Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in South Miami, FL: What It Costs and How Long It Takes
Turning an existing tub alcove into a walk-in shower runs $4,130 to $11,800 in South Miami, and most conversions are finished in 7 to 12 working days. The job is a swap inside the same footprint: pull the tub, rework the drain, prep the walls and pan, then set tile and glass. If the plumbing stays put, you’re on the low end of that range. Call (833) 968-1198 for a free on-site estimate.
Here’s what actually decides where your number lands: whether we’re keeping the drain where it is, how far the existing wall tile has to come out, and how heavy you go on glass and fixtures. A ranch cottage off Sunset Drive with a 1950s cast iron tub is a very different day of work than a reworked lot near the University of Miami campus where someone wants a curbless pan and a frameless enclosure. We quote both from the same playbook, but the crew time and the material grade don’t match.
It’s worth saying plainly: this is not a weekend project you’ll knock out in one trip. Done right, a conversion is a permitted, inspected job – and that’s exactly why we lead with it rather than the shortcut version.
How We Do a Tub-to-Shower Conversion, Stage by Stage
Every conversion follows the same sequence. The dates shift with material lead times, but the order doesn’t. Here’s what your calendar actually looks like.
Stage 1: Demolition (Days 1 – 2)
We protect the floors and surrounding walls, then cut out the tub and the tile around it. Under a 1960s tub we regularly find surprises: rusted overflow drains, a rotted subfloor corner from a slow leak two decades old, or two layers of tile set over old drywall. That’s the first homeowner decision point – if the framing behind the wall is soft, we show you before we replace it. You approve the add before we touch it.
Stage 2: Rough Plumbing and Framing (Days 2 – 4)
We change the drain from the tub’s center location to a shower drain, adjust the valve body to shower height, and block the walls where the grab bars and glass will land. If you’re going curbless, this is when the floor gets recessed or ramped. Homeowners pick the drain type here – a linear drain in the center, or a point drain at one end. This is also the stage where a permit inspection usually happens, depending on what the city review requires.
Stage 3: Waterproofing and Pan Build (Days 4 – 6)
This is the stage nobody sees and everybody pays for later when it’s skipped. We build the sloped mortar bed, seat the waterproof membrane, band the seams, and flood-test the pan. In South Florida’s humidity a properly cured pan matters more than most homeowners realize, because trapped moisture behind tile is where long-term mold problems start. You don’t choose anything here – you just want to know it’s being done.
Stage 4: Tile and Wall Finish (Days 6 – 10)
Wall tile, floor tile, grout, and caulk at the changes of plane. This is where the visual decisions land: large-format porcelain versus classic subway, a marble-look porcelain versus the real stone, floor-to-ceiling versus a wainscot height. We set the tile, align the pattern, and let it cure before any glass goes near it.
Stage 5: Glass, Fixtures, and Final Walkthrough (Days 10 – 12)
Shower glass installs only after the framing is true and the tile is fully set. We hang the door, seat the shower head and trim, install the grab bars, and run water through everything. Then we walk the finished shower with you, point out where the weep holes are and how to keep the drain clear, and hand over the workmanship guarantee. That’s a job covered under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make Along the Way
Most of the material decisions in a conversion come down to a handful of forks. Each one moves the price and each one carries an honest trade-off.
- Acrylic versus tiled shower. A prefab acrylic pan and wall kit installs faster and cleans easily – it lands closer to the $4,130 end of the range and suits a rental or a quick flip. A tiled shower with a custom pan runs higher but is what buyers in South Miami expect on a reworked lot, and it lasts decades longer with proper waterproofing.
- Curb versus curbless entry. A curbed pan is the standard build and the lower-cost path. A curbless entry looks cleaner, ages better for anyone who’ll need accessibility, and costs more because the floor has to be recessed and waterproofed around the slope. Look at your subfloor framing before you commit – not every small-lot home here has the depth for it.
- Drain type. A point drain at one end is the simpler build. A linear drain along the wall costs more but lets you use a single large-format floor tile with minimal cuts and slopes the floor in one direction.
- Wall material. Large-format porcelain is durable and reads premium. Subway tile is timeless and cheaper to install. Marble-look porcelain gives you the stone look without the sealing or the staining risk in a wet environment.
- Glass and enclosure. Frameless glass is the top of the range and the cleanest look. A semi-frameless or framed enclosure brings the number down. We measure glass after tile is set, never before.
- Fixtures. A pressure-balanced valve is the standard shower valve and what we’d spec on most jobs. A thermostatic valve adds control and cost. Grab bars, a bench, or a niche are small line items that add real long-term value and belong in the plan, not bolted on later.
Name-brand fixtures hold up better than the bargain-bin versions – we lean on quality lines from suppliers we’ve worked with for years – but the honest truth is the waterproofing behind the tile matters more than the brand stamped on the valve. Get the pan and membrane right and the fixtures have a fair chance.
What Tub-to-Shower Conversion Costs in South Miami, FL
A tub-to-shower conversion in South Miami typically runs $4,130 to $11,800, all-in. That covers demo, rough plumbing, waterproofing, tile, glass, and fixtures on a standard alcove replacement. Here’s how the range breaks down:
| Scope | Typical range |
|---|---|
| Basic acrylic pan and wall kit, standard valve, framed glass | $4,130 – $6,500 |
| Tiled shower, curb pan, point drain, sem-frameless glass | $6,200 – $8,900 |
| Curbless tiled shower, linear drain, frameless glass, premium fixtures | $8,900 – $11,800 |
| Add for relocating the drain or relocating the valve wall | +$900 – $2,400 |
| Add for hidden rot, subfloor, or framing repair | +$600 – $3,000 |
What moves the number:
- Footprint and shower size. A standard 60-inch alcove is the base. Widening the shower or converting to a neo-angle adds framing and glass cost.
- Existing condition. A rusted-out drain, a soft subfloor corner, or old cast iron plumbing discovered at demo is the single biggest swing. We don’t know until the wall opens.
- Plumbing relocation. Keeping the drain and valve where they are saves real money. Moving the drain or shifting the valve to a different wall adds labor, materials, and a rough-in inspection.
- Material grade. Porcelain versus natural stone tile, standard versus high-end fixtures, acrylic versus glass enclosure – each step up adds.
- Permit scope. South Miami reviews plumbing and electrical work at the city level, so a job that involves relocation or new electrical pulls a bigger permit than a straight fixture swap.
What’s included versus not: Our written line-item estimate covers demo, rough plumbing, waterproofing, tile, standard fixtures, glass, cleanup, and permit fees for the conversion footprint. What it typically won’t cover unless we spec it explicitly: moving the shower to a completely different location in the room, a full bathroom remodel beyond the conversion, or structural repair behind the wall discovered at demo. We show you those as change orders before we touch them – the number you see is the number you pay.
The nicer the shower, the more the materials sketch it out of reach. That’s where 0% financing for 18 months and $1,000 off projects over $10,000 come in – the conversion budget moves closer to what fits.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami Homes Specifically Do to This Job
The conversions we do here almost always involve a home built between the 1940s and 1960s – a concrete-block or CBS house with terrazzo or tile floors and a small footprint. That matters for a shower conversion in ways it doesn’t in other markets. Older cast iron drain lines, single-layer tile over block, and shallow framing behind the shower wall are the norm, and we plan for the odds of finding rot at the pan.
South Miami runs its own building department, so the conversion is reviewed at the city level rather than by Miami-Dade County. That means a plan review, a rough-in plumbing inspection, and a final inspection on the city’s schedule – not the county’s. And because the city’s tree protection code covers that protected live oak canopy, work near a mature tree on a tight lot sometimes needs a tree survey and root-protection plan before we can even stage materials in the driveway. It’s a detail most contractors from outside the city learn the hard way. The flip side of the tight collision of cottages and larger infill homes is that permits and inspections here are granular and specific to a small city of roughly 12,000, so we build our schedule around it.
Coral Gables and unincorporated county jobs are governed differently, which is why our crews get used to reading the South Miami rules closely on every job. The houses off Sunset Drive and around the University of Miami corridor are the ones we see most often, and they share the same failure modes: rusted drains, soft subfloor corners, and decades-old valves that couldn’t keep up with city water pressure.
Homeowners here tend to want it done in one clean run, not a patch-job that comes back in two years – which fits the way we work. This tub-to-shower conversion is one piece of the larger scope covered on our Bathroom Remodeling in South Miami page, and the full service lives at our Bathroom Remodeling hub. If you’re working out how far the project reaches, the shower is usually step one.
One more local note on the rest of the house: we regularly see the same mid-century roofs that need attention around conversion time, so homeowners often pair this with Metal Roofing in South Miami or Tile Roofing in South Miami rather than making two separate calls. Our crews cover South Miami and the surrounding neighborhoods.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in South Miami
Most conversions run 7 to 12 working days from demo to final glass. Straight fixture swaps and acrylic kits land on the faster side; curbless tiled showers with custom glass hit the longer end. City permit scheduling for the rough-in and final inspections adds a few days. Call (833) 968-1198 for a timeline based on your actual bathroom.
Yes, generally. The conversion involves a plumbing change from a tub drain to a shower drain, and South Miami reviews that at the city level, so it pulls a permit and gets inspected. Skipping it can bite you at resale or if the shower leaks later. We pull the permit and pass the inspection as part of the job.
Often, yes, and it keeps the cost near the low end of the $4,130 to $11,800 range. If the existing drain and valve wall stay where they are, the rough plumbing work drops significantly. Moving the drain or the valve to a different wall adds $900 to $2,400 and a bigger permit scope. Call (833) 968-1198 and we’ll tell you what your current setup allows.
Expect $4,130 to $11,800, with the standard tiled version landing around $6,200 to $8,900. The number is set by shower size, existing condition at demo, plumbing relocation, material grade, and permit scope. A written line-item estimate from a free on-site visit gives you the exact figure – call (833) 968-1198.
Every conversion we do is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s a two-year workmanship guarantee, one of the longest in the residential construction space. Backed in writing, from the waterproofing to the glass install.
Ready for a Tub-to-Shower Conversion in South Miami?
Call (833) 968-1198 to schedule a free on-site estimate for your tub-to-shower conversion in South Miami. We’ll look at your existing bathroom, talk through the drain and material options, and hand you a written line-item estimate with an upfront price and no surprises. A live person answers around the clock, so you won’t be sent to voicemail. Financing and current offers are covered on the call.
Written by the team at Groundwork Construction Co.