A Groundwork company - serving Miami, FL
Garage Conversion ADU in South Miami, FL | Groundwork Construction Co. of Miami

Garage Conversion ADU in South Miami - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in South Miami: What It Costs and How Long It Takes

A Garage Conversion ADU in South Miami usually runs $53,100 to $153,400 and takes four to seven months from demo to final inspection. You’re turning an existing garage into a legal, separate living unit: new framing and insulation, plumbing for a kitchenette and bath, electrical, a door and window package built for wind code, and city sign-off. Call (833) 968-1198 and we’ll walk your garage and lot before you commit to anything.

Call (833) 968-1198

How We Build It, Start to Finish

Every garage conversion we build in South Miami moves through the same five stages. The durations below are typical; your lot and your garage’s condition set the real clock.

Stage 1 – Walk-through and design (weeks 1-3). We measure the garage, check the slab, and map where the drain lines can actually go. You decide the layout: studio versus one bedroom, kitchenette size, bath placement. This is also when a tree survey and root-protection review happen if a live oak sits near the work, because that can move your entire plan before the first permit is filed.

Stage 2 – Permits and engineering (weeks 3-8). South Miami runs its own building department, so the review is more granular than what you’d see in unincorporated county territory. Plans get stamped, wind-load calculations get submitted, and we schedule inspections. You don’t have to stand in line – we pull the permits and pass the inspections, and you’ll know the status at every checkpoint.

Stage 3 – Demo and structural prep (week 9). The old garage door opening gets framed and closed. We cut the slab for plumbing if the bath isn’t landing near an existing line. On older block garages we often find hairline cracks or a slab that’s settled, so we repair and reinforce before anything gets covered up.

Stage 4 – MEP rough-in and dry-in (weeks 10-14). Electrical, plumbing, and HVAC go in, then rough inspection. After that comes insulation, drywall, and the exterior door and window package. This is the stretch where South Florida weather matters: we stage dry-in around afternoon storms so framing and unfinished drywall don’t sit soaked. You’ll pick fixtures and finishes around this point – that’s the decision deadline that keeps the schedule honest.

Stage 5 – Finishes and final inspection (weeks 15-24). Flooring, cabinets, countertops, paint, trim, and the final walkthrough with the city inspector. Any punch items get closed out before we hand you the keys. Then the 730-Day Done Right Promise covers the workmanship from day one.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

Most of the budget swings here, not in the framing. Here’s what you’re deciding between and the honest trade-off of each.

  • Bath fixtures and layout. A compact shower-and-vanity bath keeps plumbing near an existing line and cuts cost. Moving a drain across the slab adds excavation, concrete repair, and inspection time. Delta and American Standard fixtures hold up well for a rental or in-law suite and don’t break the budget; upgrading to a larger walk-in shower means trenching and a bigger tile package.
  • Kitchenette versus full kitchen. A kitchenette with a sink, cooktop, and under-counter fridge is cheaper and simpler to permit. A full kitchen with a range and venting adds electrical load and ductwork, but rents for more.
  • Flooring. Luxury vinyl plank over the existing slab is the practical pick for humidity and quick installation. Tile costs more in labor but handles wet areas better. Expect to spend on floor prep if the slab has settled or cracked.
  • Door and window package. The garage door opening has to become a wall with an entry door, and every new opening needs impact protection in South Miami. Impact-rated units cost more up front and skip the shutter hassle. This is where a Toto or Schluter upgrade is worth the money – tile shower systems with proper waterproofing (Schluter’s membrane is the one we trust) are the difference between a bathroom that lasts and one that grows mold behind the tile.
  • Insulation and HVAC. A mini-split is the usual answer for a single-room conversion and cheaper to run than extending the house system. Spray foam costs more than batt insulation but seals the block walls better in this climate.

What a Garage Conversion ADU Costs in South Miami, FL

The lead range is $53,100 to $153,400. A straightforward studio conversion with a kitchenette and compact bath lands near the bottom. A full one-bedroom with a real kitchen, premium finishes, and any structural surprises pushes toward the top.

Five things move that number:

  • Garage size and ceiling height. A two-car garage with 9-foot ceilings converts cleanly. A low-slung 1960s carport needs framing work.
  • Plumbing location. Keeping the bath within a few feet of an existing drain line saves thousands. Cutting a new trench across the slab adds concrete, labor, and inspection.
  • Existing condition. Cracked slabs, termite damage, or a roof that needs rebuild to current wind code add scope.
  • Finish grade. Cabinet and countertop quality, fixture brand, and tile versus LVP account for a wide spread.
  • Permit scope. Adding a second utility meter, or complying with the tree ordinance if excavation is involved nearby, adds review time and cost.

Your written estimate is line-item and fixed: the number you see is the number you pay, with no change orders for scope we already priced. What it typically excludes: impact windows beyond the standard package, major structural repairs discovered after demo, and any work tied to a full addition – that’s covered separately under our Home Additions & ADU in South Miami scope.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What South Miami Homes Do to This Job

South Miami is a small city of roughly 12,000 with its own building department, tree protection code, and design standards, so your conversion is reviewed locally rather than by Miami-Dade County – that means a more granular process than you’d get in neighboring Coral Gables or unincorporated territory. The mature live oaks are the wildcard. Before any excavation near the footprint, we run a tree survey and root-protection review, and arborist sign-off can reshape where the garage work, drainage, or a new driveway lands. The housing stock is mostly 1940s to 1960s concrete-block and CBS homes with terrazzo or tile floors and small footprints, often on modest lots being reworked into larger two-story houses. Those block garages regularly need structural reinforcement and a roof rebuilt to current wind code, and the flat, low-lying terrain and high water table complicate drainage and grading on tight infill lots. It’s the kind of work where the details on your specific block matter more than any general rule.

Serving South Miami, FL – Our Local Coverage Area

We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in South Miami

Ready to Price Your Garage Conversion ADU in South Miami?

Call (833) 968-1198 for a free on-site estimate and design consult. We’ll walk the garage, check the slab and drain lines, and talk through what your lot allows before you commit to a number. You’ll get an upfront price with a line-item breakdown, and a live person answers the phone any hour. If your plans grow into a full addition, our Home Additions & ADU service covers the wider scope, and homeowners often pair this with a kitchenette refresh through Cabinets & Countertops in South Miami or new flooring via Backsplash, Tile & Flooring in South Miami. We serve the whole South Miami area, including Glenvar Heights, Coral Terrace, and Olympia Heights.

Written by the team at Groundwork Construction Co.

Why South Miami Chooses Groundwork Construction Co. of Miami

We set the standard for garage conversion ADU in South Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in South Miami

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What South Miami Customers Say

Trusted by homeowners across South Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in South Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in South Miami.

(833) 968-1198

Request a Free Estimate in South Miami

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch