Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Coral Gables, FL: Scope, Timeline, and Cost
Cabinets & Countertops work in Coral Gables usually runs $14,000 – $45,000 for a full kitchen package, and most jobs take three to six weeks from demo to final caulk. The cabinet install itself takes two to four days; the countertop template and fabrication add another seven to ten days because stone gets cut only after the boxes are set and level. Call (833) 968-1198 to schedule a free on-site estimate.
How We Run a Cabinet and Countertop Job, Stage by Stage
Cabinet and countertop work is a sequence, not a single event. The order matters because stone can’t be cut until the boxes are locked in, and the boxes can’t be set until the walls are checked. Here’s how a typical Coral Gables job moves.
Stage 1: Measure, Template, and Lock the Layout (Day 1, 2 – 3 hours)
We measure every wall, check for plumb and square, and photograph the existing plumbing and electrical locations. This is where you decide the layout: sink under the window or facing the room, range against the wall or in the island, drawers versus doors at the base. Older Coral Gables homes rarely have square walls, so we note where shims and filler panels will be needed before anything is ordered.
Stage 2: Demo and Wall Prep (Days 2 – 3)
Old cabinets come out, along with the countertop and any failing backsplash substrate. We inspect what’s behind the boxes: water damage near the sink, outdated wiring, soft drywall, or the coral rock and masonry walls common in this city’s 1920s homes. If the wall needs furring or repair, that happens now, not after the cabinets arrive. You confirm the final layout on site before we proceed.
Stage 3: Cabinet Installation (Days 4 – 7)
Base cabinets get set and leveled first, then uppers, then the island if there is one. Doors and drawers go on last so nothing gets knocked out of alignment during the box install. You’ll want to be available for a walkthrough at the end of this stage to confirm door swing direction and drawer placement. Cabinets run $4,000 – $13,000 depending on linear footage and door style.
Stage 4: Countertop Template and Fabrication (Days 8 – 14)
Once the boxes are set, we template the countertop. A fabricator measures the actual installed cabinets, not the plans, because a half-inch difference at the sink cutout matters. Fabrication takes seven to ten days for quartz or granite; laminate and solid surface can be faster. Countertops run $2,000 – $6,500. This is the longest waiting period in the job, and it’s why you shouldn’t schedule a dinner party for week two.
Stage 5: Countertop Install, Sink Set, and Final Walkthrough (Days 15 – 21)
The stone goes in, the sink and faucet get set, and we seal the seams and caulk the backsplash line. If you’re adding a backsplash, that’s a separate scope and a separate step. Final walkthrough covers door alignment, drawer glide tension, and countertop seam inspection. A kitchen island, if you’re adding one, runs $3,000 – $10,000 and gets set during this stage or earlier depending on the design.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the decisions on this job come down to four categories. Here’s the honest trade-off on each.
- Cabinet box construction: Plywood boxes hold up better in South Florida humidity than particleboard; they cost more but resist swelling near the sink and dishwasher. Particleboard is fine for uppers in dry zones if the budget is tight.
- Door style and material: Painted MDF takes a clean finish and suits the Mediterranean look; solid wood and thermofoil are alternatives. Painted MDF can chip at the edges over time; solid wood moves with humidity. KraftMaid is a brand we work with regularly for semi-custom layouts.
- Countertop material: Quartz is non-porous and low-maintenance, which suits busy kitchens. Granite is durable but needs sealing. Laminate is the budget option and shows wear faster near the sink. Cambria quartz is one we spec often for its consistent color and stain resistance.
- Sink and faucet configuration: Undermount sinks pair cleanly with stone tops but require the fabricator to cut and polish the edge; drop-in sinks are simpler to install and easier to replace later. Decide this before template day, not after.
What Cabinets & Countertops Costs in Coral Gables, FL
The lead range for a full cabinet and countertop package here is $14,000 – $45,000. A smaller scope, like replacing uppers only or a countertop swap without new boxes, can come in lower. Here’s how the line items break down.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash (if added) | $800 – $2,500 |
| Full package | $14,000 – $45,000 |
Five variables push a job toward the high end: linear footage of cabinetry (a 20-foot run costs more than a 12-foot galley), material grade (quartz versus laminate is a $4,000 swing on a typical top), whether plumbing or electrical needs to move (relocating a sink adds trade labor and possibly a permit), wall condition behind the old cabinets (coral rock and plaster repairs cost more than drywall patches), and island additions. A written estimate from us lists each line, the material allowances, and what’s excluded. What’s typically not included: appliance hookups beyond the existing connections, structural changes, and design fees if you need drawings. Upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Coral Gables Homes Specifically Do to This Job
Coral Gables is one of the most architecturally regulated cities in the US. The Board of Architects reviews exterior changes, new construction, and even paint colors under the city’s Mediterranean Revival design code, so cabinet and countertop work that touches windows, doors, or exterior sightlines can pull a project into a design-review cycle that simply doesn’t exist in neighboring Miami or South Miami. Interior cabinet swaps generally don’t trigger Board review, but if your job involves moving a window, changing a door, or altering exterior trim near the kitchen, plan for submittal time. That’s a schedule reality, not a warning.
The housing stock matters too. Coral Gables is dominated by 1920s Mediterranean Revival villas, Mission-style homes, and coral rock (oolitic limestone) construction from George Merrick’s original planned community. Renovation here routinely means working with masonry walls and terracotta, not generic wood-frame building. A 1920s kitchen wall may be solid coral rock with a plaster skim coat, which changes how cabinets get anchored and how countertops get leveled. We see failures in these homes when a prior owner screwed boxes directly into crumbling plaster without proper anchors. Subtropical South Florida’s hurricane season (June – November) and its sun and rain cycles also push projects indoors during the summer, so cabinet and countertop work is often scheduled for late spring or fall to avoid moisture issues during install. Our Coral Gables service covers the full city, including the 33114 ZIP.
Cabinets & Countertops Questions We Get in Coral Gables
How long does a cabinet and countertop job take in Coral Gables?
Three to six weeks for a full package, with the countertop fabrication wait as the longest stretch. Cabinet install takes two to four days; the stone template and fabrication add seven to ten days. Call (833) 968-1198 for a schedule based on your actual layout.
Do cabinets and countertops need a permit in Coral Gables?
Typically no permit is required for a like-for-like cabinet and countertop replacement, but moving plumbing, electrical, or structural elements does require one. Coral Gables’ design-review rules mean any exterior change near the kitchen may need Board of Architects sign-off. We’ll tell you what your job needs during the estimate.
Can I replace cabinets and countertops without moving plumbing or structure?
Yes, and most of our Coral Gables jobs are exactly that: new boxes in the same footprint, new tops on top. Keeping the sink and range where they are saves trade labor and avoids permit scope. If you want to relocate the sink, expect added cost and a longer timeline.
How much do cabinets and countertops cost in Coral Gables?
The full package runs $14,000 – $45,000, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500 as separate line items. Call (833) 968-1198 for an exact quote. Estimates are free.
What warranty comes with the work?
All our cabinet and countertop work is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s two full years of workmanship coverage, backed in writing, on top of the manufacturer warranties on the materials.
Serving Coral Gables, FL – Our Local Coverage Area
We serve Coral Gables and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Get a Free Cabinet and Countertop Estimate in Coral Gables
If your cabinets are dated, your countertop is chipped, or you’re planning a kitchen update, call (833) 968-1198 to schedule a free on-site estimate in Coral Gables. A live person answers 24/7. We’ll measure your kitchen, walk through material options, and give you a written line-item quote with upfront pricing and no surprises. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available. Homeowners often pair this with Walk-In Showers & Shower Remodeling in Coral Gables or a Tub-to-Shower Conversion in Coral Gables when they’re updating more than one room. If the wider scope comes up, our Kitchen Remodeling service covers the full kitchen, and you can see the city overview at Kitchen Remodeling in Coral Gables.
Written by the team at Groundwork Construction Co.