A Groundwork company - serving Miami, FL
Full Bathroom Remodeling in Coral Gables, FL | Groundwork Construction Co. of Miami

Full Bathroom Remodeling in Coral Gables - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Coral Gables, FL: What It Takes and What It Costs

Full bathroom remodeling in Coral Gables runs $9,000 to $28,000 for most homes, and a typical mid-grade project takes 4 to 7 weeks from demo to final inspection. A full remodel means everything comes out and goes back in: tub or shower, tile, vanity, toilet, plumbing rough-in, electrical, and ventilation. Call (833) 968-1198 for a free on-site estimate.

Call (833) 968-1198

How a Full Bathroom Remodel Actually Runs, Stage by Stage

Demo day looks dramatic, but the real work begins after the debris is hauled off. Here’s how we sequence a full bathroom remodel, what gets decided when, and roughly how long each stage takes.

1. Demolition and substrate inspection (2 to 3 days)

We pull everything down to the studs: tile, tub or shower surround, vanity, toilet, and drywall. Then we check what the wall opened up. In Coral Gables homes, this is where surprises surface – a 1920s Mediterranean Revival villa often has coral rock or furring strips behind the tile rather than modern framing, and that changes the prep plan. You decide nothing during this stage except confirming any last-minute fixture selections.

2. Rough-in plumbing and electrical (3 to 5 days)

New drain lines, supply lines, and venting for the shower and vanity go in, along with a dedicated GFCI outlet, exhaust fan wiring, and any recessed lighting. If you’re moving the toilet or shower location, this is the stage that extends the schedule and the budget. You’ll decide the shower valve brand and location here – Delta and American Standard both make valve-and-trim sets that hold up well in South Florida humidity.

3. Inspection and waterproofing (2 to 4 days)

Rough-in work gets inspected before anything closes up. Then we waterproof the wet area – a bonded sheet membrane like Schluter’s Kerdi system or a liquid-applied coating over cement board. This step is where cheap remodels fail years later: skipped or rushed waterproofing is the single most common cause of a shower leaking into the ceiling below.

4. Tile, fixtures, and finishes (8 to 12 days)

Wall and floor tile go down, followed by the shower pan, glass, vanity top, toilet, and trim. Floor tile sets first, then wall tile, then grout and sealing. You’ll decide grout color, tile layout, and trim style at the start of this stage; late changes here cost real money because material is already ordered.

5. Final trim, punch list, and inspection (2 to 4 days)

Mirrors, towel bars, paint touch-ups, and final inspection. We walk the room with you and fix anything on the punch list before we call the job done.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the cost swings in a full bathroom remodel come from three or four material decisions. Here’s what actually matters:

  • Shower enclosure: A tiled shower with a prefab pan runs $4,500 to $12,000 installed. A frameless glass door adds $800 to $2,500. Glass looks better and lasts longer, but it needs squeegee discipline or it clouds with mineral deposits.
  • Tile: Porcelain is the practical choice – it’s dense, resists water, and handles South Florida’s humidity without the maintenance of natural stone. Large-format tile (12×24 or bigger) means fewer grout lines and easier cleaning, but it requires a flatter substrate, which adds prep cost. Marble looks rich but needs sealing every year or two.
  • Vanity: Stock cabinets ($800 to $3,000 installed) are fine for most homes. Custom cabinetry with a quartz top costs more but fits odd wall dimensions. In a Coral Gables villa, wall dimensions are rarely square, so don’t be surprised if custom wins by default.
  • Fixtures: Delta and American Standard make reliable mid-range valve and trim sets. Toto toilets cost more up front but use less water and clog less often – worth it if the bathroom serves a busy household.
  • Ventilation: A properly sized exhaust fan is not optional in this climate. A bath fan rated for the room’s square footage runs $150 to $400 installed and prevents the mold and paint peeling that come from trapped moisture.

What Full Bathroom Remodeling Costs in Coral Gables, FL

The honest range for a full bathroom remodel here is $9,000 to $28,000. Where you land depends on five things:

  • Room size: A hall bath under 50 square feet lands near $9,000 to $14,000; a primary bath over 80 square feet pushes toward the high end.
  • Existing condition: Coral rock walls, old cast-iron drains, or a floor that’s out of level all add labor. A straightforward framing-and-drywall bathroom is the low end.
  • Moving plumbing or structure: Keeping the toilet and shower where they are keeps costs down. Relocating a drain can add $1,500 to $4,000 alone.
  • Material grade: Stock vanity and porcelain tile versus custom cabinetry and natural stone is the single biggest swing – often $5,000 or more across a full room.
  • Permit scope: A like-for-like replacement may need only a plumbing permit; moving walls or adding a window brings structural and electrical permits into the picture.

Our written estimate breaks every line into labor and material, with no change orders unless you approve them. The number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Coral Gables Homes Specifically Do to This Job

Coral Gables is one of the most architecturally regulated cities in the country. The Board of Architects reviews exterior changes, and the Historic Preservation Board weighs in on homes in designated districts, so any bathroom remodel that touches an exterior wall, window, or vent location can require sign-off before work begins. That review cycle adds weeks that simply don’t exist in neighboring Miami or South Miami. The housing stock matters too: 1920s Mediterranean Revival villas and coral rock construction from George Merrick’s original plan mean our crews are working masonry and furring strips rather than modern wood framing, and the waterproofing detail has to suit that substrate. Hurricane season and South Florida’s sun-and-rain cycles also push moisture concerns to the front – a bathroom with an undersized exhaust fan in a 33114 ZIP home will show peeling paint and mold within two seasons. Homeowners often pair this with Roof Repair in Coral Gables while crews are already on the house.

Serving Coral Gables, FL – Our Local Coverage Area

We serve Coral Gables and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Coral Gables

Schedule Your Free Full Bathroom Remodeling Estimate in Coral Gables

Call (833) 968-1198 to schedule a free on-site estimate for Full Bathroom Remodeling in Coral Gables. A live person answers 24/7. On the visit, we measure the room, inspect existing plumbing and substrate, note permit and review requirements, and hand you a written line-item quote with a fixed price and timeline. No pressure, no surprises. If your project is part of a larger scope, our Bathroom Remodeling in Coral Gables page covers the wider plan, and our Bathroom Remodeling service hub explains the full range of work. We serve homeowners throughout Coral Gables, and if you’re also considering Roof Replacement & Installation in Coral Gables, we can coordinate both.

Written by the team at Groundwork Construction Co.

Why Coral Gables Chooses Groundwork Construction Co. of Miami

We set the standard for full bathroom remodeling in Coral Gables.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Coral Gables

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Coral Gables Customers Say

Trusted by homeowners across Coral Gables and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Full Bathroom Remodeling in Coral Gables?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Coral Gables.

(833) 968-1198

Request a Free Estimate in Coral Gables

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch