Full Kitchen Remodeling in Miami, FL: Scope, Timeline and Cost
Full kitchen remodeling in Miami typically costs $16,520 to $53,100 and takes 8 to 14 weeks from the first demo day, depending on whether you move plumbing, gas, or any walls. That range covers a real gut remodel: new cabinets and countertops, new flooring, upgraded electrical and lighting, plumbing changes at the sink, ventilation, and finish work from a bare stud bay. Call (833) 968-1198 and a live person answers around the clock to set up a free on-site estimate.
What Happens Once the Kitchen Comes Out: Our Stage-by-Stage Process
Full kitchen remodeling is a sequence, and most of the frustration homeowners have felt before comes from a contractor who doesn’t explain it. Here’s the order we work in, and where you have to make decisions.
Stage 1: Site protection and demolition (days 1 – 3)
We seal off the kitchen with plastic and zip-wall barriers, lay floor protection on the path to the front door, and shut down the circuits feeding the room. Demo starts on the cabinets and counters, then flooring, then any wall the plan says goes. By the end of day 3 you should see studs, subfloor, and exposed plumbing and wiring. Appliances are disconnected here and should already be parked somewhere else.
Stage 2: Rough-in and permit inspection (days 4 – 12)
This is the phase nobody sees and everybody underestimates. We rough in any new electrical circuits, relocate a gas line if the range moves, and repipe the sink and dishwasher supply and drain lines. If the layout moves a fixture, that means opening walls. Once the rough work is done, the inspector comes before anything is closed back up. Nothing gets covered until that inspection passes.
Stage 3: Drywall, prep, and flooring (days 13 – 21)
Walls get patched and primed, and flooring goes down before cabinets do so the cabinets sit on a finished surface rather than on a void. If the floor is tile, the set time is real time. This is the stage where the kitchen finally starts looking like a room again instead of a construction site.
Stage 4: Cabinet and countertop set (days 22 – 35)
Upper and lower cabinets get set and leveled, which is the single most important day for how the finished room feels. Once boxes are in, the countertop fabricator templates the stone. Templating to install usually runs a week to 10 days for quartz or granite. Sinks, faucets, and the disposal go in after the top is set.
Stage 5: Finishes, punch list, final walkthrough (days 36 – 50)
Backsplash, lighting trim, outlets and switch plates, paint touch-ups, appliance reinstallation, and the vent hood connect. We do a full walkthrough with you and write a punch list on the spot. Every project here is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Change the Room
You’ll make roughly a dozen decisions that shape both the budget and how the kitchen holds up. The trade-offs are honest ones.
- Cabinet construction: Plywood boxes with dovetail drawers outlast particleboard, and they matter more than the door style. KraftMaid is a partner brand we install, and it’s a practical middle ground between stock boxes and full custom. Custom millwork adds money and four to eight weeks to the schedule.
- Countertop stone: Quartz holds up to Miami humidity without sealing and handles stains well. Granite is often cheaper by the square foot but needs periodic resealing, which matters in a humid house. Both run the width of the surface; the difference is maintenance, not durability.
- Fixtures and faucets: Delta and American Standard cover the range from builder-grade to durable everyday use, and the parts are available locally if something ever needs a cartridge. Cheaper faucets fail at the same spot every time, and the failure comes with water under the cabinet.
- Wet-area waterproofing: Schluter systems are worth it under tile flooring and around the sink. In a climate where humidity stays high all year, a substrate that drains correctly prevents the soft spots and mold that start under the floor and stay hidden until they don’t.
- Flooring: Porcelain tile shrugs off water and cleaning and suits Miami’s climate. Luxury vinyl plank is cheaper and warmer underfoot. Engineered hardwood looks great but is the wrong call near the sink and dishwasher in this humidity.
- Ventilation: A ducted hood that vents outside is not optional in a house that’s closed up with the AC running. Recirculating hoods move grease around. Ducting to the exterior is the difference.
What Full Kitchen Remodeling Costs in Miami, FL
Expect $16,520 at the low end and $53,100 at the high end for a full kitchen remodel in Miami. That’s a wide spread because a kitchen remodel is really a stack of separate jobs, and each one has its own range:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,720 – $15,340 |
| Countertop installation | $2,360 – $7,670 |
| Backsplash | $945 – $2,950 |
| Kitchen island | $3,540 – $11,800 |
Five variables push a Miami job toward the high end:
- Size: A galley kitchen and a 250-square-foot open kitchen with an island aren’t the same project. Cabinet and countertop cost tracks linear feet.
- Existing condition: Older concrete-block homes often have wiring and plumbing that weren’t built for today’s loads. Opening a wall can reveal work that has to be corrected before anything new goes in.
- Moving the plumbing, gas, or structure: Relocating a sink or range means new drain, supply, and vent runs inside a block wall. That’s the single biggest line-item jump.
- Material grade: Stock cabinets, laminate, and entry fixtures sit near the bottom of the range. Custom millwork, quartzite, and a cooktop hood at the top.
- Permit scope: A cosmetic refresh with no utility changes costs less to permit than a layout change that triggers electrical and plumbing inspections.
A written estimate from us lists every line item with a price. No-hassle upfront pricing means the number you see is the number you pay, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months. What’s typically not included: appliances, unforeseen structural or termite damage found behind a wall, and moving gas or electrical service at the panel.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Homes Specifically Do to This Job
Full kitchen remodeling in Miami runs into rules and conditions you won’t see in most of the country. Miami-Dade is the only place in the U.S. with its own product-approval system: windows and exterior doors carry a Miami-Dade NOA number, not just a national approval. That matters in a kitchen the moment the plan touches a window or slider along the exterior wall, because you can’t just drop in whatever unit the box store stocks. Older concrete-block and CBS houses, many of them built before 1970, also show up with unreinforced masonry walls that change how you cut a new opening for a pass-through or an island vent. Termite pressure on any wood framing in these homes is severe, so we inspect before we close a wall. And in blocks of Coral Gables, Miami Springs, and Brownsville, the permitting and historic-district review moves at its own pace. Along the coastal stretch the 40-Year Recertification and coastal wind rules shape what an inspector will sign off on. That’s why the same kitchen plan costs differently in a Brickell condo than in a 1950s CBS house off Coral Way.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Kitchen Remodeling in Miami
Plan on 8 to 14 weeks. The fast end assumes the layout stays put, cabinets and stone are ordered at contract signing, and no surprises turn up in the walls. Layout changes that move plumbing or require a structural engineered opening add weeks, mostly in the permit review and inspection windows.
Yes, if you’re changing anything behind the wall: electrical, plumbing, gas, or the layout. Cosmetic swaps like cabinets and countertops in the same footprint often don’t require a permit, but the safest answer is to ask the plans reviewer. We pull the permits and pass the inspections; that’s part of the job, not an add-on.
Yes, and it’s the most common way to keep a full kitchen remodeling project near the low end of the range. Keeping the sink, range, and dishwasher where they are means no new rough-in work and no re-routing. You still get new cabinets, counters, flooring, lighting, and finishes.
The range is $16,520 to $53,100. A small footprint with stock cabinets and laminate counters sits near the bottom; a large open kitchen with custom cabinets, quartz, an island, and a relocated sink runs toward the top. Call (833) 968-1198 for an exact quote, since estimates are free.
No, not for anything in the written scope. Our pricing is fixed up front, and the number you see is the number you pay. The only changes come from work you approve in writing, like a hidden termite repair or an added circuit. Every project is backed by the 730-Day Done Right Promise.
Get a Free Estimate for Full Kitchen Remodeling in Miami
Call (833) 968-1198 and a live person answers any hour, any day, to schedule a free on-site estimate for full kitchen remodeling in Miami. We walk the kitchen, measure the footprint, check what’s behind the walls, and put a line-item price in writing. You’ll know what the job costs before you commit, and there’s $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co. of Miami.