Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Hialeah: What the Job Costs and How Long It Takes
Vanities, tile, and fixtures in Hialeah typically run $9,000 to $28,000 for a full bathroom’s worth of work, and a realistic timeline is three to five weeks from demo to final grout. The number moves most on tile selection and whether we’re relocating the plumbing for the vanity or keeping the existing rough-in. Finishes and fixtures alone (vanity, sink, faucet, toilet, tile) usually land between $4,000 and $9,000 of that total, with labor and prep making up the rest. Call (833) 968-1198 and we’ll walk your bathroom and put real numbers on paper.
Key takeaways:
- Full vanities, tile, and fixtures scope: $9,000 – $28,000 in Hialeah.
- Vanity installation alone: $800 – $3,000. Walk-in shower tile and glass, when it’s part of the package: $4,500 and up.
- Most jobs need a permit, and Hialeah inspections happen at rough-in and final.
- Tile and waterproofing are the parts that fail first in South Florida humidity.
How we run a vanities, tile, and fixtures job, stage by stage
We don’t treat this as one blur of a project. There’s a sequence, and knowing it keeps you from making expensive decisions late.
Stage 1: Walkthrough and written scope (day 1, about 90 minutes)
We measure the room, check the existing plumbing and electrical, and photograph what’s behind the vanity and under the floor if we can get to it. You get a line-item estimate: demo, rough-in changes, backer board and waterproofing, tile, vanity, fixtures, trim. If your home is one of the many mid-century block houses in Hialeah with a converted garage or a rear addition, we also check whether the bathroom you’re remodeling was permitted originally. That single question changes the scope more often than any design choice.
Stage 2: Demo and rough-in (days 2 – 4)
We pull the old vanity, toilet, and tile down to the studs and subfloor. This is when surprises show up: rotted subfloor near the tub, a drain line that was never vented correctly, or a wall that isn’t where the drawings said. If we’re moving the vanity or adding a second sink, the plumber and electrician rough in now. You decide at this stage whether to relocate the vanity, add an outlet for a lighted mirror, or keep everything where it sits to save money.
Stage 3: Waterproofing and substrate (days 4 – 6)
This is the stage homeowners never see and the one that determines whether the job lasts. We install cement backer board and a bonded waterproofing membrane (Schluter systems are what we use most) in the wet areas, then flood-test the shower pan if there is one. Hialeah’s year-round humidity punishes shortcuts here harder than dry climates do. You don’t have to decide anything at this stage – we just need access to the room.
Stage 4: Tile setting and grouting (days 7 – 14)
Floor tile, wall tile, shower tile, grout, and caulk at every change of plane. Large-format tile (24×24 or larger) looks clean in a small Hialeah bathroom but demands a flatter substrate, so it costs more in prep. Subway tile and 12×24 porcelain are the workhorses. You lock in your tile selection by day 5 so we don’t stall the schedule.
Stage 5: Vanity, fixtures, and final walkthrough (days 15 – 21)
Vanity set and leveled, countertop and sink installed, faucet and drain connected, toilet set, mirror and accessories hung, caulk and paint touch-ups. Then the inspection and a walkthrough where you test every fixture with us in the room. Most Hialeah jobs land in that three-to-five-week window; larger rooms or heavy plumbing relocation push toward five.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
Here’s where your money actually goes, and what each choice buys you.
- Vanity type: A freestanding stock vanity ($800 – $1,800) is the fastest and cheapest path. A semi-custom or custom built-in ($2,000 – $3,000) lets you fit an odd alcove, which matters in older Hialeah homes where walls are rarely square.
- Vanity top: Cultured marble is budget-friendly and easy to clean. Quartz holds up better to heat and staining and looks sharper, but costs more. Porcelain and ceramic tops sit in between.
- Floor tile: Porcelain is the default for wet rooms: dense, water-resistant, and available in wood-look planks. Natural stone (travertine, marble) looks richer but needs sealing and doesn’t love Hialeah’s humidity.
- Shower wall tile: Ceramic and porcelain are low-maintenance. If you want a glass-enclosed shower tiled to the ceiling, expect a larger tile and waterproofing line item.
- Fixtures: Delta and American Standard cover the reliable middle ground; Toto sits at the premium end for toilets and sinks. A $300 toilet and a $900 toilet both flush; the difference is seat height, finish durability, and water use.
- Grout and trim: Epoxy grout resists staining and mildew far better than cement grout in a humid bathroom. It’s a small upcharge that pays off.
What vanities, tile, and fixtures cost in Hialeah, FL
Budget $9,000 to $28,000 for the full scope. Here’s how the line items break down:
| Line item | Typical Hialeah range |
|---|---|
| Bathroom vanity installation | $800 – $3,000 |
| Floor and wall tile (material and labor) | $2,500 – $7,000 |
| Waterproofing and substrate | $600 – $1,800 |
| Fixtures (faucet, toilet, sink, accessories) | $800 – $3,000 |
| Plumbing or electrical relocation | $500 – $2,500 |
| Demo and disposal | $500 – $1,200 |
| Walk-in shower tile and glass (if included) | $4,500 – $12,000 |
The five things that push a job to the high end: room size and tile square footage, whether we’re moving plumbing or electrical, tile grade (large-format and natural stone cost more in material and labor), whether the existing walls and subfloor are sound or need repair, and permit scope. A cosmetic refresh in a 5×8 hall bath sits near the bottom of the range; a gut renovation with a relocated vanity and a tiled walk-in shower climbs toward $28,000.
Every number we quote is a written, line-item estimate. No change orders unless you approve them in writing first. And because this often runs as part of a bigger project, we fold bathroom scope into our bathroom remodeling work when you want the whole room handled under one contract.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah homes specifically do to this job
Hialeah’s housing stock is mostly 1950s through 1970s single-story concrete-block and stucco homes, many with converted garages, rear additions, and in-law suites added over the decades. That history lands squarely on a bathroom job. Plenty of the bathrooms we open up in the 33010 and 33016 ZIP codes were never permitted, and the plumbing or electrical behind the vanity may not meet current code. When we hit that, it’s not a surprise – it’s a line item we flagged at the estimate. Because so much of the city’s permitting and inspection conversation happens in Spanish, our crews work fluently in both languages, which keeps the inspection schedule from stalling. And the big local one: South Florida’s humidity and summer heat attack tile and waterproofing fast. We build to Miami-Dade wind-borne debris and flood-zone requirements because it’s the standard here, not an add-on.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: vanities, tile, and fixtures in Hialeah
Most jobs take three to five weeks from demo to final walkthrough, with flooring and tile setting eating the middle week and a half. Call (833) 968-1198 for a schedule that fits your room.
Usually yes, if you’re moving plumbing or electrical, replacing a shower pan, or doing work beyond a like-for-like vanity swap. We pull the permits and manage the inspections. Call (833) 968-1198 and we’ll confirm what your project requires.
Yes, and keeping the vanity and drain where they sit is the single biggest way to cut cost. We often save $1,000 to $2,500 by working around the existing rough-in – call (833) 968-1198 to talk through your layout.
Vanity installation runs $800 to $3,000 depending on size, custom vs. stock, and whether the plumbing moves. Call (833) 968-1198 for an exact quote – estimates are free.
Every project is backed by our 730-Day Done Right Promise: if it isn’t done right, we make it right. Call (833) 968-1198 to schedule your free on-site estimate, and we’ll walk you through the full written scope.
Homeowners in Hialeah often pair a bathroom rebuild with exterior work while crews are already on site – Tile Roofing in Hialeah and Specialty Roofing in Hialeah are common companions on older block homes, and it’s worth asking about them if your roof is showing its age.
Get a free estimate for vanities, tile, and fixtures in Hialeah
Call (833) 968-1198 to schedule a free on-site estimate. We’ll measure the room, photograph the plumbing and substrate, and hand you a written line-item quote with real numbers – no vague ballparks, no surprises after demo. We serve the whole of Hialeah across 33016, 33010, 33015, and 33018, and a live person answers the phone 24/7. If you’re weighing a bigger scope, start with Bathroom Remodeling in Hialeah.
Written by the team at Groundwork Construction Co.