Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Fountainebleau: Cost, Timeline, and What You’re Actually Choosing
Vanities, tile & fixtures work in Fountainebleau typically runs $9,000 – $28,000 when it’s a full bathroom’s worth of surfaces, plumbing trim and lighting, and most jobs land in that band by week two or three. A vanity swap alone runs $800 – $3,000 and is a different, much faster animal. The range is wide because vanity footprint, tile selection, and whether drains and valves move drive the number far more than square footage does. Call (833) 968-1198 for a free on-site estimate with a written line-item quote.
How the Work Actually Runs, Stage by Stage
This is not a “we handle everything” job. You make real decisions at four points, and knowing when they land keeps the job moving instead of stalling mid-tile.
Stage 1: Measure, Layout, and Selection (days 1 – 3)
We measure the vanity wall, check for level and plumb, and map where the drain, supply lines and vanity sconces need to sit. In Fountainebleau, this is also where the real question surfaces: whether the existing plumbing sits in a masonry wall or a furred-out stud cavity. That single detail changes both the tile demo plan and the tile backer approach. You’ll get your selections locked here (vanity style and size, tile, fixture finishes), because in this area material lead times are the most common cause of a stalled bathroom job.
Stage 2: Demo and Prep (days 3 – 5)
We pull the old vanity, remove existing tile and backer, and inspect the substrate. On 1970s – 2000s concrete-block construction (the norm around Fountainebleau), we frequently find the original thinset bonded to a rough mortar bed rather than a modern cement board, and that has to come back to a sound, flat, waterproofable surface before anything new goes down. Waterproofing membrane goes in here, and it’s not optional in this climate.
Stage 3: Rough-In and Inspection (days 5 – 7)
If your drawer layout, new vanity width or double-sink plan requires relocating a drain or supply, that happens now, before tile. In Fountainebleau, plumbing changes on a bathroom in an unincorporated Miami-Dade building generally trigger a county plumbing permit and inspection. We schedule that inspection and hold the tile until it clears. If you’re staying with the existing plumbing locations, we can often skip the permit and hold the schedule.
Stage 4: Tile Setting and Grout (days 7 – 11)
Floor tile, shower walls if they’re in scope, and the vanity backsplash go in. Large-format tile (24×24 and up) gets a different mortar and more careful layout planning than 12×12 or subway. Grout and sealer follow a full cure window; in South Florida’s humidity that’s often longer than the bag says, and rushing it produces the very mold-prone joints we’re trying to avoid.
Stage 5: Fixtures, Vanity Set, and Final Walkthrough (days 11 – 14)
Vanity goes in and gets shimmed and secured to the wall, countertop gets set, faucet, drain, and supply lines connect, and the toilet, sconces, mirror and towel bars land last. We test every connection and run water before we call it. Then you walk the room with us. Anything not on the punch list gets corrected under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the value in this job sits in three decisions. Here’s what the real options are, with the honest trade-off of each.
- Vanity base – stock, semi-custom or built: Stock vanities (KraftMaid, among others) are the fastest, most predictable choice and land in the $800 – $1,600 range for a typical 48″ – 60″ unit. Semi-custom gets you a specific width to fit an awkward wall and runs $1,600 – $3,000 before the top. Built units cost more and take longer but solve real layout problems.
- Countertop material: Quartz and engineered stone hold up to humidity and cleaning products far better than the marble that looks beautiful in a showroom. Marble is softer, stains, and is a hard sell in a wet bathroom with real use. Laminate is the budget choice; it works, but it’s the thing you’ll replace first in ten years.
- Tile – ceramic, porcelain, or natural stone: Porcelain is denser, more water-resistant, and handles Fountainebleau’s humidity better than ceramic or travertine. Large-format porcelain also means fewer grout lines, which matters in a wet climate. Travertine and marble need sealing and still age faster here. Mosaic shower floors are the standard pick for slip resistance.
- Fixtures – finish and brand: Kohler is a common choice on the faucet and shower-trim side; finish (brushed nickel, matte black, chrome) affects both price and how often you’ll be wiping water spots. PVD-finished faucets hold up longer than standard plated finishes.
- Lighting and mirror: Sconces over the vanity versus a single overhead fixture is a real change to the electrical scope. If you’re adding outlets or moving the vanity light, budget another line item.
What Vanities, Tile & Fixtures Costs in Fountainebleau, FL
The range for this job in Fountainebleau is $9,000 – $28,000 for a full bathroom’s worth of vanity, tile and fixtures. A vanity-only replacement, done without touching plumbing or tile, runs $800 – $3,000. Where a job sits inside that band depends on five things, and we can tell you which apply once we’ve measured.
- Vanity size and material. A 48″ stock vanity with a quartz top is the low end; a 72″ double-sink semi-custom with a stone top pushes it up.
- Tile area and grade. Floor tile plus shower walls plus backsplash is a much bigger scope than floor and backsplash only. Porcelain large-format and natural stone both cost more per square foot.
- Plumbing relocation. Moving a drain or supply means rough-in, a county permit, and an inspection hold. That’s real money and real schedule.
- Electrical changes. Adding a GFCI outlet, moving the vanity light, or upgrading the exhaust fan means an electrician and, in most Fountainebleau buildings, an electrical permit pull.
- Substrate condition. Old mortar beds, water damage behind the existing tile, or a floor that needs flattening all add to demo and prep.
Your written estimate will break out labor, materials, permit fees, and disposal. It’ll also name the fixture and tile lines in writing so nothing gets swapped later. What a quote should not do is leave a line vague. We don’t do that, and the price you sign is the price you pay. If you’re expanding the scope beyond this room, we route it through our Bathroom Remodeling service, which covers the full project.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau Homes Specifically Do to This Job
Fountainebleau (33172) is unincorporated Miami-Dade, sitting just west of the Florida Turnpike, and it’s a dense corridor of 1970s – 2000s mid-rise condos, garden apartments, townhomes and commercial strips. Almost everything here is concrete-block with stucco-over-CMU walls and a flat or low-slope roof, so bathroom work is masonry-first, not wood-frame-first. That means plumbing is often set into a chase or furred cavity, tile is bonded to a mortar bed, and demo takes real time.
Two things make Fountainebleau unusual. First, Miami-Dade operates its own product-control (NOA) approval system for hurricane-rated materials, which is more paperwork-heavy than most neighboring jurisdictions, and that filtering reaches any product that touches the building envelope. Second, the 25/30/40-year recertification cycle that many of these 1970s and 80s buildings are hitting right now routinely turns a persistent moisture issue at a window perimeter or balcony slab into a mandatory repair, and that often touches the bathroom. The South Florida climate adds another layer: year-round humidity and June – November storm season both affect cure times, waterproofing choices, and how fast a permit clears a county counter. This is why we spec full waterproofing rather than spot-sealing, and why we schedule pre-hurricane-season work well ahead of the June crunch. Homeowners in the corridor often pair bathroom work with Tile Roofing in Fountainebleau when the roof above the bathroom shows its own wear, and with Specialty Roofing in Fountainebleau on the low-slope and flat-roof buildings that dominate the garden apartment clusters.
If your job grows past vanities, tile and fixtures into a full remodel with floor plan changes, that’s covered on our Bathroom Remodeling in Fountainebleau page. We also work throughout Fountainebleau and the surrounding areas.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Fountainebleau
A full bathroom’s worth of vanities, tile & fixtures typically takes 10 – 14 working days once materials are on site, and a vanity-only replacement is often a single visit. Permit lead time in unincorporated Miami-Dade adds a few days before work starts, and large-format tile or a custom vanity can add to the schedule. Call (833) 968-1198 and we’ll map the timeline against your selections.
Tile and fixtures alone don’t usually need a permit, but relocating a drain, adding electrical outlets, or changing the exhaust fan does, and that’s a county inspection. Because Fountainebleau sits in unincorporated Miami-Dade, the permit is filed with the county rather than a city office. Call (833) 968-1198 and we’ll tell you exactly which parts of your job need one.
Yes, most vanity, tile & fixtures jobs stay on the existing plumbing and electrical locations, which keeps cost and schedule down. As long as the new vanity width and drawer layout work with the existing drain location, we don’t touch the rough-in. That one restriction is usually what a semi-custom vanity is for. Call (833) 968-1198 to talk through your layout.
Full job: $9,000 – $28,000. Vanity-only: $800 – $3,000. Tile area, vanity material, and whether you’re relocating a drain or adding electrical are the biggest cost movers. Porcelain large-format tile costs more per square foot than ceramic, and a 72″ double-sink vanity with a stone top is a real step up. Call (833) 968-1198 for a written line-item estimate, which is free.
Our workmanship is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That covers installation and finish quality for two full years. Manufacturer warranties on vanities, tile and fixtures apply separately, and we hand those over at final walkthrough. Call (833) 968-1198 with any warranty question.
Get a Free Estimate on Vanities, Tile & Fixtures in Fountainebleau
Call (833) 968-1198 to schedule a free on-site estimate. We’ll measure your bathroom, talk through the vanity, tile and fixture selections you’re weighing, and tell you honestly whether the plumbing or electrical needs to move. You’ll get a written line-item quote with the permit costs included, an Upfront pricing commitment with no surprises, and a start date tied to your actual material lead times. Live person answers, 24/7, ready to book your estimate.
Written by the team at Groundwork Construction Co. of Miami.