Replacing a vanity, tiling a floor or shower surround, and swapping fixtures in a Coral Gables bathroom usually runs $9,000 – $28,000, and most of these projects finish in one to two weeks once materials are on site. A vanity-only change can land near $800 – $3,000, while full tile and fixture work with plumbing moves climbs toward the top of that range. Call (833) 968-1198 for a free on-site estimate before you commit to anything.
How We Run a Vanities, Tile & Fixtures Job, Start to Finish
This is not a full bathroom remodel, and we don’t run it like one. The scope is the surfaces and the fittings: the vanity and its top, the floor and wall tile, and the faucets, drains, and trim that go back in. Here’s the actual sequence we follow, and where you make decisions.
Day 1: Protection, demo, and shutoff
We mask the hallway and any adjacent rooms, shut the water at the fixture stops, and pull the old vanity, toilet (if it’s coming out for floor tile), and any existing tile that’s failing. Demo of a standard 5×8 bath takes about half a day. You’ll have already signed off on the layout drawing and picked your tile and vanity at this point; nothing gets torn out until the material is ordered and confirmed in stock. If you’re deciding between a floating vanity and a freestanding one, that call has to happen now, because it changes the rough-in height and blocking.
Day 2: Substrate, waterproofing, and rough-in
This is the day that separates a tile job that lasts from one that fails in three years. We level or replace the subfloor, set a cement backer or foam board, and roll on a waterproof membrane in wet areas. Schluter’s Kerdi system is what we default to in shower surrounds and behind tile that meets a tub deck, because it handles the movement and moisture that South Florida bathrooms throw at it. If your vanity is moving or a sink is relocating, the plumber roughs in the new supply and drain lines here, and any electrical for a lit mirror or GFCI outlet gets done the same day. You’ll want to have picked your faucet height and mirror size before this stage, since it determines blocking placement.
Days 3 – 5: Tile setting
Wall tile goes up first, then floor. A 5×8 floor in large-format porcelain sets in a day; a herringbone marble mosaic in a 10×12 primary bath takes three. We check layout against the room’s centerlines so cuts land on the edges, not in the middle of the visual field. Grout goes in 24 hours after the last tile, and you’ll pick grout color before the set begins, not after. This is the stage where a homeowner walks in and either loves it or wants something changed, so we set up a checkpoint at the end of day one of tile and walk it with you.
Days 6 – 8: Vanity set, fixtures, and trim
The vanity gets set and shimmed level, the top goes on (we template stone tops, so add 3 – 5 business days if you’re going with a natural stone or quartz counter rather than a pre-fab top), and the sinks and faucets get installed. Delta and American Standard are the two lines we install most often here; both have parts availability locally, which matters when a cartridge fails two years from now. Toilet reset, shower trim, towel bars, and the mirror go in on the last day.
Final day: Punch walk and sign-off
We caulk every wet joint, run the water, check for leaks under the vanity and at the shower valve, and walk the room with you line by line against the original scope. Nothing gets invoiced as complete until you’ve signed that walk. Our 730-Day Done Right Promise covers the workmanship on everything we set, and we put it in writing on the estimate.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Be Choosing Between
Most of the decisions that drive cost and longevity on this job come down to a handful of choices. Here’s the honest trade-off on each.
- Vanity type: A freestanding furniture-style vanity ($800 – $1,800 installed) suits a period Coral Gables home and is easy to replace later. A built-in with a furniture-grade cabinet runs $1,500 – $3,000 and gives you more storage and a cleaner tile-to-cabinet transition.
- Vanity top material: Quartz is the practical default, no sealing, uniform look. Natural marble looks right in a Mediterranean Revival bath but etches with toothpaste and needs sealing yearly. Pre-fab tops save $400 – $900 over templated stone.
- Floor tile: Large-format porcelain (12×24 or bigger) is fast to set and easy to keep clean. Period-appropriate hexagonal or basketweave mosaic tile suits a 1920s bath but costs more in labor because of the cut count.
- Wall tile and shower surround: Full-height tile to the ceiling reads more finished and protects the wall from splash. Subway tile is cost-effective; a slab or large-format panel is faster to install but requires precise wall prep.
- Faucets and fixtures: Delta and American Standard offer the best local parts availability. Toto toilets are worth the premium if water efficiency and a quieter flush matter to you. Off-brand imports save money up front and cost you in replacement parts.
- Waterproofing: Schluter or a comparable bonded membrane behind wet-area tile is not optional in our book. Skipping it saves a few hundred dollars and is the single most common cause of a tile job failing early.
What Vanities, Tile & Fixtures Costs in Coral Gables, FL
Expect $9,000 – $28,000 for a full vanity, tile, and fixture package in Coral Gables. The table below is our standard range, calibrated to what these jobs actually cost here.
| Item | Typical Range |
|---|---|
| Bathroom Vanity Installation | $800 – $3,000 |
| Floor and wall tile (materials and labor) | $2,500 – $9,000 |
| Fixture package (faucets, shower trim, drain) | $600 – $2,200 |
| Waterproofing and substrate prep | $600 – $1,800 |
| Rough-in plumbing or electrical relocation (if needed) | $700 – $2,500 |
| Full package as part of a wider remodel | $9,000 – $28,000 |
Five things push a job toward the top of that range: the size of the room and how much tile is required; the condition of what’s behind the old tile (rotted backer board, cast-iron drain lines, missing blocking all cost money to correct); whether plumbing or electrical has to move; the grade of tile and stone you choose; and whether a permit is pulled, which in Coral Gables it often is for plumbing relocations. Your written estimate will be line-item, and the number on that sheet is the number you pay unless the scope changes in writing. Our 0% financing for 18 months and $1,000 off projects over $10,000 both apply here.
See the difference
Before
After
Before
After
Before
AfterWhat Coral Gables Homes Specifically Do to This Job
The building stock here changes the plan. A 1920s Mediterranean Revival villa off Alhambra Circle or a Mission-style home near the Granada entrance often has coral rock (oolitic limestone) exterior walls and terracotta or plaster interior surfaces, and that means two things for a vanity and tile job: block or masonry anchors rather than wood studs, and the likely possibility that a wall you open up to relocate a faucet reveals an uneven plaster surface that needs float before tile will set flat. We budget for that contingency in the estimate rather than surprising you mid-job.
Coral Gables is also one of the most regulated cities in the country for exterior work. The Board of Architects reviews not only new construction but exterior alterations and even paint colors under the Mediterranean Revival design standards. That rarely governs a bathroom interior, but it does matter when the job includes a new window, a relocated exterior vent, or anything visible from the street, and it’s one of several reasons a Coral Gables project runs on a different schedule than the same job in South Miami or Coral Terrace. Plan for design-review approval cycles on any scope with an exterior footprint. The subtropical climate matters inside too: hurricane season and the humidity cycles typical of South Florida cause caulk failures, grout cracking, and mold behind poorly waterproofed tile, so the waterproofing stage above is where we spend our time, not where we cut. And if the project grows into something larger – a full bath or a roof that needs attention – we cover those too through Bathroom Remodeling in Coral Gables and Tile Roofing in Coral Gables.
Serving Coral Gables, FL – Our Local Coverage Area
We serve Coral Gables and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Coral Gables
A typical bathroom takes 8 – 14 working days from demo to punch walk, and another 3 – 5 days if a templated stone top is involved. Tile setting is the longest stage. Call (833) 968-1198 and we’ll give you a stage-by-stage calendar with the estimate.
Cosmetic tile replacement and a vanity swap in the same spot typically don’t require a permit; relocating a plumbing line or moving a drain does, and so does any electrical relocation for a new outlet or lit mirror. We pull the permit and handle the inspection when it applies. Call (833) 968-1198 to talk through your specific scope.
Yes, and most Coral Gables jobs stay in that lane. Keeping the vanity footprint and drain location intact holds the project at the lower end of the range. Moving a sink or adding a shower valve adds plumbing rough-in and inspection time. The estimate will spell out which scope you’re in.
Most jobs land between $9,000 and $28,000 depending on room size, tile grade, and whether plumbing moves. A vanity-only change is $800 – $3,000. Call (833) 968-1198 for an exact quote – the estimate is free and line-item.
Our 730-Day Done Right Promise covers workmanship for two full years – if something we set fails, we make it right. Product warranties come from the manufacturer (Delta, American Standard, Toto, and Schluter all carry standard coverage). Both are documented on your estimate.
Get a Free Estimate for Your Coral Gables Bathroom
If you’re ready to price out new vanities, tile, or fixtures in Coral Gables, call (833) 968-1198. A live person answers around the clock, and we’ll schedule an on-site visit at a time that works for you. On the call we’ll ask the room size, what you want to keep, and whether plumbing is moving, so the estimator shows up already prepared. That visit produces a written, line-item quote – the number you see is the number you pay, backed by our 730-Day Done Right Promise. If the project grows into a wider scope, our Bathroom Remodeling team and our work across Coral Gables are already in place to handle it. Homeowners often pair this job with Specialty Roofing in Coral Gables when ventilation or skylight work comes up.