of the range and the most durable in a humid Miami bathroom. A 48-inch tile wainscot with painted drywall above costs less and still looks finished. Solid-surface panels (Kohler and similar brands make them) skip grout entirely and hold up beautifully against summer humidity.
- Vanity: A stock vanity cabinet runs cheaper than a custom built-in, but a custom configuration fitting an awkward 33167 alcove is often worth the extra. Comfort-height tops cost $50 – $150 more than standard and are worth it.
- Ventilation: A properly ducted, sized exhaust fan is not optional in South Florida. Undersized fans are the #1 reason bathrooms get mold problems here. We specify the CFM based on room volume and duct to exterior, never to the attic.
- Flooring: Porcelain tile is the default. LVT is cheaper and warmer underfoot but doesn’t hold up to a wet bath long-term. Heated floors are a luxury in South Florida, but they do dry a wet room faster.
- Toilet and fixtures: A standard two-piece toilet is fine. A one-piece skirted model costs more and is easier to clean. Brands like Kohler and similar run the full range; we price both in a written estimate.
What Full Bathroom Remodeling Costs in Pinewood, FL
Full bathroom remodeling in Pinewood typically lands between $9,000 and $28,000, with a typical mid-range job at $15,000 – $20,000. That’s the real number, not a teaser.
Five things move it toward the low or high end:
- Room size: A 5×8 hall bath sits at the bottom of the range; a 10×12 primary bath with a separate tub and shower is at the top.
- Existing condition: Water-damaged subfloor, old galvanized supply lines, or a cast-iron drain in poor shape can add $1,500 – $4,000.
- Plumbing and electrical relocation: Keeping the toilet and shower where they are saves real money. Moving a drain across a joist bay in a slab-on-grade home costs more than moving one over a crawlspace.
- Material grade: Builder-grade porcelain and stock vanity on one end, large-format imported tile and a custom vanity on the other. $4,000 – $7,000 of the spread is here.
- Permit scope: A straight cosmetic remodel with no plumbing move is cheaper to permit than one that relocates a drain and adds a circuit.
What a written estimate includes: demo, disposal, framing and drywall, plumbing and electrical rough-in, waterproofing, tile, fixtures, the shower enclosure, paint, and final inspection. What it typically doesn’t include: structural repair uncovered during demo, an upgrade to a tankless water heater, or moving a load-bearing wall. We quote those separately before you sign, never after.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Specifically Do to This Job
Pinewood sits inside Miami-Dade’s high-velocity hurricane zone, so almost every part of a full bathroom remodel here has a harder code standard than inland Florida ever sees. That means windows you’re replacing during the project must be rated, exterior wall penetrations from new exhaust vents or fan hoods must meet windborne-debris product approval, and any exterior door replacement tied to the project has to meet the same standard. In the low-lying blocks near the Little River, and on older blocks east of Northwest 22nd Avenue, we plan for flood-zone elevation requirements and shallow water tables during foundation or slab work – even in a bathroom, that can affect how a subfloor detail gets built. The mid-century concrete-block single-family homes common across 33167 mean we’re often cutting into solid CMU walls to move a plumbing stack, and a bath that’s been finished and refinished two or three times since the 1950s has surprises hidden behind each layer. We plan for that up front rather than discovering it on day four. Housing stock from this era also means window and door units were installed at a time when wind-uplift ratings weren’t considered, and if those openings are in your scope, they get upgraded to current requirements. Asphalt shingles and flat roofs are both common here, and if the bath sits under a low-slope or aging roof, we recommend homeowners often pair this with Roof Repair in Pinewood or plan a Roof Replacement & Installation in Pinewood before the interior work starts, to avoid leaks after a fresh renovation. Mold-resistant assemblies throughout the bath are standard for us, not an upsell – South Florida humidity is relentless and a bathroom with a cheap build becomes a problem inside two summers. We cover all of Pinewood including the blocks around Northwest 119th Street and the surrounding sidewalks of 33167.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Pinewood
Three to five weeks of working time, with four to six weeks being the more common total once inspections and material lead times are factored in. Permit approval through Miami-Dade adds one to two weeks before the first day of work. Call (833) 968-1198 for a schedule after a walkthrough.
Yes. Any full bathroom remodel that moves plumbing lines, relocates a drain, adds electrical circuits, or opens walls for structural work requires a permit and inspections in Miami-Dade County. The one exception is a cosmetic-only refresh where no rough-in moves. We pull the permit and pass the inspection as part of the job, so it’s covered in the written estimate rather than a surprise line item.
Yes, and this is the most cost-effective path if the layout works. Keeping the toilet, shower and vanity in their current positions saves $1,500 – $3,500 on average and removes an inspection step. If the layout has an awkward alcove or a dated tub you want gone, relocating a drain is worth it, and we price the difference so you’re deciding on real numbers.
$9,000 to $28,000 depending on size, condition and material grade. A mid-range 5×8 hall bath is about $12,000 – $16,000; a primary bath with a tiled shower and a custom vanity runs $20,000 – $28,000. The written estimate is fixed before work starts, with the 730-Day Done Right Promise behind it. Call (833) 968-1198 for a free on-site number.
Every full bathroom remodel we complete is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right, for two full years after walkthrough. Our technicians have up to 12 years of experience, and every project uses verified brand partners so the materials are covered too. The written estimate spells out exactly what’s covered and for how long, before you sign anything.
Get Your Full Bathroom Remodel Priced in Pinewood
Call (833) 968-1198 to schedule a free on-site estimate for full bathroom remodeling in Pinewood. We’ll walk the room with you, talk through layout, materials and timeline, and put a line-item written estimate in your hands with no change orders later. Straight answers, upfront pricing, no surprises. Live person answers, 24/7.