A Groundwork company - serving Miami, FL
Garage Conversion ADU in Pinewood, FL | Groundwork Construction Co. of Miami

Garage Conversion ADU in Pinewood - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Pinewood, FL: What the Job Actually Involves

A garage conversion ADU in Pinewood, FL typically runs $45,000 – $130,000 and takes 8 to 16 weeks from permit to final inspection. You’re turning an existing attached or detached garage into a legal, rentable or family-ready living unit: new slab or floor system where needed, insulated and finished walls, a bathroom, a kitchenette, dedicated electrical, and a separate entrance. Call (833) 968-1198 to schedule a free on-site estimate. We’ll walk your actual garage and tell you what it will take.

Call (833) 968-1198

How a Garage Conversion ADU Comes Together, Stage by Stage

Most Pinewood garages we open up are 1950s – 60s concrete block with a flat or low-slope roof, and the conversion sequence below is built around what that construction actually demands. Here’s what happens, in order, and where you make the calls.

Stage 1: Feasibility and permit drawings (weeks 1 – 3)

Day one is measurement and evaluation, not demolition. We check the existing slab for cracks and moisture, verify ceiling height and egress, and confirm whether the garage sits inside a flood zone that affects finished-floor elevation. You decide here whether you want a full kitchen or a kitchenette, one bedroom or an open studio layout, and whether the garage door opening gets framed and stuccoed or kept as a screened flex space. The drawings and permit package get submitted to Miami-Dade County, and this is usually the longest waiting period of the whole job.

Stage 2: Demolition and structural prep (week 4)

Out comes the garage door and opener, the old storage shelving, and any non-structural partitions. In the 33167 ZIP, that often means cutting into solid CMU block for new doorways and window openings, which takes longer than cutting wood-frame walls and requires proper lintels and reinforcement. If the slab has heaved or the existing footings don’t meet current requirements, we address that now rather than after the drywall goes up. You confirm final room dimensions and door swing directions before framing closes.

Stage 3: Rough-in trades and framing (weeks 5 – 8)

We frame interior walls, run the electrical panel and circuits, rough in plumbing for the bathroom and kitchenette, and install HVAC ducting or a mini-split line. Inspections happen in sequence here: framing, then electrical/plumbing/mechanical rough-in, then insulation. This is where hidden costs live, and it’s where an honest estimate separates from a lowball one. Relocating a drain line or upgrading a service panel adds real money and real days. You’ll pick fixture locations and confirm the layout before the walls close.

Stage 4: Insulation, drywall, and finishes (weeks 9 – 12)

The enclosure gets insulated and sealed tight, then drywall, then finish trades: flooring, tile, trim, paint, fixtures, and the kitchenette cabinets and counter. Because Pinewood is subtropical, we spec mold-resistant drywall and build the wall assemblies to manage humidity inside a conditioned space; that’s not optional here, it’s how the unit survives a decade of summer. You finalize paint colors, flooring material, and cabinet style in this window.

Stage 5: Final inspections and handover (weeks 13 – 16)

Final building, electrical, plumbing, and mechanical inspections all get signed off, then we do a full walkthrough with you. You receive the warranty documentation, the permitted-as-built drawings, and a punch list closeout. Throughout every one of these stages, the work is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right, in writing.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Define Your Garage Conversion ADU

Half the cost of a garage conversion ADU is decided in a few specification meetings. Here’s what you’ll be choosing between and the honest trade-offs of each.

  • Slab vs. raised floor: If the existing slab is sound and dry, finishing on it is the least expensive path. If it’s cracked or the water table is high, a raised and insulated floor system adds cost but keeps the floor dry and warm. Your site inspection tells you which applies.
  • Kitchenette vs. full kitchen: A compact kitchenette with a sink, two-burner cooktop, and under-counter fridge fits tighter space. A full kitchen with range and dishwasher costs more and needs more electrical capacity. Renters and in-laws typically prefer the full kitchen.
  • Bathroom configuration: A walk-in shower uses less floor space than a tub and suits a compact ADU; a tub costs more but rents differently in some markets. For a compact ADU we usually recommend a shower.
  • HVAC approach: A dedicated mini-split gives independent temperature control and a separate electric meter, which matters if you plan to rent. Extending the main house system is cheaper upfront but ties the ADU’s comfort to the main house.
  • Windows and doors: In this high-velocity hurricane zone, openings have to meet windborne-debris and product-approval requirements. We commonly specify impact-rated products from PGT or CGI so you meet code without adding storm shutters. A standard-impact retrofit costs more upfront but closes an inspection faster than a non-rated opening that needs separate protection.

What Garage Conversion ADU Costs in Pinewood, FL

Most garage conversions in Pinewood land between $45,000 and $130,000. The low end of that range is a straightforward studio conversion with the existing slab reused, a shower bath, a kitchenette, and a mini-split. The high end means a full one-bedroom layout, a new raised floor, a full kitchen with upgraded cabinetry, relocated plumbing, a new electric service, and finishes chosen for durability. Five variables drive the number: garage size and ceiling height, the condition of the slab and roof, whether plumbing and electrical have to move or upgrade, the grade of finishes (flooring, tile, cabinets), and permit scope including any flood-zone elevation work. Every written estimate is line-item and fixed: the number you see is the number you pay, and we don’t issue change orders for items that were already in scope.

The estimate covers drawings and permit submission, demolition, framing, rough-in trades, insulation, drywall, finish materials we supply, fixtures, and final inspections. It typically does not cover landscape repair, a separate utility meter installation, or the cost of any structural repair we discover only after opening a wall or slab – we flag those before proceeding, never after. Pairing the conversion with new kitchen surfaces is common; many Pinewood homeowners add Cabinets & Countertops in Pinewood for the ADU kitchenette at the same time.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Pinewood Homes Specifically Do to This Job

Pinewood sits in Miami-Dade’s high-velocity hurricane zone, so nearly every part of a garage conversion here has to meet windborne-debris and product-approval standards under the Florida Building Code that inland Florida homes never face. That adds specific inspection checkpoints, rated openings, and sometimes a retrofit of the garage’s own roof for wind uplift – all before the ADU is even habitable. Because the 33167 ZIP includes low-lying blocks near the Little River, especially the streets east of Northwest 22nd Avenue, we also plan around flood-zone elevation and storm-water rules that add real cost and sequencing. Concrete-block construction from the 1950s – 60s is the norm in the surrounding blocks near Westview and Gladeview, which means we’re cutting CMU walls and retrofitting old flat or low-slope roofs rather than opening wood framing. The subtropical climate adds one more requirement: mold-resistant assemblies and HVAC sized for a hot, humid summer. All of this is why we treat a Pinewood conversion as a permitting-and-sequencing job as much as a build. We cover Pinewood and the surrounding area through our Pinewood service page; when the conversion grows into a larger scoped project, it’s part of a full Home Additions & ADU in Pinewood.

Serving Pinewood, FL – Our Local Coverage Area

We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Pinewood

Schedule Your Free Garage Conversion ADU Estimate in Pinewood

We’ll come to your garage, measure it, check the slab and roof, and tell you what a conversion will realistically cost and how long it will take. The estimate is free and line-item. Our broader Home Additions & ADU work is handled by the same team, so you’re never handed off between contractors. Call (833) 968-1198 to book your visit. A live person answers, any hour.

Written by the team at Groundwork Construction Co.

Why Pinewood Chooses Groundwork Construction Co. of Miami

We set the standard for garage conversion ADU in Pinewood.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Pinewood

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pinewood Customers Say

Trusted by homeowners across Pinewood and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Pinewood?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Pinewood.

(833) 968-1198

Request a Free Estimate in Pinewood

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch