Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Coral Gables, FL: What the Job Actually Involves
Full kitchen remodeling in Coral Gables typically runs $14,000 to $45,000 and takes six to twelve weeks from demolition to final punch list. The job means gutting the room to the studs and joists, replacing cabinets, counters, flooring, lighting, plumbing fixtures, and usually the electrical circuits behind the walls. Coral Gables adds a step most cities don’t: design review. Call (833) 968-1198 for a free on-site estimate and we’ll walk the room and the review requirements with you before anything gets priced.
How a Groundwork kitchen gut plays out, stage by stage
We don’t hand you a schedule and disappear. Here’s the actual sequence, with the decision points that matter.
Stage 1: Walkthrough, measurements, and the plan (week 1)
We measure the room, photograph the existing plumbing and electrical, and open a wall cavity or two where we suspect old work. You decide the cabinet layout, the appliance sizes, and whether any walls move. By the end of this week you have a fixed line-item quote, a material list, and a start date. If your home sits in Coral Gables’ design-review zones, we flag early whether the scope triggers a Board of Architects submittal.
Stage 2: Permits and shop drawings (weeks 2 – 4)
We pull the permit and submit plans. This is where Coral Gables jobs run a little longer than Miami jobs: plan review on a kitchen remodel in the city typically adds two to four weeks, and if a window, door, or exterior element is in scope, the design-review cycle adds more. You use this window to finalize cabinet finish, countertop edge profile, and fixture selections so nothing stalls the crew.
Stage 3: Demolition and rough-in (3 – 5 days)
We protect the floors outside the work area, shut off the utilities, and tear out to the framing. Then the rough-in: new electrical circuits for countertop and island outlets, GFCI protection at every wet location, new drain and supply lines if we’re moving the sink, and any structural changes. The inspector signs off before a single cabinet box arrives. If the demo uncovers old termite damage or a crumbling terracotta drain line, we stop, photograph it, and price the fix in writing before proceeding.
Stage 4: Drywall, paint, and the set (weeks 5 – 8)
Insulation goes back in, drywall goes up, and we prime and paint walls and ceiling. Then the install sequence: base cabinets, wall cabinets, the island if there is one, and the countertop template. Fabricators usually need three to seven business days between template and install, and you’ll feel that gap. Appliances land after counters.
Stage 5: Finishes and final walkthrough (weeks 9 – 12)
Backsplash, sink and faucet, lighting trim, switch plates, floor transitions, and hardware. We test every outlet, run the dishwasher and disposal, and check that the cabinet doors align. You walk the room with us and anything that isn’t right goes on a punch list, which we close before we call the job done. Everything is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll weigh before demo starts
- Cabinet box construction: Plywood boxes hold up better than particleboard in South Florida humidity. KraftMaid offers both; the plywood upgrade runs higher but you feel the difference after a few summer cycles.
- Countertop material: Quartz (Cambria is one we spec regularly) is non-porous and easy to live with. Natural stone needs sealing and shows every stain. Laminate is the budget option and will show wear first.
- Sink and faucet: Undermount stainless or a composite basin paired with a Delta pull-down faucet is the practical sweet spot. A farmhouse apron sink is beautiful but ties your cabinet run to a specific box.
- Plumbing fixtures: A standard deck-mount setup costs less and is easier to service than a wall-mount. If you’re replacing the disposal, a 3/4-hp unit handles most households.
- Flooring: Porcelain tile is the default in Coral Gables homes because it handles moisture and matches the Mediterranean character. Luxury vinyl plank is cheaper and warmer underfoot; hardwood is the outlier here.
- Underlayment and waterproofing: Schluter systems under tile flooring and in wet zones are worth the cost. Skip them and you’re asking for membrane failure in year five.
What full kitchen remodeling costs in Coral Gables, FL
The lead range is $14,000 to $45,000. Most Coral Gables jobs land in the middle because the housing stock demands more masonry work than newer construction.
| Line item | Typical range |
|---|---|
| Cabinet installation (full run + island) | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
| Full remodel, all trades combined | $14,000 – $45,000 |
What pushes a job toward $45,000: moving the sink or range to a new wall, taking down a load-bearing wall, upgrading to full custom cabinetry, or adding a window that triggers Florida Building Code high-velocity hurricane zone (HVHZ) impact requirements. What keeps it near $14,000: keeping the layout, refacing rather than replacing boxes, mid-grade counters, and no structural work. Your written estimate lists every line and the number you see is the number you pay. It typically excludes appliances, structural repairs discovered during demo, and design fees if you hire an outside designer.
See the difference
Before
After
Before
After
Before
AfterWhat Coral Gables homes specifically do to this job
The Coral Gables housing stock is dominated by 1920s Mediterranean Revival villas, Mission-style homes, and oolitic limestone (coral rock) construction from George Merrick’s original planned community. That means our crews regularly trade a drywall saw for a masonry blade. Walls in coral rock don’t take a stud finder the way wood framing does, and old electrical often turns out to be knob-and-tube behind plaster, which we have to address before the inspector will pass. The lone ZIP for this district, 33114, is also under one of the most regulated design-review regimes in the country: the Board of Architects reviews exterior changes under the Mediterranean Revival code, and Historic Preservation Board scrutiny applies in some corridors. A kitchen remodel that stays entirely inside the room usually sidesteps that. One that touches a window, an exterior door, or a bump-out does not, and we budget those submittal cycles into the schedule. Near the Granada Boulevard and Alhambra Circle corridors, we see the same failure modes on repeat: undersized 1950s wiring, cast-iron drain stacks that back up every few years, and cabinet boxes swollen from decades of humidity in a home with no exhaust hood vented to the exterior.
Serving Coral Gables, FL – Our Local Coverage Area
We serve Coral Gables and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about Full Kitchen Remodeling in Coral Gables
Six to twelve weeks is the realistic window for a gut remodel, with permits accounting for two to four of those weeks. A design-review submittal for any exterior change can add another two to four. Call (833) 968-1198 and we’ll give you a dated schedule after the walkthrough.
Yes. Coral Gables requires permits for any work that touches electrical, plumbing, or structural elements, which is most full kitchen remodels. We pull the permit and see every inspection through. If you’re unsure whether your scope triggers one, ask before you sign anything.
It can, and plenty of our Coral Gables jobs stay inside the existing layout. Keeping the sink and range in place and skipping any wall removal often pulls the budget toward the $14,000 – $20,000 end. You lose the chance to redesign the work triangle, so weigh that against the savings.
The range is $14,000 to $45,000, and where you land depends on cabinet grade, countertop material, whether plumbing or structure moves, and the condition of what we find behind the plaster. Call (833) 968-1198 for an exact quote. Estimates are free.
Every job is covered by our 730-Day Done Right Promise: if something isn’t right, we make it right. That covers our workmanship for two full years, one of the longest guarantees in residential construction.
Get a free estimate on your Coral Gables kitchen
Call (833) 968-1198 and a live person picks up, twenty-four hours a day. We’ll schedule an on-site visit, walk the room, flag the permit and design-review questions, and hand you a written line-item estimate with fixed pricing. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off. This is part of a Kitchen Remodeling in Coral Gables plan we build with you from the first walkthrough.
If you’re weighing the broader scope of our Kitchen Remodeling work, that page covers the full picture. Homeowners across Coral Gables often pair this with a Full Bathroom Remodeling in Coral Gables project to keep trades on one schedule, and a Walk-In Showers & Shower Remodeling in Coral Gables upgrade when the primary bath needs the same attention.
Written by the team at Groundwork Construction Co.