A Groundwork company - serving Miami, FL
Tub-to-Shower Conversion in Miami, FL | Groundwork Construction Co. of Miami

Tub-to-Shower Conversion in Miami - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Tub-to-Shower Conversion in Miami: What It Involves and What It Costs

A tub-to-shower conversion in Miami runs $4,130 to $11,800 and typically takes 5 to 10 working days from demo to final inspection. The job means pulling the old tub, reworking the drain and valve to a shower position, waterproofing the wet area, setting a new shower pan and tile, and closing out the permit. Call (833) 968-1198 to schedule a free on-site estimate – we’ll measure the alcove and give you a written line-item number before anyone swings a hammer.

Call (833) 968-1198

How We Run a Tub-to-Shower Conversion, Stage by Stage

Most homeowners picture a two-day swap. In a Miami-Dade bathroom it’s closer to a week of real work, mostly because waterproofing and inspection can’t be rushed. Here’s the actual order we follow.

Stage 1 – Site check and shut-off (day 1, 2-3 hours). We protect the floors and hallway, shut the water, and confirm what’s behind the tub surround. In CBS block homes we’re often opening a wall that hasn’t been touched since the 1960s, so we check for corrosion on the valve body and any soft framing. You decide then whether to keep the existing valve or upgrade the trim and cartridge.

Stage 2 – Demo and rough-in (days 1-2, 1 to 1.5 days). Tub out, surround out, old drain and overflow removed. The drain gets moved to a centered shower position if your layout needs it, and we set a new pre-slope. This is the stage where surprises cost money – a rotted subfloor under the tub is common in older Miami homes with long-term humidity.

Stage 3 – Waterproofing (days 2-3, about a day). We bond a waterproof membrane to the pan and walls, seal the corners and seams, and flood-test the pan. You pick your tile at this point, or before – it has to be on site for the next stage. Nothing gets tiled until the pan holds water.

Stage 4 – Tile and glass (days 3-6). Wall tile, niche and bench if you want them, then the pan tile and grout. Glass gets templated after tile is set, so expect a small gap of a few days between tile completion and enclosure installation.

Stage 5 – Final inspection and handoff (days 7-10). We walk the inspector through the rough and final stages, then walk you through the finished shower, the caulk schedule, and how to keep the pan drain clear. Everything carries our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change the Job

A tub-to-shower conversion isn’t one product – it’s a stack of decisions, and each one moves cost and long-term performance. Here’s what you’re really picking between:

  • Shower base vs. tiled pan. A factory acrylic base installs faster and costs less, but a tiled mud-set pan looks custom and holds up better in a high-humidity room. Tiled pans need proper slope work, which is where cheap installs fail.
  • Wall material. Cement board with liquid or sheet waterproofing is the standard. Tile-on-drywall shortcuts are a leading cause of the mold we get called to fix.
  • Tile grade. Porcelain and ceramic are the practical choices. Large-format porcelain means fewer grout lines and easier cleaning – grout is where Miami humidity does its worst work over time.
  • Valve and trim. Upgrading from an older two-handle valve to a modern pressure-balance valve is a small material cost and a big safety improvement. We use fixtures from our verified brand partners, including Kohler.
  • Glass enclosure. Frameless glass looks sharper and costs more. Framed glass is sturdier. Either way, it gets templated after tile, not before.
  • Niche, bench, grab bars. Small adds, big daily-use payoff. Grab bars are worth planning for now even if you install them later – blocking has to be in the wall.

What Tub-to-Shower Conversion Costs in Miami, FL

The honest range is $4,130 to $11,800 for a standard alcove conversion. Where you land in that range depends on five things:

  • Size and layout. A standard 60-inch alcove sits at the low end. A larger footprint or a shift to a walk-in layout pushes toward the top.
  • Condition behind the wall. Corroded valves, rotted subfloor, or old galvanized lines add labor and material.
  • Moving plumbing. A centered drain is the biggest single variable. If your tub drain sits at one end and you want it centered, expect rough-in work.
  • Material grade. Acrylic base and standard tile sit low. Tiled pan, large-format porcelain, and premium glass push the number up.
  • Permit scope. A permitted conversion costs more than a handyman cash job – and it’s the only kind we do, because it’s the only kind that protects your resale and your insurance.

A written estimate from us lists demo, rough-in, waterproofing, tile, fixtures, glass, and permit as separate line items so you can see exactly what you’re buying. What’s typically not included: structural repair if we open a wall and find something failed, and any tile or fixture upgrades you add mid-job. We don’t give you a number and then change it – the price you sign is the price you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Homes Specifically Do to This Job

Miami-Dade County is the only place in the US that runs its own product-approval system. Every product that touches the building envelope here needs a Miami-Dade NOA number – the county’s own approval, not just a Florida or national listing. For a bathroom conversion, that matters most with glass, shower door hardware, and any exterior-facing components. We confirm NOA coverage before ordering.

Much of the housing stock in neighborhoods like Little Havana, Coral Way, and Westchester is pre-1970s concrete-block and CBS. Those bathrooms were built with cast-iron or galvanized drains, and by the time we demo we often find a drain line that’s ready to be replaced. In the 1920s Mediterranean Revival and MiMo homes closer to the water, we run into smaller alcoves and older valve bodies that need thoughtful adaptation. And in Brickell and along Biscayne Boulevard, the post-2000 high-rise condos bring their own wrinkle – HOA rules on contractor access, elevator reservations, and protection of common areas. We handle the access logistics and can provide whatever documentation your building requires.

Salt-laden coastal air and year-round humidity mean grout, sealant, and shower hardware all degrade faster here than in drier climates. We spec materials with that in mind and build in a maintenance schedule that matches. If your project grows into a wider scope, our Bathroom Remodeling in Miami page covers the full-room side, and homeowners often pair a bathroom refresh with Tile Roofing in Miami when the same permit cycle covers exterior work.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Tub-to-Shower Conversion in Miami

Get a Free Estimate on Your Tub-to-Shower Conversion

We’ll come to your Miami home, measure the alcove, check the drain and valve, and walk you through the options with real numbers. You’ll get a written line-item estimate, an honest timeline, and a clear answer on whether a permit is needed. Calls are answered by a live person 24/7, and projects over $10,000 qualify for $1,000 off with 0% financing for 18 months. Call (833) 968-1198 – estimates are free.

Written by the team at Groundwork Construction Co.

Why Miami Chooses Groundwork Construction Co. of Miami

We set the standard for tub-to-shower conversion in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your tub-to-shower conversion project started is simple.

1

Call or Request a Free Estimate

Tell us about your tub-to-shower conversion project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local tub-to-shower conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Tub-to-Shower Conversion in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 968-1198

Request a Free Estimate in Miami

Tell us about your tub-to-shower conversion needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch