Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Miami, FL: What the Job Actually Involves
Cabinets and countertops in Miami typically run $16,520 – $53,100 for a full tear-out and replacement, with cabinet installation alone at $4,720 – $15,340 and countertop fabrication at $2,360 – $7,670. Most jobs take 2 to 4 weeks from demo to final caulk, and the calendar is driven less by labor than by fabrication lead times and Miami-Dade inspection scheduling. Call Groundwork Construction Co. at (833) 968-1198 for a free on-site estimate. We’ll measure, walk you through the options, and put a fixed number in writing before anything gets torn out.
How We Run a Cabinet & Countertop Job, Stage by Stage
This isn’t a vague “we handle everything” promise. Here’s the actual sequence, with realistic durations, so you know what day three looks like before you sign anything.
Stage 1: Measure and template (day 1, about 2 hours). We measure every wall, check for out-of-square corners, and photograph the plumbing and electrical rough-in behind the existing boxes. You decide the cabinet layout, door style, and finish at this stage, because those choices lock the order. Anything you want to change after this point costs time, not just money.
Stage 2: Demo and prep (days 2 – 3). Old cabinets, countertops, and backsplash come out. On a CBS block wall – the standard in most pre-1970s Miami homes – we patching and leveling the wall surface before new boxes go up. You decide here whether the old countertop goes to the curb or gets hauled; we include haul-away in the written quote.
Stage 3: Cabinet install (days 3 – 5). Base and wall cabinets are set, shimmed, and anchored to studs or block with the correct fasteners. This is where cheap installs fail: an unlevel countertop line is almost always a cabinet problem, not a countertop problem. You confirm hardware placement and any pull-out or pantry configuration while the boxes are open.
Stage 4: Template and fabrication (5 – 10 business days, the long pole). Once cabinets are set, the countertop gets templated. Stone and quartz fabricators in Miami-Dade run a real backlog. This is the stretch where homeowners get impatient, and it’s the one you can’t compress. You choose edge profile and sink cutout now if you haven’t already.
Stage 5: Countertop set, sink and faucet, final walkthrough (days 1 – 2 once slabs arrive). Slabs go in, undermount sink and faucet get set, seams get color-matched, and we walk the job with you before we call it done. Every stage is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The material decisions drive most of the price spread, so it’s worth knowing the honest trade-offs before a showroom salesperson frames them for you.
- Stock vs. semi-custom cabinets. Stock boxes are the cheapest and fastest to deliver, but they only fit clean, standard layouts. Semi-custom lets you tune widths and depths to odd walls and older Miami rooms that were never square. KraftMaid is our go-to for semi-custom because the finish and hardware program holds up in humidity.
- Plywood vs. particleboard boxes. Plywood is more moisture-tolerant and worth the upgrade in a kitchen that sees daily steam and year-round humidity. Particleboard is fine in dry, well-vented rooms and saves real money.
- Quartz vs. granite vs. laminate counters. Quartz is non-porous and low-maintenance, which suits a busy household. Granite is tougher to stain but needs sealing. Laminate is the budget play and genuinely improved, but it won’t survive a hot pan. Cambria quartz is a solid middle-ground pick for durability and finish consistency.
- Cabinet finish. Thermofoil and painted finishes look sharp but can peel near a dishwasher or range in a humid kitchen. Stained wood and high-pressure laminate faces wear more predictably.
- Sink and faucet. An undermount sink on a solid-surface counter cleans up easier and lasts. Faucet finishes matter in salt air; choose a finish rated for coastal exposure if you’re near the water.
What Cabinets & Countertops Costs in Miami, FL
A cabinet and countertop replacement in Miami runs $16,520 – $53,100 for a full kitchen tear-out, or $4,720 – $15,340 if you’re replacing cabinets alone and keeping the counters. Countertop-only jobs land at $2,360 – $7,670. The variables that push a job toward the top of that range:
- Kitchen size and cabinet count. A galley in Coral Terrace and an open-plan kitchen in Brickell are different animals – cabinet run length is the biggest single lever.
- Layout changes. Moving a sink or range to a new wall means relocating plumbing and electrical, which adds a permit and real trade labor.
- Material grade. Stock cabinets with laminate counters sit at the low end; semi-custom with quartz sits at the high end. The cabinet decision alone can swing the number by $10,000.
- Countertop material and edge profile. Stone slab thickness, edge style, and how many seams a layout needs all move fabrication cost.
- Condition of what’s behind the cabinets. Water damage, failed drywall, or a non-code outlet discovered at demo is a change order in a fair quote and a surprise in a bad one. We inspect before we quote, not after.
Every Groundwork estimate is a written, line-item quote: cabinets, counters, labor, haul-away, and permits broken out. The number you see is the number you pay. And if it’s part of a larger Kitchen Remodeling in Miami project, we scope the whole thing together so cabinets and counters don’t get priced twice.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Homes Specifically Do to This Job
Miami-Dade County is the only place in the US with its own product-approval system – the High Velocity Hurricane Zone – so any structural work that touches the building envelope during a cabinet job (an exterior wall opening, a new impact window) needs a Miami-Dade NOA number, not just a Florida approval. That’s a real permitting reality other cities don’t have, and it changes the inspection timeline. On top of that, the county’s 40-Year Recertification rule (25 years near the coast) drives a wave of inspection and repair work by building age, and we routinely find that a kitchen in an older CBS home has a wind-mitigation or structural item that has to be resolved before new cabinets go in.
The housing stock matters too. Much of Miami’s pre-1970s concrete-block and stucco construction is unreinforced masonry with flat or low-slope roofs, so renovation often triggers upgrades an out-of-state crew won’t expect. Salt-laden coastal air and year-round humidity attack cabinet boxes, drawer glides, and steel fasteners faster than inland, and severe termite pressure on wood framing makes the material choice a durability question, not just an aesthetic one. If you’re weighing a countertop or sink change, homeowners often pair this with Walk-In Showers & Shower Remodeling in Miami when the bathroom is due for the same treatment. Across Miami, we work with whatever the building throws at us, from Brownsville to Coral Gables to Miami Springs.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Miami
Plan on 2 to 4 weeks from demo to final walkthrough, with the longest wait being countertop fabrication. Cabinet install is 2 to 3 days; the countertop template-to-install window is usually 5 to 10 business days. Call (833) 968-1198 for a timeline specific to your kitchen.
Cosmetic replacement generally doesn’t require one, but anything that moves plumbing or electrical, or opens an exterior wall, does – and in Miami-Dade the envelope work carries the stricter HVHZ approval. We pull the permits and pass the inspections as part of the job. Call us to confirm what your specific scope needs.
Yes, most of the time. If your sink and range stay put and the room layout works, we can replace boxes and counters without touching the rough-in. Layout changes are where the cost and the permit work jump.
Full replacement runs $16,520 – $53,100; cabinet-only is $4,720 – $15,340; countertop-only is $2,360 – $7,670. The spread comes down to size, material grade, and whether the layout changes. Call (833) 968-1198 for an exact quote – estimates are free.
Every job we do is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Ask us to put it in writing on your estimate.
Get a Free Cabinets & Countertops Estimate in Miami
Call (833) 968-1198 and we’ll set up a free on-site estimate for your cabinets and countertops in Miami. A real person answers, day or night. We measure, talk through the material trade-offs, check what’s behind the existing boxes, and hand you a written line-item quote – no vague lump sum. If the wider project is bigger than cabinetry, our Kitchen Remodeling team can scope it from foundation to finish line.
Written by the team at Groundwork Construction Co.