A Groundwork company - serving Miami, FL
ADU Design & Permitting in Hialeah, FL | Groundwork Construction Co. of Miami

ADU Design & Permitting in Hialeah - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Hialeah: What It Actually Takes

ADU design and permitting in Hialeah runs $45,000 – $130,000 for the design-through-permit scope on a typical rear or detached unit, and the paperwork alone takes 8 – 14 weeks before a shovel hits the ground. Miami-Dade reviews wind-load calculations, flood elevation, and lot coverage hard, and a unit planned inside an existing footprint moves faster than new ground-up construction. Call (833) 968-1198 to schedule a free on-site estimate.

Call (833) 968-1198

How the Design and Permit Process Runs, Stage by Stage

Most homeowners assume the hard part is building. In Hialeah it’s the approval chain. Here’s the sequence we follow, and what you decide at each step.

Stage 1: Site survey and feasibility (week 1)

We measure the lot, pull the property’s recorded survey, and check setbacks and lot coverage against what’s actually built. In Hialeah’s 33012 and 33002 ZIPs, rear additions built decades ago often sit closer to the property line than current code allows, so this stage tells us whether an ADU can go where you want it. You decide: attached unit, detached unit, or conversion of existing space.

Stage 2: Schematic design (weeks 2 – 4)

We produce floor plans, elevations, and a site plan showing the unit, parking, and utility runs. This is where you make the big calls: square footage, one or two bedrooms, kitchenette layout, and whether the footprint reuses an existing slab. Two rounds of revisions are standard. Changing your mind here costs nothing; changing it after permitting costs weeks.

Stage 3: Engineering and permit drawings (weeks 4 – 7)

A Florida-licensed engineer stamps the structural and wind-load sheets. Miami-Dade requires wind-borne debris protection on all glazed openings in an ADU, so the drawings specify impact-rated windows and doors from the start. Boral and PGT products show up in these specs often because their Florida approvals are already on file. You approve material selections at this stage, not later.

Stage 4: Permit submittal and review (weeks 7 – 12)

We file with the city, respond to reviewer comments, and coordinate any flood-zone elevation documentation. Review cycles in Hialeah can run two or three rounds. You decide nothing here except to stay patient; we handle the back-and-forth and keep you updated.

Stage 5: Permit issuance and construction handoff (weeks 12 – 14)

Once the permit is issued, we schedule the inspection sequence with you and start work. If the ADU is part of a full Home Additions & ADU in Hialeah project, this is where the two scopes merge into one schedule.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your ADU

Every option below shows up on a real Hialeah ADU plan set. The trade-offs are honest, not sales copy.

  • Attached vs. detached unit: Attached units save on foundation and utility runs but complicate the tie-in to your existing block wall. Detached units cost more up front but keep construction dust out of your house.
  • Impact-rated windows and doors: Required in Miami-Dade. PGT and CGI both make Florida-approved impact products; the difference is lead time and frame profile, not code compliance.
  • Flat vs. low-slope roof: Flat roofs match the 1950s – 1970s block home look, but low-slope membrane roofs handle Hialeah’s summer rain better. Both work; the membrane costs more and lasts longer.
  • Kitchenette vs. full kitchen: A kitchenette (sink, mini-fridge, microwave) keeps the unit classified as an ADU in most reviews. A full kitchen with a range can trigger additional review.
  • Impact-rated entry doors: CWS and similar lines give you hurricane protection without shutters. Worth every dollar in a wind zone.

What ADU Design & Permitting Costs in Hialeah, FL

Expect $45,000 – $130,000 for design and permitting through the parent build scope, with design and engineering fees alone running $4,000 – $12,000 and permit fees another $3,000 – $8,000. A converted interior unit lands near the low end; a detached ground-up unit pushes the total up. The variables that move the number:

  • Unit size: A 400 sq ft studio permits and builds for far less than an 800 sq ft two-bedroom.
  • Existing conditions: Unpermitted prior work on the property means extra drawings and sometimes corrective permits before the ADU can be approved.
  • Utility relocation: Moving a sewer line or upgrading an electrical panel adds real cost. The Home Additions & ADU hub covers how we scope those trades.
  • Material grade: Standard builder finishes vs. upgraded cabinetry and tile can swing the interior by $15,000.
  • Permit scope: Flood-zone properties need elevation certificates and additional review, which adds both fees and time.

A written estimate itemizes design, engineering, permit fees, and construction separately, so you can see exactly what each stage costs. No-hassle upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Homes Specifically Do to This Job

Hialeah is a dense, largely Spanish-speaking owner-investor market where most work is remodeling and rebuilding aging mid-century block homes rather than new construction, and where permitting and client communication often happen in Spanish. Contractors who can’t operate bilingually lose the job before the bid is even read, and that matters for an ADU project with a dozen review cycles. The housing stock here is overwhelmingly 1950s – 1970s single-story concrete-block and stucco homes with flat or low-slope roofs, many with converted garages and rear additions built over decades. That means we’re constantly bringing unpermitted owner-built work up to code before an ADU can be approved. Rear and side additions built right up to the property line are common across 33012 and 33017, so we regularly hit setback and lot-coverage violations that were never an issue when the original home went up. Every project builds to Miami-Dade wind-borne debris and flood elevation rules, and roofs and stucco degrade fast in the subtropical sun and humidity, so waterproofing and impact protection aren’t optional line items. We cover the whole city, from Hialeah proper out toward the county line.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Design & Permitting in Hialeah

Get Your Free ADU Design & Permitting Estimate in Hialeah

We’ll come to your Hialeah property, walk the lot, and tell you what’s feasible before you spend a dollar on drawings. On the call, we’ll confirm your address and the ZIP codes we cover (33012, 33002, 33011, 33017), set a time, and answer your questions about timelines and permit scope. Homeowners often pair an ADU with Full Kitchen Remodeling in Hialeah or new Cabinets & Countertops in Hialeah for the main house. Call (833) 968-1198 for a free on-site estimate.

Written by the team at Groundwork Construction Co.

Why Hialeah Chooses Groundwork Construction Co. of Miami

We set the standard for ADU design & permitting in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Design & Permitting in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(833) 968-1198

Request a Free Estimate in Hialeah

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch