Tub-to-Shower Conversion in Gladeview, FL: What It Costs and How Long It Takes
A tub-to-shower conversion in Gladeview runs $3,500 to $10,000 for most homes, and a standard conversion takes 5 to 10 working days from demolition to final walkthrough. The job means pulling the tub, reworking the drain and valve to shower configuration, rebuilding the wet wall with waterproofing, setting a new pan and tile, and passing inspection. Call (833) 968-1198 and we’ll put a real number on your Gladeview bathroom after we see it.
How We Run a Tub-to-Shower Conversion, Stage by Stage
This is the part other quotes skip. Here’s exactly what happens, in order, and what you have to decide and when.
Stage 1: On-site measure and written scope (day 0, about an hour)
We pull measurements of the tub alcove, check the valve wall, and look under the floor for the drain run. In Gladeview’s mid-century concrete-block homes this is where we find out whether the existing drain sits where the new pan needs it. You get a line-item quote before anyone swings a hammer, and the number on that page is the number you pay.
Stage 2: Demo and rough-in (days 1 – 2)
The old tub, surround, and any failing backer come out. We open the valve wall and set the new drain and shower valve. If the alcove is a standard 60-inch tub, the new shower pan usually drops in with only a drain reconfiguration, which is the cheaper path. A custom footprint or a shifted drain adds a day.
Stage 3: Waterproofing and backer (days 2 – 3)
This is where a conversion lives or dies in South Florida humidity. We install a bonded waterproofing membrane over cement backer, tape and seal every seam, and pre-slope the pan. Skip this and you get mold behind the tile inside two summers. Nothing gets tiled until the membrane passes our own water test.
Stage 4: Tile, glass, and trim (days 3 – 7)
Wall tile, floor tile, niche, and curb go in. Glass or a curtain rod follows after the mortar cures. This is your longest decision window – tile and fixture selections need to be locked before day 3 or the schedule slips, and we’ll tell you that up front.
Stage 5: Inspection and walkthrough (days 8 – 10)
Miami-Dade County inspection happens on plumbing and electrical changes, then we do a final walkthrough with you: drain flow, door swing, caulk lines, and a written closeout. Your work is covered by the 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the price swing on a Gladeview conversion comes down to these picks. Here’s the honest trade-off on each.
- Prefab pan vs. mud-set tile pan: A prefab acrylic or fiberglass pan is fast, leak-resistant, and lands at the low end. A mud-set tile pan looks custom and matches the floor, but adds labor and a day. For a home you plan to keep, many Gladeview owners pick tile.
- Acrylic surround vs. porcelain or ceramic tile: Acrylic is cheaper and easy to clean, but it yellows under intense Florida UV coming through a skylight or window. Tile holds color and lasts longer; expect the upper half of the range.
- Framed glass vs. frameless: Frameless is the look most people want, and it’s a real cost bump. It also needs more precise wall prep, so it gets priced with the tile.
- Valve and fixture grade: A builder-grade valve works. A pressure-balance or thermostatic valve costs more but protects against the temperature swings common when other fixtures run at the same time. Kohler and similar lines hold up well and parts are available.
- Grab bars and a zero-threshold entry: A curbless or low-curb entry with blocking behind the walls for future grab bars is worth pricing now. Retrofitting blocking later means tearing out tile.
What Tub-to-Shower Conversion Costs in Gladeview, FL
Plan on $3,500 to $10,000 for the conversion itself. That range holds for a standard alcove and moves with the variables below, not with sales pressure. For the wider scope – vanity, flooring, lighting, layout – see our Bathroom Remodeling in Gladeview, which covers the full-room budget of $9,000 to $28,000.
| Line item | Typical range |
|---|---|
| Demo, haul-away, disposal | $400 – $900 |
| Drain and valve rough-in | $600 – $1,800 |
| Waterproofing and backer | $500 – $1,200 |
| Shower pan (prefab or mud-set) | $400 – $1,600 |
| Tile, wall and floor | $1,200 – $3,500 |
| Glass door or enclosure | $500 – $1,800 |
| Permit and inspection | varies with scope |
What pushes a job to the high end: a custom footprint, relocating the drain or valve, moving a wall, adding a window, or a concrete slab that needs cutting. What keeps it low: standard 60-inch alcove, drain stays put, tile surround, framed glass. Every estimate is written line by line with no change orders – the number you see is the number you pay. We also offer 0% financing for 18 months and $1,000 off projects over $10,000.
See the difference
Before
After
Before
After
Before
AfterWhat Gladeview Homes Do to This Job
Gladeview is an unincorporated pocket of Miami-Dade around NW 79th Street in the 33147 ZIP. There’s no city hall here, so permits and inspections go through Miami-Dade County – and the county’s product-approval (NOA) and High-Velocity Hurricane Zone rules apply even to small jobs. That’s different from work in neighboring Hialeah or Miami proper, and it’s why the permit line on your quote is real, not padded.
The housing stock changes the conversion itself. Much of Gladeview is 1940s to 1960s concrete-block and terrazzo, and a lot of it has been expanded over the decades – carports turned into bedrooms, rear add-on units, unpermitted work. That legacy means we do a careful pre-construction survey before demo. We’ve opened tub walls in Gladeview to find plumbing that was never vented to code, and we fix it right because the county inspection will catch it anyway. Our technicians have up to 12 years of experience, and they’re background-checked and uniformed. If you’re also tackling the roof, homeowners often pair this with Tile Roofing in Gladeview or Metal Roofing in Gladeview so the exterior matches the interior work.
Humidity is the quiet factor. South Florida’s summer humidity and the June to November hurricane season mean we spec mold-resistant assemblies and a waterproofing membrane that holds. We cover all of Gladeview, plus nearby West Little River, Pinewood, Westview, and Brownsville – see our Gladeview service area for details.
Serving Gladeview, FL – Our Local Coverage Area
We serve Gladeview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Gladeview
Most Gladeview conversions take 5 to 10 working days from demo to walkthrough. A standard alcove with the drain left in place lands near 5 days; a custom footprint, moved drain, or county inspection adds days. Call (833) 968-1198 for a schedule built around your job.
Yes – if the drain, valve, or electrical changes, Miami-Dade County requires a permit and inspection. Because Gladeview has no city hall, we pull county permits directly. We carry the permit and pass the inspection; that’s part of our Bathroom Remodeling standard, and it protects you at resale.
Often yes – if the tub is a standard 60-inch alcove, the drain usually lines up with a new pan and no structural changes are needed. Custom sizes, drain relocation, or a wall move push the job and the price up. We’ll tell you which one you’re facing at the on-site measure.
The conversion runs $3,500 to $10,000 in Gladeview. A standard alcove with prefab pan and acrylic surround sits at the low end; tile, frameless glass, and custom sizing push it up. Call (833) 968-1198 for an exact quote – estimates are free.
Every tub-to-shower conversion we do is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing before we start.
Get a Free Tub-to-Shower Conversion Estimate in Gladeview
Call (833) 968-1198 for a free on-site estimate on your Gladeview tub-to-shower conversion. A live person answers 24/7, so you won’t sit in voicemail. We’ll measure the alcove, check the drain and valve, and hand you a written line-item price with no surprises. Then you decide, on your schedule.
Written by the team at Groundwork Construction Co. of Miami.