FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What does a tub-to-shower conversion in Coral Gables cost, and how long does it take?
Most Coral Gables tub-to-shower conversions we build run $3,500 to $10,000 and take five to ten working days once materials are on site. The job means pulling the tub, re-doing the waterproofing and drain connection, tiling a walk-in shower pan, and setting a new valve and trim. Call us at (833) 968-1198 and a live person picks up, day or night, to set your free on-site estimate.
How a Coral Gables Tub-to-Shower Conversion actually runs, day by day
We’ve learned the calendar is the part homeowners worry about most, so here’s the honest sequence. Timelines assume the plumbing stays where it is; if we’re moving the drain, add two to four days.
Day 1: demolition, protection, and the first inspection
We lay floor protection down the hallway and into the bathroom before anything comes out. The tub, surround, and existing valve trim go out in the morning, and the wall cavity gets opened up enough to see what the tub was hiding. On a lot of the older Coral Gables homes, that’s where we find a surprise: a rotted stud behind a slow leak, or 1950s galvanized supply lines that have lived past their useful life. You decide right here whether to replace the valve while the wall is open. Nothing gets covered again until that call is made. Taking a valve and drain apart is not a homeowner project, and the drain in particular can flood a floor in seconds if it’s mishandled. That’s trained-trade work.
Days 2 – 3: rough-in, framing, and waterproofing
New shower valve, new drain, new blocking for the grab bar you’ll want later. Then we waterproof. We use Schluter Kerdi in most of our showers because the bonded membrane goes directly over cement board and the seams get banded, which matters in a South Florida house that sees daily humidity. This stage takes the longest and is the one you should never let anyone rush. You’ll confirm the valve finish and the grab-bar placement before we close the wall. If the project requires a permit, our rough-in inspection happens here, and a failed inspection at this point costs days, not hours.
Days 4 – 6: tile, pan, and grout
The shower pan gets set to slope, tile goes up the walls, the curb gets wrapped, and we move to grout. You pick the tile at the start, not mid-job: a 12×24 porcelain looks clean and is easy to keep, a honed marble or a terracotta-look ceramic reads more Coral Gables, and a mosaic floor adds grip. Tile choice affects the schedule because specialty and large-format material needs more cutting and layout time. Grout and caulk get 24 hours before water touches them.
Days 7 – 8: glass, trim, and fixtures
The shower glass, the valve trim, the handheld, and any niche shelves get installed. Glass lead time is the number one slippage in this job, so we order it on day 2 or 3, not day 6. This is the point where we check that the slope drains correctly and nothing weeps under the door. If you’re picking a Delta or American Standard valve, the trim is a stock item and typically arrives fast; specialty finishes take longer.
Days 9 – 10: punch, cleanup, and walkthrough
We run the shower, check for leaks at the drain and the valve, re-caulk, and touch up. Then we walk the job with you, note anything that isn’t right, and correct it the same week. Final payment isn’t the end of the relationship – the work is covered by our 730-Day Done Right Promise, so if something fails a year in, we come back.
The choices you’ll actually make on a Tub-to-Shower Conversion
This is where your budget lives. Here’s what we usually put in front of a homeowner and the honest trade-off of each.
- Shower pan: tiled vs. prefab acrylic. A tiled pan with a Schluter membrane runs $900 to $1,800 more and lets you match the walls, but it needs a skilled hand and it will show every grout line. A one-piece acrylic pan (American Standard and Kohler both make solid ones) saves money and cleans easily but looks like what it is.
- Tile grade: porcelain vs. natural stone. Porcelain holds up in a humid shower and won’t need sealing. Marble, travertine, and terracotta-look ceramics suit Coral Gables’ Mediterranean Revival homes but need re-sealing every year or two and stain more.
- Valve and trim: builder-grade vs. thermostatic. A Delta or American Standard pressure-balance valve keeps the price down and works fine. A thermostatic valve with a separate volume control adds $400 to $900 but stops the cold-water shock when someone flushes a toilet.
- Glass: framed vs. frameless. A framed slider or pivot is the budget pick. Frameless 3/8-inch glass costs more and shows water spots more, but it opens the room up and is the look most homeowners ask for.
- Accessibility: grab bars and a low curb vs. curbless. A curbless entry needs the slab recessed or a ramp built in, which adds cost and sometimes a structural question. A low 4-inch curb with blocking for a future grab bar is the practical compromise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What a Tub-to-Shower Conversion costs in Coral Gables, FL
The honest range is $3,500 to $10,000. A basic acrylic surround with a stock valve lands at the bottom. A tiled walk-in with a Schluter pan, frameless glass, and a thermostatic valve lands near the top. Here’s what pushes you up or down:
- Size. A 30×60 alcove is the cheapest footprint to convert; a 36×60 or larger shower needs more tile, more glass, and sometimes a moved fixture.
- Existing condition. A straight swap is one number. Hidden rot, a bad joist, or failing galvanized lines add days and dollars.
- Plumbing and electrical moves. Keeping the drain where it is saves real money. Moving it, or adding a niche light, adds cost and permit scope.
- Material grade. Tile, glass, and valve grade are the biggest single swing in any quote.
- Permit scope. A valve or drain move triggers an inspection; a straight cosmetic swap may not need one. We pull permits and pass inspections where they’re required, and we tell you upfront which applies.
Your written estimate is line-itemed: demo, rough-in, waterproofing, tile, glass, fixtures, permit fees if any, and cleanup. What’s typically excluded: hidden structural or plumbing repairs found behind the wall, specialty glass with a long lead time, and any tile upgrade made after the order. Upfront pricing, no surprises – the number you see is the number you pay, and the plan is backed by our 730-Day Done Right Promise. 0% financing for 18 months is available, plus $1,000 off projects over $10,000.
See the difference
Before
After
Before
After
Before
AfterWhy Coral Gables makes this job different from Miami or South Miami
Coral Gables is one of the most architecturally regulated cities in the country. The Board of Architects reviews exterior changes and even paint colors under the city’s Mediterranean Revival design code, and the Historic Preservation Board gets involved on designated homes. Practically, that means a contractor here plans for design-review approval cycles that don’t exist in neighboring Miami or South Miami. Interior bathroom work usually skips Board review, but if your project touches anything visible from the street, a window, or the exterior envelope, the calendar changes and so does the plan. Our technicians have up to 12 years of experience and we build that review time into the schedule, not as a surprise.
The housing stock matters too. The city is dominated by 1920s Mediterranean Revival villas, Mission-style homes, and coral rock (oolitic limestone) construction from George Merrick’s original planned community. That means bathroom work here routinely means masonry walls and historic-sensitive repairs, not generic wood-frame building. We see spring failures and cracked tile in homes that sat vacant through wet seasons, and we see drain lines that a 1958 remodel left undersized. The subtropical climate, hurricane season (June to November), and the Florida Building Code’s high-velocity hurricane zone requirements shape everything we order. Homeowners in Coral Gables often pair a bathroom project with Metal Roofing in Coral Gables or Tile Roofing in Coral Gables when they’re planning a larger exterior refresh, since the same storm-hardening logic applies. If the scope turns into a full re-do, our Bathroom Remodeling in Coral Gables page covers the wider project. For service elsewhere in the area, see our Coral Gables service-area page, or look at our Bathroom Remodeling service overview.
One more local detail worth naming: the city’s lone 33114 ZIP sits under that same design-review regime, and we’ve seen projects stall simply because a crew didn’t know the submittal process. Knowing it wins jobs that out-of-town crews lose to delays.
Serving Coral Gables, FL – Our Local Coverage Area
We serve Coral Gables and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Tub-to-Shower Conversion in Coral Gables
Five to ten working days once materials are on site, with the demolition-and-waterproofing stages taking the longest. If the drain or valve moves, add two to four days, and if a permit or design review applies, add the review window. Call (833) 968-1198 for a schedule that fits your actual project.
It depends on the scope. A straight cosmetic swap with no plumbing or electrical change often doesn’t require one; moving a drain, changing a valve, or adding wiring does. We pull permits and pass inspections where required and tell you upfront which applies. Call (833) 968-1198 and we’ll walk through it.
Yes, and that’s the most common way we do it. Keeping the drain and supply lines in place holds the price near the low end and keeps the schedule tight. Moving them is possible but adds cost and permit scope. Call (833) 968-1198 and we’ll tell you which path your bathroom is on.
Most jobs land between $3,500 and $10,000, with the range set by shower size, tile and glass grade, valve choice, and whether plumbing or structure moves. We give a written line-itemed estimate before any work starts. Call (833) 968-1198 – estimates are free.
Every job is backed by our 730-Day Done Right Promise – if it isn’t done right, we make it right. That covers workmanship, and manufacturer coverage applies to fixtures and glass. Call (833) 968-1198 to schedule your free on-site estimate.
Get a free Tub-to-Shower Conversion estimate in Coral Gables
Book a free on-site estimate and a design consult. We’ll measure the bathroom, look at the plumbing behind the tub, and give you a written line-itemed quote with the permit situation spelled out. Calls are answered by a live person 24/7, and every technician arrives background-checked and in uniform. Call (833) 968-1198 to schedule yours.
Written by the team at Groundwork Construction Co.