Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in South Miami, FL: What It Costs and How Long It Takes
Vanities, tile & fixtures in South Miami runs $10,620 to $33,040 for a full bathroom rebuild of the wet wall, floor, and finish package, and most homes land in the middle of that band. A vanity-only swap is far smaller, $945 to $3,540. The full job usually takes eight to fifteen working days once materials are on site. Call (833) 968-1198 for a free on-site estimate.
How Vanities, Tile & Fixtures Get Installed: Day by Day
The sequence matters more than the sales pitch. Here’s the real order of work on a South Miami bathroom, and where you have to make decisions.
Stage 1: Demo and rough-in (days 1 – 3)
We pull the old vanity, tile, and fixtures back to the studs and subfloor. If the valve bodies or drain lines are going to move, your plumber relocates them now, before any board goes down. This is where you sign off on final vanity width, mirror height, and fixture centers so the blocking is cut correctly. Nothing gets closed up until that’s mapped.
Stage 2: Substrate and waterproofing (days 4 – 6)
We install cement backer board and a bonded waterproof membrane on the shower walls and floor. A flood test on the shower pan runs overnight. On a South Miami CBS-block bathroom we also correct the framing that forty years of humidity has softened, and level the floor so the tile doesn’t telegraph the old slope. The tile layout and grout choice get locked in here, because that order leads time.
Stage 3: Tile setting (days 7 – 10)
Floor tile, wall tile, then niche and trim pieces. Large-format 24×48 porcelain goes down faster per square foot than a hand-set mosaic, but it needs a flatter substrate. Small hex or subway sits over a wider margin of tolerance. Grout goes in after the thinset cures, and you’ll pick grout color, sealer type, and whether you want a matching or contrasting grout line before this stage opens.
Stage 4: Vanity and fixture set (days 11 – 13)
The vanity cabinet gets set and shimmed, the countertop templated or set if it’s a stock top, and faucets, shower trim, toilet, mirror, and lighting installed. If the vanity is a natural stone top, expect a several-day gap between template and install. That’s the one stage most likely to push the schedule.
Stage 5: Final walk and punch (days 14 – 15)
We silicone every joint, seal grout, test every supply and drain, and walk the room with you. Anything on the punch list gets handled before we call the job done. That final walk is also when the 730-Day Done Right Promise gets explained in writing: if the workmanship fails, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
The finish package is where most of the price lives, so it helps to know what each choice buys you.
- Vanity cabinet grade. A stock plywood-and-MDF cabinet holds up fine, but in South Miami’s year-round humidity a solid-wood or marine-grade plywood box resists swelling at the toe kick and door edges. It costs more and lasts longer.
- Countertop. Quartz (a name like Cambria is a good reference for the grade) is the practical default here: no sealing, no porosity, and it holds up to daily bathroom traffic. Marble looks better and stains more.
- Floor tile. Porcelain is the workhorse. Small-format mosaic gives grip on a sloped shower floor; large-format porcelain reads cleaner on the main floor but needs a flat substrate.
- Wall tile. Ceramic is budget-friendly. Porcelain is denser and takes a harder hit. Natural stone needs sealing every year or two.
- Fixtures. Kohler and similar brands hold up on the valve and finish; builder-grade chrome is the cheapest and flakes first.
- Grout and membrane. Epoxy grout resists staining and mildew, at a premium. A roll-on or sheet waterproofing membrane behind the tile is non-negotiable, not an upgrade.
What Vanities, Tile & Fixtures Costs in South Miami, FL
The lead range for the wet wall and finish package in South Miami is $10,620 to $33,040. Here’s the line-item breakdown, and what pushes a job toward either end.
| Line item | Price range |
|---|---|
| Bathroom vanity installation | $945 – $3,540 |
| Full tile & fixture package (wet wall, floor, finish) | $10,620 – $33,040 |
| Small bathroom (compact footprint) | $5,900 – $14,160 |
What moves the number: the square footage of the floor and walls; whether plumbing, electrical, or framing has to move; the tile grade and whether you choose large-format porcelain versus mosaic; whether the vanity top is a stock slab or a templated natural stone; and the permit scope. A straight finish swap sits at the low end. Moving the drain, adding a niche, and going with a templated stone top can push it toward the high end.
A written estimate from us lists tile, setting materials, fixtures, labor, and permit fees line by line. What it doesn’t cover, and we’ll tell you upfront, is unexpected rot behind a wall or a slab crack that wasn’t visible on the initial walk. If that shows up, it becomes a change order with your sign-off before anyone picks up a tool.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami Homes Specifically Do to This Job
Most of the bathrooms we work on in South Miami sit inside 1940s to 1960s concrete-block and CBS homes, often with the original South Miami terrazzo floors still under the tile. That build era changes the work. The walls are block, not stud, so every valve relocation and every fixture rough-in costs more time and needs precise cutting. The floor framing has usually taken on water at some point, so it needs leveling before any tile goes down. And because the homes are on modest lots inside a small city with its own building department, permits run through the city rather than Miami-Dade County, which means a tighter review on inspection scheduling and sequence. We often find the same failure point: a vanity sitting on a rotted subfloor from twenty years of a slow supply drip, or grout and caulk that let humidity into the wall behind the tile. Every project is covered by the 730-Day Done Right Promise, so if the finish fails, we make it right.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Vanities, Tile & Fixtures in South Miami
A full finish package takes about eight to fifteen working days once materials are on site, with the schedule stretching for templated stone tops or tile that has to be ordered. The schedule is driven by waterproofing flood tests, thinset cure times, and grout. Call (833) 968-1198 and we’ll walk you through the timeline for your specific room.
Yes if you’re moving plumbing or electrical, and often yes if you’re changing the wet wall layout; a simple finish swap of tile and vanity in the same footprint may not require one. South Miami’s own building department reviews this, not the county, so the answer depends on the scope. Call us and we’ll tell you before we write the estimate.
Absolutely, and most of our South Miami jobs do exactly that. Keeping the toilet, shower drain, and vanity supply lines where they are cuts cost and avoids the longest part of the schedule. You still get new tile, a new vanity, and all new fixtures; you just don’t pay for relocation.
Expect $10,620 to $33,040 for a full tile and fixture package, or $945 to $3,540 for a vanity-only installation. The number depends on square footage, tile grade, and whether plumbing moves. Call (833) 968-1198 for an exact quote; estimates are free.
Every job is backed by the 730-Day Done Right Promise: if the workmanship fails, we come back and fix it. That’s one of the longest written workmanship guarantees in residential construction, and it’s in writing before we start. Call (833) 968-1198 to schedule your free estimate.
Get a Free Estimate for Vanities, Tile & Fixtures in South Miami
Walk us through your bathroom on a free on-site visit and we’ll give you an upfront, written, line-item estimate for vanities, tile & fixtures in South Miami, with no surprises after the number is agreed. A live person answers (833) 968-1198 around the clock, and our technicians arrive background-checked and in uniform. If the bathroom is part of a larger Bathroom Remodeling in South Miami plan, we’ll scope that too.
Written by the team at Groundwork Construction Co.