Cabinets & Countertops in Pinewood, FL: What the Job Really Costs and How Long It Takes
Cabinets & countertops in Pinewood, FL run $14,000 – $45,000 for a full kitchen package, with cabinet installation alone at $4,000 – $13,000 and countertop installation at $2,000 – $6,500. A straightforward layout usually takes two to three weeks from demo to final caulk; anything that moves plumbing, electrical or a wall stretches to five or six. Call (833) 968-1198 for a free on-site estimate.
What the Work Looks Like, Day by Day
This isn’t a “we handle everything” job where you find out what happened after the fact. You’ll know what’s happening each morning and what you need to decide before the next stage starts.
Stage 1: Template and order (week one, before any demo)
We measure the room, check wall plumb and floor level, and confirm your cabinet line, door style and countertop slab or surface choice. That order goes in first because cabinet lead times run three to six weeks and stone slab availability drives the schedule. You decide door style, finish, box construction and hardware here. Nothing gets torn out until the boxes are confirmed.
Stage 2: Demo and prep (one to two days)
Old cabinets, countertops, backsplash and any damaged drywall come out. We check for water damage behind the sink, soft flooring under the cabinet line, and whether the walls are straight enough to hang new boxes without shimming everything. In Pinewood’s block-and-stucco homes, furring strips and uneven CMU walls are common, so this prep day matters more than it does in a newer stick-framed house.
Stage 3: Rough-in and inspection (two to four days)
If you’re relocating the sink, adding a dishwasher circuit, or moving the range, plumbing and electrical rough-in happens now, followed by inspection. This is the stage that adds the most time and cost when the layout changes. If everything stays put, you skip most of it.
Stage 4: Cabinet install (two to three days)
Base and wall cabinets go in, leveled and shimmed, then crown, filler panels, toe kick and doors. You’ll walk the room with us before the countertop template is taken. This is your last easy chance to catch a drawer that binds or a door that rubs.
Stage 5: Countertops and finish (three to five days, including cure time)
Stone and quartz get templated after cabinets are set, fabricated, then installed with seams planned around the sink and cooktop. Sink, faucet and disposal hook up, then backsplash, caulk and punch list. Laminate and solid-surface tops move faster because they’re cut from a template taken earlier. You get a final walkthrough with the 730-Day Done Right Promise in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the decisions on this job come down to four choices. Here’s what each one costs you in trade-offs, not just dollars.
- Stock vs. semi-custom vs. custom cabinets. Stock boxes are the fastest and cheapest, but they come in fixed sizes, so odd wall lengths get filled with filler strips. Semi-custom (KraftMaid is a solid middle ground) lets you adjust widths and depth. Full custom costs the most and buys you exact fit in a room with no square corners.
- Plywood vs. particleboard boxes. Plywood holds up better against humidity swings and holds screws through repeated door cycles. Particleboard is cheaper and fine in a dry, well-ventilated kitchen, but Pinewood’s summer humidity finds weak spots over time.
- Countertop surface. Quartz and granite are the durable choice for a busy kitchen and hold resale value; quartz needs no sealing, granite does. Laminate is the budget option at the low end and works for rentals or a phased remodel. Solid surface sits in the middle and can be sanded out if scratched.
- Drawers vs. doors in the base run. Full-extension drawers cost more per unit but make a small kitchen usable. In Pinewood’s older ranch layouts, where the kitchen is often tight, converting base cabinets to drawers is the single upgrade most homeowners notice daily.
What Cabinets & Countertops Costs in Pinewood, FL
Plan on $14,000 – $45,000 for a complete cabinets and countertops package. A smaller, simpler kitchen lands at $9,000 – $20,000. Here’s how the line items break out:
| Item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full package, small kitchen | $9,000 – $20,000 |
| Full package, standard kitchen | $14,000 – $45,000 |
Four things push a Pinewood job to the high end. Room size and cabinet count come first. Second is the condition behind the old cabinets: water damage, out-of-level floors or walls that need reframing add days. Third is whether you move plumbing, gas or electrical, since that pulls permits and inspection into the schedule. Fourth is material grade: stock laminate at one end, semi-custom with quartz at the other. A written estimate here lists cabinet brand and box construction, countertop material and edge profile, demolition and haul-away, and finish carpentry. It usually does not include appliance cost, new flooring, or drywall repair beyond what demo exposed. Pricing is upfront, the number you see is the number you pay, and 0% financing for 18 months plus $1,000 off projects over $10,000 is available.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Specifically Do to This Job
Pinewood sits in Miami-Dade’s high-velocity hurricane zone, so product approvals and windborne-debris requirements under the Florida Building Code apply here in a way they don’t in most of inland Florida. That rarely changes a cabinet order, but it does affect anything tied to the building envelope during the job, and it’s why we pull permits and pass inspections rather than skip them. The 33167 housing stock is mostly mid-century concrete-block homes from the 1950s and 60s, block-and-stucco with flat or low-slope roofs and original plumbing in the walls. Cutting into solid CMU to relocate a sink drain is slower work than cutting drywall. Near the Little River, low-lying blocks bring floodplain elevation and storm-water rules into play, so scheduling and inspection timing get planned around them. We also plan interior work around the June – November storm season and use mold-resistant assemblies where the kitchen is air-conditioned year-round. Homeowners across Pinewood often pair this with Walk-In Showers & Shower Remodeling in Pinewood when they’re updating the adjacent bath at the same time, or fold it into a larger Kitchen Remodeling in Pinewood scope.
Questions We Get About Cabinets & Countertops in Pinewood
How long does a cabinet and countertop job take?
Two to three weeks for a same-layout replacement, five to six if plumbing or electrical moves. Cabinet lead time drives most of the calendar, which is why we order before demo. Call (833) 968-1198 for a schedule estimate on your kitchen.
Do I need a permit for cabinets & countertops in Pinewood?
Cosmetic replacement only usually doesn’t require one; moving plumbing, gas or electrical does. Because Pinewood is in the high-velocity hurricane zone, anything touching the building envelope also needs review. We pull the permits and manage the inspections. Call for a scope review.
Can you replace cabinets and countertops without moving the plumbing?
Yes, and it’s the most common job we do. Keeping the sink and range in place skips rough-in and inspection, which saves both time and money. A new cabinet layout can shift within inches of the old one. Call to talk through layout options.
What does cabinet and countertop work cost in Pinewood?
Cabinet installation runs $4,000 – $13,000 and countertops $2,000 – $6,500, with a full kitchen package at $14,000 – $45,000. Material grade and layout changes move that most. Call (833) 968-1198 for an exact free quote.
What warranty covers the work?
Every project is backed by the 730-Day Done Right Promise. If something isn’t done right, we make it right. Our technicians bring up to 12 years of experience and arrive background-checked and in uniform. Call to hear how the promise applies to your job.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Get a Free Estimate on Cabinets & Countertops in Pinewood
Call (833) 968-1198 and a live person answers, day or night. You’ll set a time for us to walk your kitchen, measure, and talk through cabinet lines and countertop options. You leave the visit with a written line-item estimate, a realistic schedule and no obligation. Our kitchen remodeling service covers the wider scope if your project grows, and many homeowners also pair this with Tub-to-Shower Conversion in Pinewood while the crew is on site.
Written by the team at Groundwork Construction Co.