A Groundwork company - serving Miami, FL
Garage Conversion ADU in Hialeah, FL | Groundwork Construction Co. of Miami

Garage Conversion ADU in Hialeah - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Hialeah: What It Really Takes

A garage conversion ADU in Hialeah typically runs $45,000 to $130,000 and takes 3 to 5 months from permit to final inspection. The work turns an existing attached garage into a legal living unit: new framing and insulation, a full bathroom, a kitchenette, separate electrical, and a door and window package rated for Miami-Dade wind loads. Most Hialeah garages start at 240 to 400 square feet, which is enough for a studio or a one-bedroom. Call (833) 968-1198 and we’ll walk your garage and give you a written range.

Call (833) 968-1198

How a Hialeah Garage Conversion ADU Gets Built, Stage by Stage

The sequence matters more than the pitch. Here’s what actually happens, in order, so you know what you’re signing up for.

Stage 1: Measure, assess, and set the scope (week 1)

We measure the garage, check the slab, look at how the tie-beam and roof connect to the house, and trace where the electrical panel sits and how much capacity is left. In Hialeah’s older block homes, this is where surprises surface: a panel with no room for a subpanel, a slab that’s cracked or sitting below grade, or an overhead door opening that will need structural infill. You decide at this point whether the unit is a studio or gets a separate bedroom wall, because that changes the egress window requirement.

Stage 2: Permits and drawings (weeks 2 to 6)

We submit to the City of Hialeah with the drawings, wind-load calculations, and flood elevation paperwork. This is the slowest stretch and the one that catches homeowners off guard. Hialeah’s building department runs a heavy remodel and addition caseload, so plan on review time you can’t rush. You’ll sign off on the layout and finish schedule while you wait, not after.

Stage 3: Demo, framing, and rough-in (weeks 6 to 10)

Day one of construction is demolition: out comes the overhead door, the old garage slab finish gets assessed, and any termite-damaged framing at the door opening gets replaced. Then we frame the new exterior wall where the door was, add the bathroom walls and closet, and run rough plumbing and electrical. The rough inspection has to pass before anything gets closed up. You pick fixtures and tile by the end of this stage, because the next stage won’t wait.

Stage 4: Insulation, drywall, and finishes (weeks 10 to 16)

Closed-cell spray foam goes in the walls and ceiling, which matters in a Hialeah garage because the space sits under a low-slope roof that bakes in July. Drywall, texture, paint, flooring, cabinets, countertop, and the bathroom tile all land here. This is the longest visual stretch, and the one where a homeowner’s change of heart on a vanity costs the most time.

Stage 5: Final inspections and handoff (weeks 16 to 20)

Electrical, plumbing, building, and a final inspection close out the permit. If the unit is a rental, this is the paperwork a future tenant or buyer will ask for. We walk the space with you, hand over the permit record, and the work starts its coverage under the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Garage Conversion ADU

Most of the decisions come down to five areas. Here’s the honest trade-off on each.

  • Slab and floor system. A stained or polished existing slab is the cheapest route and holds up well if the slab is sound. A raised plywood subfloor over sleepers feels warmer and hides an uneven slab, but it eats ceiling height and costs more. In a Hialeah garage with a low roof, height is precious.
  • Windows and doors. Impact-rated units are the baseline here, not an upgrade. We work with PGT and CGI for impact glazing because the wind-borne debris rules for this county leave little room to cut corners. Standard units get rejected at plan review.
  • Bathroom and kitchenette location. Keeping the bathroom on the wall nearest the house plumbing keeps the drain runs short and the cost down. Pushing it to the far corner adds trenching through the slab and a bigger plumbing line item.
  • Electrical service. A subpanel fed from the main panel is the normal path. If the main panel is a 1950s fuse box or already loaded, a service upgrade enters the budget and the timeline.
  • Exterior skin. Stucco to match the house is the standard and blends into Hialeah’s block-and-stucco streetscape. Boral trim around the new wall and opening holds paint well in this humidity.

What a Garage Conversion ADU Costs in Hialeah, FL

Plan on $45,000 to $130,000. A straightforward studio conversion in a sound 300-square-foot garage lands near the bottom. A one-bedroom with a full kitchen, a service upgrade, and structural work at the old door opening pushes toward the top. Here’s roughly how the money splits:

Line item Typical range
Permits, drawings, wind-load engineering $3,500 – $9,000
Demolition and structural infill at the door opening $4,000 – $12,000
Framing, insulation, drywall $8,000 – $20,000
Electrical, including subpanel $5,000 – $14,000
Plumbing and full bathroom $9,000 – $22,000
Kitchenette, cabinets, countertop $6,000 – $18,000
Impact windows, doors, finishes, flooring $9,000 – $30,000

Five things move that number: garage size, the condition of the slab and roof structure, whether the bathroom sits far from the house plumbing, the electrical service capacity, and how much of the permit scope is yours to carry. A written estimate from us is line-item, so you can see exactly which of those is driving your figure. What’s usually not included: furniture, appliances beyond the kitchenette package, and any unpermitted work a prior owner left behind that has to be corrected before the unit can be legalized.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Homes Specifically Do to This Job

Hialeah is a dense, predominantly Cuban-American, largely Spanish-speaking owner-investor market where most of the construction is remodels and rebuilds of aging mid-century block homes, not new subdivisions. That shapes a garage conversion ADU in ways a suburban page won’t tell you. Most of the garages we open up are attached to 1950s to 1970s single-story concrete-block houses with flat or low-slope roofs, and many already have decades of owner-built work inside them: a finished room, a rear addition, a wall that was never permitted. Permitting, inspections, and every conversation with the homeowner happen in Spanish as often as in English, and a contractor who can’t run the job bilingually loses the bid before anyone reads it. Across 33012 and the surrounding ZIPs, rear and side structures built right up to the property line are common, so a conversion that changes the footprint or cover can trigger setback and lot-coverage scrutiny that never came up when the block house went up. Add hurricane-season wind-load requirements and flood elevation rules on top, and the plans have to clear more than a cosmetic remodel would. We handle the permitting and inspections and pass them before the job closes.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Hialeah

Get a Written Estimate for Your Garage Conversion ADU in Hialeah

We’ll come out, measure the garage, check the slab and panel, and hand you a line-item written estimate for your garage conversion ADU in Hialeah, with no-hassle upfront pricing so the number you see is the number you pay. If the conversion is part of a full Home Additions & ADU in Hialeah plan, we scope it that way. Call (833) 968-1198 for a free estimate. We answer live, 24/7.

Converting a garage often means rethinking the rooms next to it. Homeowners frequently pair this with Cabinets & Countertops in Hialeah for the adjoining kitchen, and with Backsplash, Tile & Flooring in Hialeah when the flooring runs from the new unit into the house. If you’re still weighing the wider project, our Home Additions & ADU service lays out the full scope, and you can see everything we cover across Hialeah.

Written by the team at Groundwork Construction Co. of Miami.

Why Hialeah Chooses Groundwork Construction Co. of Miami

We set the standard for garage conversion ADU in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(833) 968-1198

Request a Free Estimate in Hialeah

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch