Tub-to-Shower Conversion in West Little River, FL: What It Takes and What It Costs
A tub-to-shower conversion in West Little River runs $3,500 to $10,000 for most homes, with a typical 5-by-7-foot hall bathroom landing around $6,200 when the drain stays in place. The work takes 5 to 8 working days: demo and rough-in on days 1 and 2, waterproofing, tile, and glass through day 6, trim and final inspection at the end. Call (833) 968-1198 to schedule a free on-site estimate.
How We Run a Tub-to-Shower Conversion, Start to Finish
A conversion is demolition-first work, and the schedule lives or dies on what we find behind the tub surround. Here’s the sequence we follow on West Little River jobs.
Day 1: Demo and Expose
We pull the tub, surround, and the valve trim, then open the wall around the mixing valve to inspect the rough-in and any hidden water damage. Owners decide on the spot whether a soft spot in the subfloor or a rotted stud gets replaced (typically $150 to $400 added) or flagged for a full reframe. Most demo days end with a broom-clean floor and a loaded dumpster.
Day 2: Rough-In and Pre-Slope
If you’re keeping the tub’s drain location, we reuse the existing drain line and set a sloped mud bed or foam pan. Moving the drain even 12 inches means cutting slab, and that’s the single biggest cost jump in this job. We also confirm the valve is a modern pressure-balance or thermostatic unit; a 1960s two-handle valve usually gets replaced here.
Days 3 and 4: Waterproofing and Tile
We install a bonded sheet or liquid waterproofing membrane over the wet area and run it up the walls to at least 72 inches. Then comes the tile – large-format porcelain goes up fast, mosaics and penny rounds add a day. This is the stage where owners pick grout color, threshold profile, and niche placement, so decide before day 3, not during.
Days 5 and 6: Glass, Fixtures, and Finish
Frameless or semi-frameless glass installs once the mortar cures – usually 24 hours after final grout. We set the showerhead, trim, grab bars if requested, and reinstall the vanity and lighting if they were removed for access.
Day 7: Inspection and Walkthrough
Miami-Dade County inspects the plumbing rough-in before wall close, so we schedule it around day 2 or 3. Final walkthrough is where we test the drain, check for weep leaks, and hand over documentation. Nearly every West Little River conversion finishes in a single continuous block rather than stopping and restarting.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
- Shower base: a prefabricated acrylic or fiberglass pan runs $300 to $900 installed and is quick, but it flexes underfoot and reads builder-grade. A tiled pan with a linear or center drain costs more and takes an extra day, but it’s the option that matches the rest of the house.
- Wall surfaces: large-format porcelain or ceramic tile is the workhorse – forgiving on slope, easy to clean, and available in the neutral palettes that suit most block homes here. Natural stone looks great but needs sealing annually in our humidity.
- Glass enclosure: a framed slider is cheapest. Semi-frameless or frameless glass adds hundreds and defines the look of the room. Skip glass entirely and go with an open walk-in and a floor drain if you want zero cleaning.
- Bench and niche: a built-in bench or recessed niche is a small line item that lifts daily usability more than almost any other upgrade.
- Grab bars and blocking: worth adding blocking during the rough-in stage even if the bars go in later. Retrofitting anchors into finished tile is far harder.
Owners who want the shower to sit inside a larger gut of the room should look at a full Bathroom Remodeling in West Little River rather than treating the conversion as an isolated job.
What Tub-to-Shower Conversion Costs in West Little River, FL
The core range is $3,500 to $10,000. Here’s what separates the two ends.
- Layout changes: keeping the drain in place keeps you near the low end. Moving the drain into the slab pushes $1,500 to $3,000 onto the number.
- Existing condition: hidden rot, failed backer board, or cast-iron drain lines in older homes all add labor.
- Tile and glass grade: the material choice alone can swing the total by $1,000 or more.
- Permit scope: a permit for the plumbing rough-in adds cost but keeps the job legal and insurable – skip it and a future buyer’s inspection will find it.
- Extras: bench, niche, grab bars, and a valve upgrade each add a defined line item.
A written estimate lists demo, haul-away, waterproofing, tile, fixtures, and permit fees separately. What it doesn’t include is structural repair discovered mid-demo, which we price as a written change order before work continues. Upfront pricing means the number you see is the number you pay unless you approve a change.
See the difference
Before
After
Before
After
Before
AfterWhat West Little River Homes Do to This Job
West Little River is unincorporated Miami-Dade, so there’s no city building department – permitting runs through the county’s product-control process, and inspectors expect to see wind-mitigation and code-upgrade details documented even on interior work when the scope touches structure. Most of the housing stock dates to the 1950s through 1970s: concrete block and stucco, terrazzo floors, and hall baths sized around a cast-iron tub. The failure pattern we see most often is exactly what those years produce – a slow leak behind the tub surround, failing backer board, and a drain line that’s been patched more than once. A conversion is the moment to fix all three. South Florida’s rainy season also punishes any waterproofing shortcut, so the membrane work in these rooms isn’t optional. Homes near NW 27th Avenue often have additions or converted carports from earlier decades, which can mean the bathroom walls don’t match the original plan set. When the wider shell needs attention, owners often pair bath work with Metal Roofing in West Little River or Tile Roofing in West Little River.
Serving West Little River, FL – Our Local Coverage Area
We serve West Little River and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in West Little River
Most jobs finish in 5 to 8 working days. Layout changes and moving the drain add two or three days. Call (833) 968-1198 for an exact schedule after we see the bathroom.
Yes whenever plumbing is altered or moved – and Miami-Dade County permits run through the county since West Little River is unincorporated. We pull the permit and schedule the rough-in inspection before the walls close. Call (833) 968-1198 to confirm what your job requires.
In most cases, yes. Keeping the existing drain location means no slab cutting and a shorter schedule. Call (833) 968-1198 and we’ll tell you at the estimate whether your drain can stay.
The range is $3,500 to $10,000, with the low end for a like-for-like swap and the high end for tile work, glass, and layout changes. Call (833) 968-1198 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right. Call (833) 968-1198 to schedule your free estimate.
Get a Free Tub-to-Shower Conversion Estimate in West Little River
Call (833) 968-1198 and a live person answers – any hour, any day. We’ll ask about the bathroom’s age, the tub size, and whether you’re open to moving the drain, then set a free on-site visit. At the visit you get a written line-item estimate, the permit scope spelled out, and a start date. We cover all of West Little River, and our bathroom work sits under our Bathroom Remodeling service.