Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Miami, FL: What the Job Actually Involves
Vanities, tile & fixtures in Miami, FL covers the finish layer of a bathroom: the vanity cabinet and top, the floor and shower wall tile, and the faucets, drains, trim and lighting that tie it together. A typical scope runs $10,620 to $33,040 depending on tile grade, vanity size and how much plumbing moves. Most jobs take two to four weeks of working days once materials land on site. Call (833) 968-1198 for a free on-site estimate.
How the Job Runs, Stage by Stage
Finish work looks simple from the doorway. It isn’t. Tile setting, vanity fitting and fixture rough-in all depend on each other, and the order matters more than the speed.
Stage 1: Site check and set-out (day 1)
We measure the room, check the floor for level and deflection, and confirm where the drain, supply lines and vanity electrical will sit. You decide the vanity footprint and whether the sink stays where it is. If the tile is going over an existing slab or backer, we pull a small test piece to see what’s underneath.
Stage 2: Demo and prep (days 1 – 3)
Out comes the old vanity, toilet (reset later), old tile and any failing backer board. Floors get flattened and waterproofing goes on in the wet areas. This is the stage where hidden problems show up: soft framing behind tile, a corroded drain, or a slab crack that needs filling before anything gets set. You’ll get a call before we go further if the scope changes.
Stage 3: Tile layout and setting (days 3 – 7)
You approve a layout before the first tile gets set. Full-tile at the door, cuts at the far wall, centered fixtures, grout line width, and whether the floor and shower walls run the same pattern. Setting takes two working days for a standard floor and shower; large-format or mosaic work adds a day. Grout goes in after the thinset cures.
Stage 4: Vanity, top and fixtures (days 7 – 10)
The cabinet gets set and shimmed level, then the top goes on, then the sink and faucet. Electrical trim (GFCI outlet, vanity light, exhaust fan) gets finished here. You pick faucet finish, drain style and mirror placement before this stage starts, because those choices decide the drill points. A live person answers our phones around the clock if a question comes up mid-install.
Stage 5: Final trim, sealant and walkthrough (days 10 – 14)
Caulk lines go in, the toilet gets reset, and we test every drain and supply. Then a walkthrough where you check the grout lines, the door swing, the water pressure at the faucet. Anything on your list we fix before we leave. All of it is covered by the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make Before Work Starts
This is where budgets move. Pick these before demo, not during.
- Vanity type: a stock cabinet runs $300 – $900 and installs fast; a semi-custom from a name brand like KraftMaid costs more but fits an odd wall. Freestanding is easier to set; a floating vanity needs blocking in the wall and usually moves the plumbing.
- Vanity top: quartz and Cambria-style slabs resist Miami humidity and clean up easily, but cost more than cultured marble or a laminate top. Porcelain tops sit between the two on price and durability.
- Floor tile: porcelain is the workhorse here: dense, water-resistant and priced $3 – $9 per square foot. Natural stone (travertine, marble) runs higher, needs sealing, and can stain in a humid bathroom.
- Shower wall tile: large-format 12×24 panels mean fewer grout lines to scrub; mosaic sheets cost more in labor because every small piece gets set by hand.
- Fixtures: Kohler and similar brands give you a reliable cartridge and parts that are easy to source locally. Cheap import faucets fail at the cartridge and the finish flakes in salt air.
- Lighting and exhaust: a properly sized vent fan matters more than a fancy sconce in a Miami bathroom. Skip it and you’ll be fighting mildew on the ceiling within a season.
What Vanities, Tile & Fixtures Costs in Miami, FL
Plan on $10,620 to $33,040 for a full vanity, tile and fixture package in Miami, FL. That range covers the whole finish scope, not one piece of it. Here’s what moves you toward the low or high end:
| Line item | Typical Miami range |
|---|---|
| Bathroom Vanity Installation | $945 – $3,540 |
| Walk-In Shower Installation (tile + pan + glass) | $5,310 – $14,160 |
| Shower Replacement | $3,540 – $10,030 |
| Full Vanities, Tile & Fixtures package | $10,620 – $33,040 |
Five variables push the number:
- Room size: a hall bath at 40 square feet costs far less in tile and labor than a primary bath at 100.
- Existing condition: tile set over failed backer board means full demo and new substrate. That adds days and dollars.
- Plumbing or electrical relocation: moving the drain or vanity outlet means opening walls and pulling a permit. Keep fixtures in place and you save real money.
- Material grade: porcelain versus natural stone, stock vanity versus semi-custom, basic versus designer fixtures.
- Permit scope: tile cosmetic work usually needs none; moving plumbing or electrical does.
Your written estimate lists each line: tile square footage, vanity model, fixture brands, labor and permit fees. It doesn’t cover structural repair found after demo or a change you make mid-job; those get a separate written price before we touch anything. No-hassle upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Homes Specifically Do to This Job
Miami’s building stock changes how finish work gets done. Much of the older housing in neighborhoods like Little Havana, Shenandoah and Allapattah is pre-1970s CBS (concrete block and stucco) with unreinforced masonry walls. That matters here because hanging a heavy floating vanity or large-format tile on a block wall needs different anchors than drywall, and a botched anchor means a crack running down the wall. In Coral Gables and along Biscayne Boulevard, 1920s Mediterranean Revival and MiMo interiors often hide original plumbing that’s past its service life; you find it the day the old vanity comes out.
Salt air and year-round humidity are the other factor. Faucet finishes pit faster, cheap chrome mists over within a couple of seasons, and grout in a shower with no exhaust fan grows mildew on a predictable schedule. We spec sealed grout and a properly sized vent fan on nearly every Miami job for that reason. If your project ties into a wider overhaul, that’s part of a full Bathroom Remodeling in Miami, and our Bathroom Remodeling service covers the framing and rough-in side. We work across Miami, including Brownsville, Coral Terrace and Miami Springs. Homeowners also pair this with Tile Roofing in Miami and Specialty Roofing in Miami when the exterior is due at the same time.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Vanities, Tile & Fixtures in Miami
Two to four weeks of working days for a standard bathroom. Tile setting and cure time drive the schedule; a large-format or mosaic job can stretch an extra week. Call (833) 968-1198 for a timeline tied to your room.
Cosmetic tile and a direct-swap vanity usually need no permit. Moving a drain, supply line or electrical outlet does, and so does any structural change. We pull the permits and pass the inspections. Call us to confirm what your specific job triggers.
Yes, in most cases. Keeping the drain and supply lines where they are, and choosing a vanity that fits the existing wall, cuts cost and time. A floating vanity or a shifted sink is where the walls open up. Call (833) 968-1198 and we’ll tell you which side of that line your room falls on.
The full package runs $10,620 to $33,040, with vanity installation alone at $945 – $3,540. Material grade, room size and whether plumbing moves are the big levers. Call (833) 968-1198 for an exact quote; estimates are free.
Every job is backed by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers our workmanship for two full years, not a 30-day handshake. Call to get the details in writing.
Get a Free Estimate on Vanities, Tile & Fixtures in Miami
Call (833) 968-1198 to schedule a free on-site estimate for vanities, tile & fixtures in Miami, FL. A live person answers around the clock, so you won’t wait until Monday. On the call we book a visit, measure the room, talk through your tile and vanity choices, and hand you a written line-item quote with the price locked in. No surprises, no change-order games. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off.
Written by the team at Groundwork Construction Co.