Cabinets & Countertops in South Miami, FL: What to Expect
Cabinets & Countertops in South Miami typically run $16,520 to $53,100 for a full kitchen scope, and most of that spread comes down to materials, layout changes, and whether walls or plumbing move. A straight cabinet swap with new counters lands near the low end and takes about two to three weeks from demo to final caulk. A layout change with new island, moved sink, and premium stone climbs toward the high end and stretches to five or six weeks. Call Groundwork Construction Co. of Miami at (833) 968-1198 for a free on-site estimate.
How the Cabinet and Countertop Job Actually Runs, Stage by Stage
No two kitchens are identical, but the sequence we follow on South Miami jobs is consistent. Here’s what happens from the first walkthrough to the last drawer pull.
Stage 1: Design consult and field measurement (1 to 2 hours, then 3 to 5 days for drawings)
We measure every wall, note the plumb and square, and check where the water lines, drain, and outlets sit inside the existing footprint. This is where you decide cabinet layout, door style, and countertop material. If you’re keeping the sink where it is, the plumbing stays put. If you want the range on the opposite wall, we price the electrical and gas moves now, not after demo.
Stage 2: Ordering and lead time (3 to 6 weeks)
Semi-custom cabinets from a line like KraftMaid carry four to six weeks of lead time; stock cabinets can arrive in two. Natural quartz from Cambria runs closer to three weeks. You put down the order deposit here, and we lock the install date once the truck schedule confirms. This is the longest wait in the project, so we order early and stage the countertop template to follow cabinet install.
Stage 3: Demo and prep (2 to 4 days)
Old cabinets, counters, and backsplash come out. We check the wall behind them for water damage, old tile adhesive, and any block-wall issues common to mid-century South Miami homes. Rough electrical and plumbing get moved or extended if the layout changed. Plaster and drywall get patched and primed so the new cabinets sit flush.
Stage 4: Cabinet install and countertop template (3 to 5 days, then 5 to 10 days for fabrication)
Base and wall cabinets go in level and shimmed. Uppers get hung and the crown gets fit. Once cabinets are set, the countertop fabricator comes out to template the actual stone against the real walls. That template-to-install gap is where most homeowners get impatient. It’s also where the fit gets right, so we don’t rush it.
Stage 5: Countertop install, sink, and final trim (2 to 3 days)
Stone drops in, seams get epoxied, the sink and faucet get set, and the dishwasher gets reconnected. We finish the toe kick, install hardware, and do a punch walkthrough. That’s when you open every drawer and close every door with us in the room.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Weigh Before Signing Off
Every cabinet and countertop decision trades cost against durability and style. Here’s how we lay out the choices on South Miami jobs.
- Stock vs. semi-custom cabinets: Stock boxes come in fixed widths and cost less. Semi-custom lets you hit odd wall dimensions and pick interior pull-outs, at roughly 25 to 40 percent more. On a small mid-century kitchen with irregular walls, semi-custom often saves money elsewhere because fewer filler strips and less custom carpentry are needed.
- Cabinet box material: Plywood boxes hold screws better and resist humidity; particleboard is cheaper and can swell near a dishwasher or sink. In South Florida’s year-round humidity, plywood is worth the upcharge.
- Door style: Painted MDF shaker is the workhorse. Solid wood raised panel costs more and can move with humidity. Flat slab doors suit contemporary rebuilds.
- Quartz vs. granite vs. quartzite: Quartz is non-porous and needs no sealing, which matters in a humid climate. Granite is natural, unique, and requires annual sealing. Quartzite is hard and heat-tolerant but pricier.
- Countertop edge and thickness: A standard eased edge is included; a mitered or waterfall edge adds fabrication labor. Two-centimeter stone on a built-up edge is common; three-centimeter slab reads heavier and costs more.
- Sink and fixture openings: Undermount sinks require the fabricator to cut and polish the opening precisely. Farmhouse sinks push the cabinet run forward and change the layout.
What Cabinets & Countertops Cost in South Miami, FL
A cabinet-only job in South Miami runs $4,720 to $15,340. A countertop-only job runs $2,360 to $7,670. When you do both together, the combined scope is usually more efficient on labor and lands in the $16,520 to $53,100 band for a full kitchen cabinet and countertop package. Call (833) 968-1198 for a written number on your actual kitchen.
Here’s what pushes a job from the low end to the high end:
- Kitchen size and cabinet count: A 10-by-10 galley has far fewer boxes than an L-shaped kitchen with an island. More linear feet means more boxes, more doors, more stone.
- Layout changes: Moving the sink, range, or fridge means new plumbing, gas, and electrical rough-in, which adds real labor and a permit line.
- Material grade: Stock cabinets with laminate counters sit at the bottom. Semi-custom with quartz at the top. That single choice can swing the price by double.
- Existing wall and floor condition: Mid-century block walls that are out of plumb need furring or shimming. Old terrazzo that’s being covered may need leveling first.
- Permit scope: A straight swap may need no permit. Structural, electrical, or plumbing changes trigger a South Miami permit, inspection, and added timeline.
A written estimate should spell out cabinet brand and box material, door style, countertop material and thickness, edge profile, sink and faucet allowance, demo, haul-away, and hardware. Watch for what’s typically excluded: appliance purchase, tile backsplash labor, under-cabinet lighting, and any relocation of gas or drain lines. Those get quoted separately so nothing gets hidden in a change order.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami Homes Specifically Do to This Job
South Miami is its own permitting jurisdiction, not Miami-Dade County, which changes the paperwork and the timeline for this work. The city has its own building department and design review, and it enforces a tree protection ordinance that matters the moment a project scope touches an exterior wall. On the tight lots around Sunset Drive and the blocks off Red Road, mature live oaks frequently sit inside root-protection zones, and any excavation near the house can trigger an arborist sign-off before demo. That reshapes where materials stage and sometimes how the dumpster gets placed.
The housing stock drives the failure modes. Most of the kitchens we open here sit inside 1940s to 1960s concrete-block ranch cottages and CBS bungalows. Behind those walls we regularly find old galvanized supply lines, cast-iron drains near the sink, and terrazzo under the vinyl. The block walls are rarely plumb, so cabinet installs need furring and shimming to get doors to hang flat. And because so many of these small homes are being reworked or replaced with larger two-story houses, an interior kitchen job frequently becomes the first phase of a bigger plan. When the wider scope comes into view, it becomes part of a full Kitchen Remodeling in South Miami project. Homeowners often pair this with Walk-In Showers & Shower Remodeling in South Miami or a Tub-to-Shower Conversion in South Miami while the house is already torn up. Our Kitchen Remodeling service and the broader South Miami service area cover everything from that first cabinet swap to a full rebuild.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in South Miami
Most jobs run three to six weeks total, with cabinet lead time eating the biggest chunk. Demo and install are only about a week of active work; the rest is ordering and stone fabrication. Call (833) 968-1198 and we’ll map the actual calendar to your kitchen.
A straight swap of cabinets and counters with no plumbing, electrical, or structural change often needs no South Miami permit. Once you move a sink, add an outlet, or touch a load-bearing wall, the city’s own building department gets involved and an inspection is required. We pull the permits and pass the inspections, and the estimate spells out exactly which scope triggers one.
Yes, and that’s the most common scope we run. Keeping the sink and range in place avoids a plumbing permit and keeps the project in the low half of the $16,520 to $53,100 range. The trade-off is that a fixed footprint limits layout improvement. We’ll show you both paths on the estimate so you can see the dollar difference.
Every install is covered by our 730-Day Done Right Promise, backed in writing. If a cabinet door sags, a seam opens, or something wasn’t done right, we make it right. Material warranties come from the manufacturer on top of ours. Call for the details before you sign anything.
Painted shaker cabinets with quartz counters are the leading combination here. Quartz’s non-porous surface handles South Florida humidity without annual sealing. Homeowners rebuilding toward a more contemporary look lean toward flat slab doors and quartzite. Either way, we price the actual material selection against your kitchen, not a catalog average.
Get a Free Cabinet and Countertop Estimate in South Miami
Call (833) 968-1198 to schedule a free on-site estimate for Cabinets & Countertops in South Miami. A live person answers, day or night. We walk the kitchen, measure the walls, and hand you a written line-item quote with materials, labor, permit scope, and a firm timeline. No pressure, no vague numbers, no change-order surprises. Upfront pricing, backed by the 730-Day Done Right Promise.
Written by the team at Groundwork Construction Co.