What Does a Garage Conversion ADU in Miami Cost and How Long Does It Take?
A Garage Conversion ADU in Miami typically runs $35,400 – $94,400 and takes about 4 to 7 months from the first hammer swing to the final inspection, depending on whether you’re keeping the existing slab and plumbing wall. The short version: you’re turning an unfinished box into living space, which means insulation, drywall, a real bathroom, a kitchenette, and impact-rated openings. Call (833) 968-1198 for a free on-site estimate with a written line-item quote before anyone touches the space.
How a Garage Conversion ADU Comes Together, Stage by Stage
Most homeowners picture a garage conversion as a weekend-plus-drywall job. It isn’t. Here’s what actually happens, in order, with the decisions that land on you.
Stage 1: Feasibility and design, 2 – 4 weeks. We start by reading the existing garage slab, ceiling height, and the current service panel. That first visit answers the biggest question: can the garage carry the added electrical load and does the slab pitch allow a finished floor without a pour? You’ll decide the layout here, including whether the sleeping area sits against the back wall or the street side, and whether a full kitchen or a kitchenette makes sense. This is also where the building department’s rules on egress, ceiling height, and separation from the main house get locked in.
Stage 2: Permits, 3 – 8 weeks depending on the city. We submit plans and pull the permits. Older Miami garages often have unpermitted prior work attached to them, and anything that doesn’t match the record drawing gets flagged. You’ll sign off on the final plan set; we handle the submittal, the correction cycles, and the inspections.
Stage 3: Demo and rough-in, 2 – 3 weeks. The old garage door opening gets framed and closed, the slab is prepped, and we run electrical, plumbing, and mechanical. This is the messiest stretch and the one where you decide fixture placement, outlet locations, and whether the water heater is a tank or tankless unit. Impact-rated windows and the new entry door get ordered now, because lead times in Miami run long.
Stage 4: Insulation, drywall, and finishes, 4 – 6 weeks. Spray foam or batt insulation goes in, drywall gets hung and finished, then flooring, tile, cabinets, and trim. You’ll pick finishes early enough that they’re on site before this stage closes. This is the point where a homeowner who chose LVP over tile saves two weeks.
Stage 5: Final inspections and punch list, 1 – 2 weeks. Building, electrical, plumbing, and mechanical inspections close out, and we walk the space with you. Everything is covered by our 730-Day Done Right Promise, so if something isn’t right, we come back.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You
Every decision below trades money against durability, and in Miami’s climate the durability question is sharper than it is most places.
- Flooring: Luxury vinyl plank is the fastest and cheapest path, but it’s floating and struggles with slab moisture. Porcelain tile set in thin-set over a Schluter membrane handles humidity and slab movement better and is what we recommend for a garage slab. Expect to spend more and wait longer for tile.
- Bathroom fixtures: A Delta or American Standard shower valve and trim set is the workhorse choice and keeps the budget predictable. Toto toilets cost more but their low-flow performance is worth it in a rental or in-law unit where water bills matter.
- Impact openings: This is not optional in Miami-Dade. The old garage door opening becomes a wall with impact-rated glazing or a solid impact door. A cheap non-rated window will fail inspection and won’t survive a hurricane.
- Kitchenette vs. full kitchen: A sink, two-burner cooktop, and under-counter fridge is a small scope. A full range and vented hood means a real mechanical permit and more electrical.
- Ceiling and insulation: Spray foam costs more than batt and pays for itself in a garage that gets direct afternoon sun.
What a Garage Conversion ADU Costs in Miami, FL
Plan on $35,400 – $94,400 for the conversion itself. That’s the conversion scope; if the project grows into a full Home Additions & ADU in Miami with a separate structure, the number changes entirely. The wide range moves on five variables:
- Size: A single-car garage conversion lands near the low end; a two-car garage that becomes a one-bedroom unit sits closer to $70,000.
- Existing condition: A clean, level slab with an accessible plumbing wall is fast. A cracked, sloping slab needing a new pour or self-leveler adds real money.
- Moving plumbing and electrical: Keeping the bathroom against the existing garage wall saves thousands. Pulling a bathroom to the far corner means trenching the slab and a longer pipe run.
- Finish grade: Builder-grade cabinets and LVP sit at the bottom; custom cabinetry, tile, and a full kitchen sit at the top.
- Permit and code scope: A garage on a 40-year-recertification building, or one with unpermitted past work, adds inspection and correction costs.
A written estimate itemizes framing, electrical, plumbing, mechanical, insulation, drywall, finishes, and permits separately. What it typically excludes: impact window and door products if you’re sourcing your own, landscape repair after trenching, and any structural repair discovered once walls open up. Ask for that list in writing before you compare bids.
See the difference
Before
After
Before
After
Before
AfterWhat Miami’s Housing Stock and Building Rules Do to This Job
Most garage conversions we see in Miami happen in the pre-1970s CBS and concrete-block homes that fill neighborhoods like Little Havana, Allapattah, and Westchester. Those garages were never framed for living space: low ceilings, a slab pitched toward the door, and single-circuit electrical. On the 1920s Mediterranean Revival houses closer to Coral Gables and the Roads, we routinely find unreinforced masonry walls and original flat or low-slope roof framing that needs wind-mitigation upgrades before a conversion passes. In the older stock, termite pressure on any new wood framing is severe, so we use pressure-treated or metal where it makes sense.
The bigger factor is the High Velocity Hurricane Zone. Miami-Dade County is the only place in the US with its own product-approval system, so every window, door, and shutter that goes into this space needs a Miami-Dade NOA number, not just a Florida or national approval. And because Miami-Dade requires 40-year recertification for buildings at 40 years (25 near the coast), many conversions here trigger structural and electrical safety documentation as part of the job. We pull the permits and pass the inspections, and we schedule around those realities rather than discovering them mid-build. If you’re in Brownsville, Miami Springs, or Coral Terrace, the same rules apply and we cover those areas through our Miami service.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Garage Conversion ADUs in Miami
Most conversions run 4 to 7 months from demo to final inspection, with permits eating 3 – 8 weeks of that up front. Impact product lead times add to the schedule, so we order early. Call (833) 968-1198 and we’ll give you a realistic date range for your specific garage.
Yes. A garage conversion in Miami-Dade requires building, electrical, plumbing, and mechanical permits, and the space must meet egress, ceiling-height, and impact-glazing requirements. Unpermitted conversions create problems at resale and with 40-year recertification. We handle the submittal and inspections as part of the scope.
Usually yes, and that’s the cheapest path. Keeping the bathroom against the existing garage wall and staying under the existing ceiling line avoids trenching the slab and adding framing. A layout that works around the existing plumbing wall can save several thousand dollars.
Expect $35,400 – $94,400 for the conversion, with the number landing higher for a two-car garage becoming a one-bedroom unit with a full kitchen and impact openings throughout. Call (833) 968-1198 for a free on-site estimate with a written line-item quote.
Every project we do carries our 730-Day Done Right Promise: if it’s not done right, we make it right. Technicians are background-checked and arrive in uniform, and our technicians have up to 12 years of experience. Calls are answered by a live person 24/7.
Get a Free Garage Conversion ADU Estimate in Miami
If you’ve been weighing a Home Additions & ADU project and a garage conversion is the smartest version for your lot and budget, we’ll come to you, walk the garage, and put a real number in writing. Call (833) 968-1198 for a free on-site estimate. Many homeowners pair the conversion with Cabinets & Countertops in Miami and Backsplash, Tile & Flooring in Miami to finish the space in one stretch.