Vanities, Tile & Fixtures in Pinewood, FL: What the Job Costs and How Long It Runs
Vanities, tile & fixtures in Pinewood usually runs $9,000 – $28,000 for a full bath gut-and-rebuild, and a single vanity-and-tile refresh sits at the bottom of that range. Most jobs take two to four weeks on site, longer if we’re cutting into the concrete block walls common in 33167. Call (833) 968-1198 and we’ll price your actual bathroom, line by line, before anyone touches a tile.
What the Work Looks Like, Stage by Stage
This isn’t a weekend swap. Vanities, tile & fixtures means tearing a bathroom down to studs and slab, then rebuilding it in a fixed order. Here’s the sequence we run, and what you’ll be deciding along the way.
- Day 1 – 2: Demo and discovery. We pull the toilet, vanity, tub, and old tile, then open the wall behind the shower valve. In mid-century Pinewood homes this is where the surprises live – a rusted galvanized stub-out or a valve that’s been weeping into the block for years. You approve any add before we go further, in writing.
- Day 2 – 4: Rough-in and rough inspection. New drain and supply lines if we’re moving the vanity or shower head, new electrical for the GFCI circuit and lighting, and the exhaust fan ducted outside. Miami-Dade requires a rough plumbing and electrical inspection before the walls close, and we schedule it, we wait for it, we pass it.
- Day 5 – 6: Backer board and waterproofing. We set cement backer board in the wet areas and apply a bonded waterproof membrane over the shower. This is the stage that decides whether the bathroom lasts twenty years or grows mold in three, and it’s the one most people never see.
- Day 7 – 14: Tile. Floor tile, shower walls, and any accent work. You’ve already picked the tile by now – that decision needs to be locked two weeks before demo so it’s on site when the setter arrives. Large-format porcelain goes down faster than a small mosaic; a herringbone pattern adds two or three days of labor.
- Day 15 – 21: Fixtures, vanity, and final. We set the vanity and top, hang the toilet, install the shower trim and glass, wire the vanity lights, and caulk everything. Final inspection, then a walkthrough with you and a written punch list. Our 730-Day Done Right Promise covers the workmanship from that day forward.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
You’ll pick between a handful of real options on this job. Here’s the honest read on each.
- Vanity: stock vs. semi-custom vs. custom. A stock 48-inch double vanity runs $800 – $1,800 installed and comes in a week. A semi-custom gives you the sink spacing and drawer layout you want for $1,500 – $2,500. Custom millwork climbs past $3,000 but lets you fit an odd alcove in a 1950s Pinewood bath where nothing is square.
- Vanity top: quartz vs. granite vs. porcelain slab. Quartz is the practical pick – non-porous, no sealing, holds up to Miami humidity. Granite is beautiful and cheaper on some slabs but wants resealing every year or two. Porcelain slab is the newest option, thin and stain-proof, but fewer fabricators cut it.
- Floor tile: porcelain vs. ceramic vs. natural stone. Porcelain is denser and handles the humidity better than ceramic. Natural stone (travertine, marble) looks richer but is porous and slippery when wet – a real concern in a bathroom that sees daily showers.
- Shower wall: large-format tile vs. mosaic vs. slab. Large-format (12×24 or bigger) means fewer grout lines to clean and a faster set. Mosaic gives texture and grip underfoot. Slab panels are the premium choice and skip most of the grout entirely.
- Fixtures: brands worth knowing. Delta and American Standard both make durable trim at fair prices; Toto toilets and shower valves cost more but need fewer repairs. We install all three and can quote them side by side.
What Vanities, Tile & Fixtures Costs in Pinewood, FL
Expect $9,000 – $28,000 for a full gut-and-rebuild of vanities, tile & fixtures in Pinewood, with a typical mid-range job landing near $15,000. A smaller bath or a partial refresh lives lower in that band.
| Line item | Typical range |
|---|---|
| Bathroom vanity installation | $800 – $3,000 |
| Shower replacement | $3,000 – $8,500 |
| Tub-to-shower conversion (where applicable) | $3,500 – $10,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Full bathroom remodel (includes fixtures and tile) | $9,000 – $28,000 |
What pushes a job to the high end: relocating the toilet or shower drain (adds rough plumbing and slab work), moving a load-bearing wall, upgrading to custom millwork and slab shower walls, and any permit scope that requires a wind-mitigation plan. What keeps it low: keeping the plumbing where it is, choosing stock vanity and porcelain tile, and skipping the layout changes.
A written estimate from us lists the tile, the vanity, the fixtures, the labor, the permit, and the dumpster fee as separate lines. It does not include the cost of a load-bearing wall relocation or unforeseen rot behind the block – we flag those the moment we find them and you approve before we continue. The number you see is the number you pay, unless you change the scope yourself. Call (833) 968-1198 and we’ll walk your specific bathroom through it.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Do to This Job
Pinewood sits in Miami-Dade’s high-velocity hurricane zone, and 33167 includes blocks near the Little River where the floodplain elevation rules apply. That changes the job in ways most of Florida never deals with. Showers and tubs set into the slab need proper waterproofing and drainage planning. Exterior penetrations for the exhaust fan have to meet the windborne-debris and product-approval requirements under the Florida Building Code. And if we’re adding a window or moving a wall in the bathroom, the opening has to be flashed and structurally solid to that same standard.
The housing stock is the other variable. Homes in Pinewood tend to be 1950s – 60s concrete-block ranch and Miami-modern style with flat or low-slope roofs, alongside 1970s – 80s low-rise apartments and newer infill townhomes. Cutting into solid CMU walls is routine here – it means slower demo and heavier framing work than a wood-frame house upstate. The pine-paneled baths and jalousie windows we open in these homes have usually been sitting in the same humidity for decades, so backer board and mold-resistant assemblies are non-negotiable in any air-conditioned enclosure. Roofs over these interiors often need attention too – homeowners often pair this with Tile Roofing in Pinewood when the bath vent has been leaking for years.
If the bathroom is part of a wider project, it becomes Bathroom Remodeling in Pinewood and we scope the whole thing together. Our Bathroom Remodeling service covers the full trade list, and we cover Pinewood and neighborhoods across 33167.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Pinewood
Most jobs take two to four weeks on site, with tile and waterproofing eating the middle week. Permits and inspections add a few days on the timeline – Miami-Dade runs a rough and a final inspection on a bathroom rebuild. Call (833) 968-1198 and we’ll give you a real calendar date for your job.
Yes if you’re changing plumbing or electrical, adding a shower, or replacing a tub. A cosmetic swap – a vanity on existing water lines and a tile floor over sound substrate – usually doesn’t need a permit. We pull the permit when one is required and we pass the inspection.
Yes, and it saves real money. Keeping the toilet and shower drain where they are, and not relocating a wall, is the biggest single cost lever on the job – often $2,000 – $5,000 of the total. We’ll tell you up front which layout changes are worth it.
A vanity, floor tile, fixtures, and a fresh shower runs $9,000 – $28,000, with mid-range jobs landing near $15,000. Custom millwork or slab shower walls push the high end; stock vanities and porcelain tile keep it toward the bottom. Call (833) 968-1198 for an exact quote on your bathroom.
Every vanities, tile & fixtures job we do is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. Our technicians have up to 12 years of experience, and they’re background-checked and arrive in uniform on every project. Roofing work we do alongside the bath comes with its own wind-rated installation – if the storm has hit, that’s Specialty Roofing in Pinewood territory.
Ready for a Real Number on Your Pinewood Bathroom?
Call (833) 968-1198 for a free on-site estimate on vanities, tile & fixtures in Pinewood. We measure the room, walk the plumbing and electrical, and hand you a line-item written quote – tile, vanity, fixtures, labor, permit, and timeline. No surprises when a live person answers. No change orders unless you change the scope. From foundation to finish line, built to last, backed in writing.
Written by the team at Groundwork Construction Co.