Garage Conversion ADU in South Miami: What It Costs and How Long It Takes
A Garage Conversion ADU in South Miami usually runs $53,100 to $153,400 and takes four to seven months from demo to final inspection. You’re turning an existing garage into a legal, separate living unit: new framing and insulation, plumbing for a kitchenette and bath, electrical, a door and window package built for wind code, and city sign-off. Call (833) 968-1198 and we’ll walk your garage and lot before you commit to anything.
How We Build It, Start to Finish
Every garage conversion we build in South Miami moves through the same five stages. The durations below are typical; your lot and your garage’s condition set the real clock.
Stage 1 – Walk-through and design (weeks 1-3). We measure the garage, check the slab, and map where the drain lines can actually go. You decide the layout: studio versus one bedroom, kitchenette size, bath placement. This is also when a tree survey and root-protection review happen if a live oak sits near the work, because that can move your entire plan before the first permit is filed.
Stage 2 – Permits and engineering (weeks 3-8). South Miami runs its own building department, so the review is more granular than what you’d see in unincorporated county territory. Plans get stamped, wind-load calculations get submitted, and we schedule inspections. You don’t have to stand in line – we pull the permits and pass the inspections, and you’ll know the status at every checkpoint.
Stage 3 – Demo and structural prep (week 9). The old garage door opening gets framed and closed. We cut the slab for plumbing if the bath isn’t landing near an existing line. On older block garages we often find hairline cracks or a slab that’s settled, so we repair and reinforce before anything gets covered up.
Stage 4 – MEP rough-in and dry-in (weeks 10-14). Electrical, plumbing, and HVAC go in, then rough inspection. After that comes insulation, drywall, and the exterior door and window package. This is the stretch where South Florida weather matters: we stage dry-in around afternoon storms so framing and unfinished drywall don’t sit soaked. You’ll pick fixtures and finishes around this point – that’s the decision deadline that keeps the schedule honest.
Stage 5 – Finishes and final inspection (weeks 15-24). Flooring, cabinets, countertops, paint, trim, and the final walkthrough with the city inspector. Any punch items get closed out before we hand you the keys. Then the 730-Day Done Right Promise covers the workmanship from day one.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the budget swings here, not in the framing. Here’s what you’re deciding between and the honest trade-off of each.
- Bath fixtures and layout. A compact shower-and-vanity bath keeps plumbing near an existing line and cuts cost. Moving a drain across the slab adds excavation, concrete repair, and inspection time. Delta and American Standard fixtures hold up well for a rental or in-law suite and don’t break the budget; upgrading to a larger walk-in shower means trenching and a bigger tile package.
- Kitchenette versus full kitchen. A kitchenette with a sink, cooktop, and under-counter fridge is cheaper and simpler to permit. A full kitchen with a range and venting adds electrical load and ductwork, but rents for more.
- Flooring. Luxury vinyl plank over the existing slab is the practical pick for humidity and quick installation. Tile costs more in labor but handles wet areas better. Expect to spend on floor prep if the slab has settled or cracked.
- Door and window package. The garage door opening has to become a wall with an entry door, and every new opening needs impact protection in South Miami. Impact-rated units cost more up front and skip the shutter hassle. This is where a Toto or Schluter upgrade is worth the money – tile shower systems with proper waterproofing (Schluter’s membrane is the one we trust) are the difference between a bathroom that lasts and one that grows mold behind the tile.
- Insulation and HVAC. A mini-split is the usual answer for a single-room conversion and cheaper to run than extending the house system. Spray foam costs more than batt insulation but seals the block walls better in this climate.
What a Garage Conversion ADU Costs in South Miami, FL
The lead range is $53,100 to $153,400. A straightforward studio conversion with a kitchenette and compact bath lands near the bottom. A full one-bedroom with a real kitchen, premium finishes, and any structural surprises pushes toward the top.
Five things move that number:
- Garage size and ceiling height. A two-car garage with 9-foot ceilings converts cleanly. A low-slung 1960s carport needs framing work.
- Plumbing location. Keeping the bath within a few feet of an existing drain line saves thousands. Cutting a new trench across the slab adds concrete, labor, and inspection.
- Existing condition. Cracked slabs, termite damage, or a roof that needs rebuild to current wind code add scope.
- Finish grade. Cabinet and countertop quality, fixture brand, and tile versus LVP account for a wide spread.
- Permit scope. Adding a second utility meter, or complying with the tree ordinance if excavation is involved nearby, adds review time and cost.
Your written estimate is line-item and fixed: the number you see is the number you pay, with no change orders for scope we already priced. What it typically excludes: impact windows beyond the standard package, major structural repairs discovered after demo, and any work tied to a full addition – that’s covered separately under our Home Additions & ADU in South Miami scope.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami Homes Do to This Job
South Miami is a small city of roughly 12,000 with its own building department, tree protection code, and design standards, so your conversion is reviewed locally rather than by Miami-Dade County – that means a more granular process than you’d get in neighboring Coral Gables or unincorporated territory. The mature live oaks are the wildcard. Before any excavation near the footprint, we run a tree survey and root-protection review, and arborist sign-off can reshape where the garage work, drainage, or a new driveway lands. The housing stock is mostly 1940s to 1960s concrete-block and CBS homes with terrazzo or tile floors and small footprints, often on modest lots being reworked into larger two-story houses. Those block garages regularly need structural reinforcement and a roof rebuilt to current wind code, and the flat, low-lying terrain and high water table complicate drainage and grading on tight infill lots. It’s the kind of work where the details on your specific block matter more than any general rule.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in South Miami
Four to seven months is the realistic window, with permitting eating three to eight weeks of it. South Miami’s local review is thorough, so a clean set of plans is what keeps the schedule tight. Call (833) 968-1198 for a timeline based on your garage.
Yes. South Miami’s building department requires permits for the structural, plumbing, electrical, and mechanical work, plus a final inspection before the unit is legal to live in. We pull the permits and pass the inspections; that’s part of every job we quote.
Often, yes. If the bath can sit near an existing drain line and the garage walls are sound, we skip most of the heavy excavation and framing. On older block garages we check the slab and framing first, because a settled slab or cracked wall changes the answer.
The range is $53,100 to $153,400, and the low end is a studio with a kitchenette while the high end is a full one-bedroom with premium finishes. Call (833) 968-1198 for an exact quote – estimates are free and we put the number in writing.
Every project is backed by the 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship for two full years, and combined with impact-rated materials and proper waterproofing, it’s built to last and backed in writing.
Ready to Price Your Garage Conversion ADU in South Miami?
Call (833) 968-1198 for a free on-site estimate and design consult. We’ll walk the garage, check the slab and drain lines, and talk through what your lot allows before you commit to a number. You’ll get an upfront price with a line-item breakdown, and a live person answers the phone any hour. If your plans grow into a full addition, our Home Additions & ADU service covers the wider scope, and homeowners often pair this with a kitchenette refresh through Cabinets & Countertops in South Miami or new flooring via Backsplash, Tile & Flooring in South Miami. We serve the whole South Miami area, including Glenvar Heights, Coral Terrace, and Olympia Heights.