A Groundwork company - serving Miami, FL
Full Kitchen Remodeling in Miami, FL | Groundwork Construction Co. of Miami

Full Kitchen Remodeling in Miami - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Kitchen Remodeling in Miami, FL: Scope, Timeline and Cost

Full kitchen remodeling in Miami typically costs $16,520 to $53,100 and takes 8 to 14 weeks from the first demo day, depending on whether you move plumbing, gas, or any walls. That range covers a real gut remodel: new cabinets and countertops, new flooring, upgraded electrical and lighting, plumbing changes at the sink, ventilation, and finish work from a bare stud bay. Call (833) 968-1198 and a live person answers around the clock to set up a free on-site estimate.

Call (833) 968-1198

What Happens Once the Kitchen Comes Out: Our Stage-by-Stage Process

Full kitchen remodeling is a sequence, and most of the frustration homeowners have felt before comes from a contractor who doesn’t explain it. Here’s the order we work in, and where you have to make decisions.

Stage 1: Site protection and demolition (days 1 – 3)

We seal off the kitchen with plastic and zip-wall barriers, lay floor protection on the path to the front door, and shut down the circuits feeding the room. Demo starts on the cabinets and counters, then flooring, then any wall the plan says goes. By the end of day 3 you should see studs, subfloor, and exposed plumbing and wiring. Appliances are disconnected here and should already be parked somewhere else.

Stage 2: Rough-in and permit inspection (days 4 – 12)

This is the phase nobody sees and everybody underestimates. We rough in any new electrical circuits, relocate a gas line if the range moves, and repipe the sink and dishwasher supply and drain lines. If the layout moves a fixture, that means opening walls. Once the rough work is done, the inspector comes before anything is closed back up. Nothing gets covered until that inspection passes.

Stage 3: Drywall, prep, and flooring (days 13 – 21)

Walls get patched and primed, and flooring goes down before cabinets do so the cabinets sit on a finished surface rather than on a void. If the floor is tile, the set time is real time. This is the stage where the kitchen finally starts looking like a room again instead of a construction site.

Stage 4: Cabinet and countertop set (days 22 – 35)

Upper and lower cabinets get set and leveled, which is the single most important day for how the finished room feels. Once boxes are in, the countertop fabricator templates the stone. Templating to install usually runs a week to 10 days for quartz or granite. Sinks, faucets, and the disposal go in after the top is set.

Stage 5: Finishes, punch list, final walkthrough (days 36 – 50)

Backsplash, lighting trim, outlets and switch plates, paint touch-ups, appliance reinstallation, and the vent hood connect. We do a full walkthrough with you and write a punch list on the spot. Every project here is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change the Room

You’ll make roughly a dozen decisions that shape both the budget and how the kitchen holds up. The trade-offs are honest ones.

  • Cabinet construction: Plywood boxes with dovetail drawers outlast particleboard, and they matter more than the door style. KraftMaid is a partner brand we install, and it’s a practical middle ground between stock boxes and full custom. Custom millwork adds money and four to eight weeks to the schedule.
  • Countertop stone: Quartz holds up to Miami humidity without sealing and handles stains well. Granite is often cheaper by the square foot but needs periodic resealing, which matters in a humid house. Both run the width of the surface; the difference is maintenance, not durability.
  • Fixtures and faucets: Delta and American Standard cover the range from builder-grade to durable everyday use, and the parts are available locally if something ever needs a cartridge. Cheaper faucets fail at the same spot every time, and the failure comes with water under the cabinet.
  • Wet-area waterproofing: Schluter systems are worth it under tile flooring and around the sink. In a climate where humidity stays high all year, a substrate that drains correctly prevents the soft spots and mold that start under the floor and stay hidden until they don’t.
  • Flooring: Porcelain tile shrugs off water and cleaning and suits Miami’s climate. Luxury vinyl plank is cheaper and warmer underfoot. Engineered hardwood looks great but is the wrong call near the sink and dishwasher in this humidity.
  • Ventilation: A ducted hood that vents outside is not optional in a house that’s closed up with the AC running. Recirculating hoods move grease around. Ducting to the exterior is the difference.

What Full Kitchen Remodeling Costs in Miami, FL

Expect $16,520 at the low end and $53,100 at the high end for a full kitchen remodel in Miami. That’s a wide spread because a kitchen remodel is really a stack of separate jobs, and each one has its own range:

Line item Typical range
Cabinet installation $4,720 – $15,340
Countertop installation $2,360 – $7,670
Backsplash $945 – $2,950
Kitchen island $3,540 – $11,800

Five variables push a Miami job toward the high end:

  • Size: A galley kitchen and a 250-square-foot open kitchen with an island aren’t the same project. Cabinet and countertop cost tracks linear feet.
  • Existing condition: Older concrete-block homes often have wiring and plumbing that weren’t built for today’s loads. Opening a wall can reveal work that has to be corrected before anything new goes in.
  • Moving the plumbing, gas, or structure: Relocating a sink or range means new drain, supply, and vent runs inside a block wall. That’s the single biggest line-item jump.
  • Material grade: Stock cabinets, laminate, and entry fixtures sit near the bottom of the range. Custom millwork, quartzite, and a cooktop hood at the top.
  • Permit scope: A cosmetic refresh with no utility changes costs less to permit than a layout change that triggers electrical and plumbing inspections.

A written estimate from us lists every line item with a price. No-hassle upfront pricing means the number you see is the number you pay, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months. What’s typically not included: appliances, unforeseen structural or termite damage found behind a wall, and moving gas or electrical service at the panel.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Homes Specifically Do to This Job

Full kitchen remodeling in Miami runs into rules and conditions you won’t see in most of the country. Miami-Dade is the only place in the U.S. with its own product-approval system: windows and exterior doors carry a Miami-Dade NOA number, not just a national approval. That matters in a kitchen the moment the plan touches a window or slider along the exterior wall, because you can’t just drop in whatever unit the box store stocks. Older concrete-block and CBS houses, many of them built before 1970, also show up with unreinforced masonry walls that change how you cut a new opening for a pass-through or an island vent. Termite pressure on any wood framing in these homes is severe, so we inspect before we close a wall. And in blocks of Coral Gables, Miami Springs, and Brownsville, the permitting and historic-district review moves at its own pace. Along the coastal stretch the 40-Year Recertification and coastal wind rules shape what an inspector will sign off on. That’s why the same kitchen plan costs differently in a Brickell condo than in a 1950s CBS house off Coral Way.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Full Kitchen Remodeling in Miami

Get a Free Estimate for Full Kitchen Remodeling in Miami

Call (833) 968-1198 and a live person answers any hour, any day, to schedule a free on-site estimate for full kitchen remodeling in Miami. We walk the kitchen, measure the footprint, check what’s behind the walls, and put a line-item price in writing. You’ll know what the job costs before you commit, and there’s $1,000 off projects over $10,000.

Written by the team at Groundwork Construction Co. of Miami.

Why Miami Chooses Groundwork Construction Co. of Miami

We set the standard for full kitchen remodeling in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your full kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Full Kitchen Remodeling in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 968-1198

Request a Free Estimate in Miami

Tell us about your full kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch