Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Pinewood, FL: What the Job Actually Involves
A garage conversion ADU in Pinewood, FL typically runs $45,000 – $130,000 and takes 8 to 16 weeks from permit to final inspection. You’re turning an existing attached or detached garage into a legal, rentable or family-ready living unit: new slab or floor system where needed, insulated and finished walls, a bathroom, a kitchenette, dedicated electrical, and a separate entrance. Call (833) 968-1198 to schedule a free on-site estimate. We’ll walk your actual garage and tell you what it will take.
How a Garage Conversion ADU Comes Together, Stage by Stage
Most Pinewood garages we open up are 1950s – 60s concrete block with a flat or low-slope roof, and the conversion sequence below is built around what that construction actually demands. Here’s what happens, in order, and where you make the calls.
Stage 1: Feasibility and permit drawings (weeks 1 – 3)
Day one is measurement and evaluation, not demolition. We check the existing slab for cracks and moisture, verify ceiling height and egress, and confirm whether the garage sits inside a flood zone that affects finished-floor elevation. You decide here whether you want a full kitchen or a kitchenette, one bedroom or an open studio layout, and whether the garage door opening gets framed and stuccoed or kept as a screened flex space. The drawings and permit package get submitted to Miami-Dade County, and this is usually the longest waiting period of the whole job.
Stage 2: Demolition and structural prep (week 4)
Out comes the garage door and opener, the old storage shelving, and any non-structural partitions. In the 33167 ZIP, that often means cutting into solid CMU block for new doorways and window openings, which takes longer than cutting wood-frame walls and requires proper lintels and reinforcement. If the slab has heaved or the existing footings don’t meet current requirements, we address that now rather than after the drywall goes up. You confirm final room dimensions and door swing directions before framing closes.
Stage 3: Rough-in trades and framing (weeks 5 – 8)
We frame interior walls, run the electrical panel and circuits, rough in plumbing for the bathroom and kitchenette, and install HVAC ducting or a mini-split line. Inspections happen in sequence here: framing, then electrical/plumbing/mechanical rough-in, then insulation. This is where hidden costs live, and it’s where an honest estimate separates from a lowball one. Relocating a drain line or upgrading a service panel adds real money and real days. You’ll pick fixture locations and confirm the layout before the walls close.
Stage 4: Insulation, drywall, and finishes (weeks 9 – 12)
The enclosure gets insulated and sealed tight, then drywall, then finish trades: flooring, tile, trim, paint, fixtures, and the kitchenette cabinets and counter. Because Pinewood is subtropical, we spec mold-resistant drywall and build the wall assemblies to manage humidity inside a conditioned space; that’s not optional here, it’s how the unit survives a decade of summer. You finalize paint colors, flooring material, and cabinet style in this window.
Stage 5: Final inspections and handover (weeks 13 – 16)
Final building, electrical, plumbing, and mechanical inspections all get signed off, then we do a full walkthrough with you. You receive the warranty documentation, the permitted-as-built drawings, and a punch list closeout. Throughout every one of these stages, the work is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right, in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Define Your Garage Conversion ADU
Half the cost of a garage conversion ADU is decided in a few specification meetings. Here’s what you’ll be choosing between and the honest trade-offs of each.
- Slab vs. raised floor: If the existing slab is sound and dry, finishing on it is the least expensive path. If it’s cracked or the water table is high, a raised and insulated floor system adds cost but keeps the floor dry and warm. Your site inspection tells you which applies.
- Kitchenette vs. full kitchen: A compact kitchenette with a sink, two-burner cooktop, and under-counter fridge fits tighter space. A full kitchen with range and dishwasher costs more and needs more electrical capacity. Renters and in-laws typically prefer the full kitchen.
- Bathroom configuration: A walk-in shower uses less floor space than a tub and suits a compact ADU; a tub costs more but rents differently in some markets. For a compact ADU we usually recommend a shower.
- HVAC approach: A dedicated mini-split gives independent temperature control and a separate electric meter, which matters if you plan to rent. Extending the main house system is cheaper upfront but ties the ADU’s comfort to the main house.
- Windows and doors: In this high-velocity hurricane zone, openings have to meet windborne-debris and product-approval requirements. We commonly specify impact-rated products from PGT or CGI so you meet code without adding storm shutters. A standard-impact retrofit costs more upfront but closes an inspection faster than a non-rated opening that needs separate protection.
What Garage Conversion ADU Costs in Pinewood, FL
Most garage conversions in Pinewood land between $45,000 and $130,000. The low end of that range is a straightforward studio conversion with the existing slab reused, a shower bath, a kitchenette, and a mini-split. The high end means a full one-bedroom layout, a new raised floor, a full kitchen with upgraded cabinetry, relocated plumbing, a new electric service, and finishes chosen for durability. Five variables drive the number: garage size and ceiling height, the condition of the slab and roof, whether plumbing and electrical have to move or upgrade, the grade of finishes (flooring, tile, cabinets), and permit scope including any flood-zone elevation work. Every written estimate is line-item and fixed: the number you see is the number you pay, and we don’t issue change orders for items that were already in scope.
The estimate covers drawings and permit submission, demolition, framing, rough-in trades, insulation, drywall, finish materials we supply, fixtures, and final inspections. It typically does not cover landscape repair, a separate utility meter installation, or the cost of any structural repair we discover only after opening a wall or slab – we flag those before proceeding, never after. Pairing the conversion with new kitchen surfaces is common; many Pinewood homeowners add Cabinets & Countertops in Pinewood for the ADU kitchenette at the same time.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Specifically Do to This Job
Pinewood sits in Miami-Dade’s high-velocity hurricane zone, so nearly every part of a garage conversion here has to meet windborne-debris and product-approval standards under the Florida Building Code that inland Florida homes never face. That adds specific inspection checkpoints, rated openings, and sometimes a retrofit of the garage’s own roof for wind uplift – all before the ADU is even habitable. Because the 33167 ZIP includes low-lying blocks near the Little River, especially the streets east of Northwest 22nd Avenue, we also plan around flood-zone elevation and storm-water rules that add real cost and sequencing. Concrete-block construction from the 1950s – 60s is the norm in the surrounding blocks near Westview and Gladeview, which means we’re cutting CMU walls and retrofitting old flat or low-slope roofs rather than opening wood framing. The subtropical climate adds one more requirement: mold-resistant assemblies and HVAC sized for a hot, humid summer. All of this is why we treat a Pinewood conversion as a permitting-and-sequencing job as much as a build. We cover Pinewood and the surrounding area through our Pinewood service page; when the conversion grows into a larger scoped project, it’s part of a full Home Additions & ADU in Pinewood.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Pinewood
Plan for 8 to 16 weeks from permit submission to final walkthrough, with the permit review as the biggest single variable. Miami-Dade review and inspection scheduling can add weeks depending on scope and flood-zone requirements. Call (833) 968-1198 for a scheduling estimate based on your specific garage.
Yes. A garage conversion is a habitable-unit change that requires building, electrical, plumbing, and mechanical permits in Miami-Dade County, and in this hurricane zone the openings and roof also have to meet product-approval and wind-uplift standards. We handle the drawing package and pull all required permits; nothing gets built until the permits are issued and inspections are passed at each stage.
Often yes, if the garage sits close enough to existing service lines and the slab and framing are sound. A bathroom and kitchenette need a drain, water, and vent supply; if those are nearby, the cost stays toward the low end of the $45,000 – $130,000 range. If not, relocating plumbing and upgrading the electric service adds cost and time. We confirm this at the feasibility visit, before any estimate is written.
Most jobs land between $45,000 and $130,000. A studio conversion on an existing slab with a shower bath and kitchenette sits near the bottom; a one-bedroom with raised floor, full kitchen, and new service sits near the top. Call (833) 968-1198 for an exact line-item quote – estimates are free and there’s no change-order guessing after the fact.
Every conversion is covered by our 730-Day Done Right Promise: if the workmanship fails within that window, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s stated in writing on the contract. Final walkthrough, permits, and warranty documents all get handed to you at closeout. Homeowners often pair the ADU finish-out with Backsplash, Tile & Flooring in Pinewood so the finish trades run once, not twice.
Schedule Your Free Garage Conversion ADU Estimate in Pinewood
We’ll come to your garage, measure it, check the slab and roof, and tell you what a conversion will realistically cost and how long it will take. The estimate is free and line-item. Our broader Home Additions & ADU work is handled by the same team, so you’re never handed off between contractors. Call (833) 968-1198 to book your visit. A live person answers, any hour.
Written by the team at Groundwork Construction Co.