We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Olympia Heights, FL: What It Takes and What It Costs

A garage conversion ADU in Olympia Heights typically runs $45,000 – $130,000 and takes 12 to 20 weeks from permit to final inspection, depending on whether you’re keeping the existing plumbing and structure or adding a kitchenette and full bath. You’re turning an attached garage into a permitted, code-compliant living unit, which means closing a wall, insulating, and running all-new electrical and plumbing to current Miami-Dade code. Call (833) 968-1198 for a free on-site estimate and a written line-item scope.

Call (833) 968-1198

The Salt-Air Problem That Shapes This Job in Olympia Heights

Coastal conditions here attack the very hardware a garage was built around. Springs, hinges, rollers, tracks, fasteners, and the opener chain corrode years faster than the same components inland, and homeowners often discover it after the unit has been sitting unused for a decade.

Here’s the failure pattern our crews see most often in Olympia Heights: the torsion spring on an older overhead door has snapped inside its housing, the track has rusted into an uneven rail that no longer guides true, the hinges have seized, and the frame fastener heads are so badly corroded they spin instead of hold. That’s before anyone starts framing a wall.

We don’t troubleshoot springs and cables as a do-it-yourself adventure. Torsion springs and the cables under load carry enough tension to cause serious injury, and we don’t want anyone working near them without proper training. Our job is to make the unit safe and code-ready: typically by removing the overhead door entirely, galvanizing or coating any hardware that stays, switching to stainless fasteners and nylon rollers where moving parts are retained, and inspecting the full frame and tracks for corrosion before any new framing goes up.

Timeline for that initial eval runs one visit. From there, if the plan needs engineered drawings or a re-evaluation of the original slab, we bring in a licensed structural engineer, and the permit package gets assembled by someone fluent in Miami-Dade’s product approval process.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

How We Run a Garage Conversion ADU Project

Every garage conversion runs in five stages. We walk you through each one, and you’ll know what decision is due on what day.

Stage 1: Site evaluation and design brief (1 to 2 weeks)

We come out, measure the slab and existing structure, and take photos of the door assembly, tracks, and frame. You decide what the unit needs: a studio with a kitchenette, a one-bedroom, or a full single-bed with a full bath. That choice is the single biggest cost driver, and it’s locked in before drawings.

Stage 2: Permit package and engineering (3 to 6 weeks)

This is the long pole. Miami-Dade County permits for a garage conversion require structural drawings if you’re changing load-bearing walls or the slab, a wind-load product approval packet, and the electrical, plumbing, and mechanical permits tied to the new unit. We assemble the full package and submit it. You don’t touch the paperwork.

Stage 3: Demo and rough-in (2 to 3 weeks)

Out comes the overhead door and opener, then any interior shelving and built-ins. In goes framing for the new front wall and the separation wall (if the ADU is attached to the main house, code requires a fire-rated assembly). New subfloor goes on the slab if the existing slab isn’t level enough for a tile or LVP underlayment. Electrical rough-in, plumbing rough-in for any bathroom and kitchenette roughs, and HVAC duct runs happen here.

Stage 4: Inspections and close-in (2 to 3 weeks)

Rough-in inspections happen at this stage: one for electrical, one for plumbing, one for framing, one for the structural package if the slab or load path was altered. Pass all four and the walls close. Insulation, drywall, and exterior stucco go up. Fasteners on new stucco are stainless.

Stage 5: Finish and final walk (4 to 6 weeks)

Trim, paint, flooring, bath fixtures, kitchenette fixtures and appliances, and the final inspection. The workmanship carries our 730-Day Done Right Promise, so if anything isn’t right, we make it right within that window.

What You’ll Choose Between

  • Slab condition and subfloor: if the original 1960s slab is intact and mostly level, a self-leveling underlayment gets you to the finish floor for a small upcharge. If it’s cracked or has settled, we scuff and re-pour a topping slab – more spend, but it prevents a floor that telegraphs cracks through tile later.
  • Exterior door stub on the garage apron: the existing overhead opening gets closed with framed wall and stucco. You can put a standard single swing door for access, a set of French doors to bring in light, or leave it walled with a window only. Each changes the exterior look and the wind-load requirements slightly.
  • Wet wall scope: a stack (toilet and sink against one wall, shower on the back) keeps plumbing runs short and cheap. A full bath with a freestanding tub and a separate shower runs into the upper range.
  • Kitchenette vs. full kitchen: a countertop with a sink, a small two-burner cooktop, and a mini-fridge is the low-end path. A full range, 30-inch fridge, and dishwasher push install and venting costs up.
  • HVAC approach: a dedicated mini-split keeps the ADU on its own thermostat and is often the better call for rental-ready units. Tying into the main house ductwork saves on equipment but often requires re-sizing the existing air handler.
  • Flooring: LVP is the fast, moisture-tolerant choice for a converted garage. Porcelain tile is more durable and handles standing water better; it costs a bit more per square foot installed but outlasts LVP in a humid, coastal environment.
  • Wall insulation: spray foam is the premium option for the new front and separating walls and handles the humidity swings well. Batt insulation costs less but needs a good vapor barrier.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What a Garage Conversion ADU Costs in Olympia Heights, FL

The floor on this work is $45,000; the ceiling sits around $130,000. A studio with a kitchenette and half-bath on an intact slab usually lands near the low end. A one-bedroom with a full bath, a dedicated mini-split, and upgraded finishes lands nearer $90,000 to $110,000. A two-bed configuration with a full kitchen, structural re-work, and a re-poured slab can push past $120,000.

What moves the number:

  • Size and configuration: a single-car 220-square-foot garage finished as a studio is a different project than a 500-square-foot two-car garage turned into a one-bedroom.
  • Existing slab condition: cracking or settlement adds a re-pour or engineered topping, plus the engineering cost to justify it to the county.
  • Plumbing and electrical relocation: running new supply and drain lines across the slab, and running new 240-volt circuits for a range, adds real cost if the main panel needs an upgrade to handle the new load.
  • Structural changes: if you’re removing a load-bearing wall between the garage and the main house, that’s a beam, posts, engineering, and often a pier footing into the limestone.
  • Permit scope and inspections: a conversion touching structure, plumbing, electrical, and HVAC carries more review cycles and more inspection stops than a cosmetic-only job.

Included in a written estimate: demo, framing, closure of the overhead opening, new electrical and plumbing rough-ins, HVAC, insulation, drywall, stucco patch on the exterior, flooring, interior paint, permits, and inspections. Typically not included unless scoped in writing: furniture, appliances above the standard allowance, decorative lighting beyond the specified fixtures, landscaping repairs after construction, and utility connection fees.

What Olympia Heights Homes Specifically Do to This Job

Olympia Heights (ZIP 33165) is a mid-century pocket of unincorporated Miami-Dade where most of the homes we walk into are single-story concrete-block and stucco ranches built from the 1950s through the 1970s, many with original carports and flat or low-slope roofs. A garage conversion here almost always comes with a slab from that era, and the county’s post-Andrew wind code means any structural change gets a product approval review even if you’re just closing the overhead door with a framed wall.

What we see more than anything: original carports that were never fully permitted as garage enclosures, so before we can pull a garage conversion permit we’re often cleaning up an old open permit or establishing the legal square footage from the county’s records. That’s a real step and we budget for it.

Climate layers on top. This is subtropical marine Miami-Dade, so UV-resistant finishes, continuous waterproofing under the stucco, and drainage detailing that sheds the short-duration summer deluges matter. The limestone ridge under the property also means any pier or footing work for a load-bearing change is engineered, not improvised. If your conversion is part of a full Home Additions & ADU in Olympia Heights plan, the garage structure is usually the less expensive piece of the puzzle – the rest of the scope lives in that page. To see the whole job family we handle, visit our Home Additions & ADU service hub. We cover work throughout Olympia Heights and the surrounding pocket. Many homeowners pair this ADU with fresh Cabinets & Countertops in Olympia Heights for the kitchenette, then add a durable Backsplash, Tile & Flooring in Olympia Heights package for the bath and main floor.

Serving Olympia Heights, FL – Our Local Coverage Area

We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Olympia Heights

Get a Free Estimate for Your Garage Conversion ADU in Olympia Heights

Call (833) 968-1198 to schedule a free on-site estimate. We walk the garage, check the door assembly and tracks for corrosion, measure the slab, and talk through layout options. You leave the visit with a written line-item estimate and a realistic timeline – no pressure, no surprise change orders. Calls are answered by a live person 24/7. If your project is over $10,000, you qualify for $1,000 off and 0% financing for 18 months.

Written by the team at Groundwork Construction Co. of Miami.

Why Olympia Heights Chooses Groundwork Construction Co. of Miami

We set the standard for garage conversion ADU in Olympia Heights.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Olympia Heights

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Olympia Heights Customers Say

Trusted by homeowners across Olympia Heights and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Olympia Heights?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Olympia Heights.

(833) 968-1198

Request a Free Estimate in Olympia Heights

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch