A Groundwork company - serving Miami, FL
ADU Design & Permitting in Miami, FL | Groundwork Construction Co. of Miami

ADU Design & Permitting in Miami - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Miami, FL: What the Process Actually Costs and How Long It Takes

ADU design and permitting in Miami, FL typically runs $53,100 – $153,400 for the design-through-permit stage, with plan approval from the City of Miami and Miami-Dade County taking 8 to 16 weeks on a clean submittal. Design takes 3 to 6 weeks before that clock starts. Call (833) 968-1198 and we’ll walk your property through the real sequence, no obligation.

Call (833) 968-1198

What most homeowners don’t realize is that in Miami the permit file is half the build. Miami-Dade County runs the only product-approval system of its kind in the country: every window, door, roof assembly and shutter on your ADU needs its own Miami-Dade NOA number, not a Florida statewide approval. That single fact reshapes design decisions before a single line is drawn.

How ADU Design & Permitting Works, Stage by Stage

Here’s the honest sequence we follow on every ADU in Miami, with real durations attached.

Stage 1 – Site survey and feasibility (week 1)

We measure the lot, pull the property’s flood zone designation (VE or AE), check setback and lot-coverage limits against current zoning, and confirm whether the parcel sits in the 25-year or 40-year recertification window. You decide at this stage: attached, detached, or garage conversion footprint. This is where you learn whether your lot can carry the ADU at all. Roughly 1 in 5 Miami lots we survey needs a variance, and we tell you before you spend design money.

Stage 2 – Schematic design (weeks 2 through 4)

We produce floor plans, elevations and a site plan showing the ADU in context. You approve the layout, ceiling height, kitchen and bath placement, and the window schedule. The window schedule matters more in Miami than anywhere else: pick the products here and we confirm NOA numbers in the same pass. You’ll also sign off on whether the ADU meets the accessibility and parking conditions the city may attach.

Stage 3 – Construction documents (weeks 4 through 7)

Structural, electrical, plumbing and mechanical drawings get produced and sealed. Wind-load calcs, tie-down details and the impact-protection schedule go into the package here. You decide on wall assembly (CBS block vs. wood frame), roofing type, and window and door brand at this point. This is the stage where a Boral or PGT product selection gets locked in because the NOA must appear on the drawings.

Stage 4 – Permit submittal and review (weeks 7 through 20)

We submit to the City of Miami building department, route through Miami-Dade County for product compliance, and respond to plan-review comments. Reviewers commonly issue 2 to 4 rounds of comments on a first ADU submittal. We handle every round. You decide nothing during this stretch except how to respond if a reviewer asks for a design change, and we bring you the options in plain language.

Stage 5 – Permit issuance and construction handoff (final 2 weeks)

The permit is issued, contractor and subcontractor registrations filed, and the inspection schedule set. You get a stamped plan set and a written scope. From here the ADU moves into construction, which is where people often pair it with a Full Kitchen Remodeling in Miami for the main house while trades are already on site.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Spec Choices You’ll Actually Make

ADU design and permitting decisions in Miami come down to a short list of forks in the road. Each one moves the price and each one has a real trade-off.

  • Structure: CBS block vs. wood frame. Concrete block and stucco holds up to salt air and termite pressure far better, and it’s the default for the pre-1970s stock around Miami. Wood frame costs less up front, builds faster, but wood framing in this climate faces severe termite pressure and needs treated lumber and careful moisture detailing. Most of our ADU buyers go block.
  • Impact glazing: fixed vs. roll-down shutters. Impact glass with a valid Miami-Dade NOA lets you skip shutters entirely and is the cleaner answer. Roll-down shutters carry a lower unit cost but add maintenance and need their own NOA. For a small ADU, impact glass usually wins on total cost once you count shutter hardware and labor.
  • Roofing: standing-seam metal vs. shingle vs. tile. Metal and tile hold their finish longer against intense sun and salt air; asphalt shingle costs least up front but degrades fastest under Miami sun and rain.
  • Window and door brands. Impact-rated product lines from PGT and CGI are common on Miami ADUs and both publish NOA numbers per model, which is what the permit reviewer checks. Cheaper lines sometimes lack the specific NOA for your configuration and force a redesign late.
  • Ceiling height and SFR vs. attached configuration. Higher ceilings feel bigger but cost more in framing and wind-load engineering. Attached ADUs share a wall and win on cost; detached ADUs win on privacy and rental flexibility.
  • Kitchen and bath spec level. A code-minimum ADU kitchen and a rental-grade one cost meaningfully different amounts. We tell you straight which finishes survive a tenant and which don’t.

What ADU Design & Permitting Costs in Miami, FL

Design and permitting for an ADU in Miami runs $53,100 – $153,400. That’s the full package: survey, architectural drawings, structural and MEP engineering, wind-load and NOA documentation, submittal, and every plan-review round until the permit issues.

What pushes a job toward the low end versus the high end:

  • ADU footprint and configuration. A compact attached ADU with a simple rectangle sits at the low end; a detached two-bedroom with an irregular footprint climbs fast.
  • Existing site conditions. A lot already surveyed with clean setbacks and existing utility capacity is cheap. A lot needing a variance, a survey, or utility upgrades adds cost before design begins.
  • Whether you’re relocating or extending utilities. New electrical service, a new water and sewer lateral, or a transformer upgrade all show up in the design and permitting package.
  • Material and system selections. Impact glass, metal roofing and stone or tile exteriors raise the engineering and NOA documentation burden. Each product needs matching paperwork; each missing NOA is a review cycle.
  • Permit scope. Flood-zone elevation certificates, structural upgrades triggered by existing code, and demolition permits for a garage conversion all add line items.

A written Groundwork estimate breaks these out line by line: survey, design phase by phase, engineering, plan review, permit fees, and a stated number of review rounds included. What typically isn’t in a design-and-permitting estimate: actual construction labor and materials, impact-fee assessments billed separately by the county, and any HOA or architectural review fees your community may charge.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Homes Specifically Do to This Job

Miami isn’t like permitting anywhere else in the state, and the design work has to reflect that from day one. Miami-Dade County runs the only local product-approval system in the US: every window, door, roof assembly and shutter must carry a Miami-Dade NOA number, which means the design phase can’t hand-wave material choices. Combined with the 40-Year Recertification law (and 25-year for buildings near the coast), an ADU project on an older parcel frequently triggers structural and electrical inspections on the main house that homeowners didn’t budget for.

The stock matters too. Much of the pre-1970s housing in neighborhoods like Little Havana, Coconut Grove and the streets off Biscayne Boulevard is unreinforced concrete-block and CBS with flat or low-slope roofs, so adding an ADU often means wind-mitigation upgrades to the existing structure before the county will sign off. In Brickell and along the high-rise corridor the story is different: HOA and condo-association architectural review adds a layer the city permit doesn’t cover. Salt-laden air and year-round humidity also degrade sealants and exterior finishes fast, so we spec for that in the drawing stage, not after. Homeowners frequently pair this with Cabinets & Countertops in Miami when the ADU is being readied for a tenant.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Design & Permitting in Miami

Get a Free On-Site ADU Design & Permitting Estimate in Miami

We start with a free on-site estimate and design consult: we walk the lot, confirm your flood zone and setbacks, check the recertification window on your existing structure, and tell you what’s realistic. You’ll get a written, line-item estimate for the design and permitting package before you commit to anything, with 0% financing for 18 months available and $1,000 off projects over $10,000. Call (833) 968-1198 today.

Written by the team at Groundwork Construction Co.

Why Miami Chooses Groundwork Construction Co. of Miami

We set the standard for ADU design & permitting in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Design & Permitting in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 968-1198

Request a Free Estimate in Miami

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch