Tub-to-Shower Conversion in Hialeah, FL: What It Takes and What It Costs
A tub-to-shower conversion in Hialeah typically runs $3,500 – $10,000 and takes about 5 to 10 working days from demo to final inspection. The job means removing the tub and its surround, relocating or lowering the drain and valve to shower height, rebuilding the waterproofing and pan, and setting new tile or a solid-surface wall. Most of our Hialeah conversions land in the $4,500 – $7,500 range. Call (833) 968-1198 to schedule a free estimate.
How a conversion actually goes, stage by stage
Nothing about this job is mysterious once you’ve seen twenty of them, but we’ve had homeowners tell us they didn’t know what happened after demo day. Here’s the real sequence we run, and what you decide at each point.
Stage 1: Demo and inspection (day 1 and into day 2)
We pull the old tub, the surround and any drywall or greenboard behind it. This is where surprises usually show up in older Hialeah homes: soft subfloor around the drain, a valve cartridge that’s seized, or a stud wall that was never properly blocked. You decide nothing here except to greenlight any repair we find. We photograph everything and send it to you before we cover it back up.
Stage 2: Rough-in plumbing and electrical (day 2 to 3)
The drain gets moved from tub depth to shower depth, the valve body gets set at finish height, and we rough in the shower light or vent if you’re adding one. If the valve stays where it is and the drain is centered under the old tub footprint, this stage is quick. If you’re moving the plumbing to a different wall, this is where the extra time goes.
Stage 3: The waterproofing – the part that matters most (day 3 to 4)
This is where a cheap conversion fails five years later. We build a sloped mortar pan, then a bonded waterproof membrane over the pan and up the walls, then tape and seal every seam and corner. In South Florida’s humidity, a membrane that isn’t lapped and sealed correctly is the difference between a shower that lasts and one that grows mold behind the tile. We use Schluter systems for the membrane and pan.
Stage 4: Tile, surround and trim (day 4 to 8)
Wall tile or panels go up, the pan gets tiled, and you pick your fixtures: Delta or American Standard valve and trim, showerhead, drain cover, and a niche or bench if you want one. Grout, caulk, and a day to cure before we set the door.
Stage 5: Fixtures, glass, final walkthrough (day 8 to 10)
Showerhead, valve trim, glass door or curtain rod, and a full leak test. The inspection follows if you’re moving plumbing or electrical, and we don’t call it done until it passes. Then we walk you through the whole job and hand you the written warranty.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
- Acrylic or fiberglass surround: $2,500 – $4,500 installed. Fastest install, molded-in shelves, easy to clean. It looks like a shower kit, and it can crack at the seams over time. Best for rental units or a budget-first conversion.
- Tile over a waterproof membrane: $5,000 – $10,000. This is the majority of what we install. You control the look, the pan is built to last, and it holds up in humidity. More labor, so more money.
- Solid-surface panels: $4,000 – $7,000. A middle ground. Real stone look, fewer grout lines, quick install. Doesn’t quite match tile for a custom feel.
- Prefab pan vs. custom mortar pan: A prefab pan saves a day and a few hundred dollars; a mortar pan with a Schluter membrane fits odd dimensions and lasts longer. On a standard 30×60 alcove, we usually recommend the mortar pan.
- Glass door vs. curtain rod: Glass adds $600 – $1,200 and makes a small bathroom feel bigger. A rod and curtain costs almost nothing and is easier for an older parent to use.
Add a built-in bench, a niche, or a grab bar and the number climbs $200 – $600 per item. Worth it if someone in the house needs the seat.
What Tub-to-Shower Conversion costs in Hialeah, FL
The honest range for a tub-to-shower conversion in Hialeah is $3,500 – $10,000. Most standard alcove jobs land between $4,500 and $7,500. The five things that push a job toward the high end:
- Size and layout: A standard 30×60 alcove is the cheapest. A wider or custom-sized shower, or moving the plumbing to a different wall, adds $1,000 – $3,000.
- What’s behind the tub: Soft subfloor, rot, or an unblocked wall adds repair cost that’s hard to quote until demo day. We flag it the morning we see it.
- Moving plumbing or electrical: A valve relocation or a new shower light requires rough-in work plus an inspection.
- Material grade: Acrylic is the low end, tile is the high end, solid-surface is in between. The material itself is $1,500 – $4,000 of the total.
- Permit scope: A straight swap in the same footprint may not need a plumbing permit; moving the drain or valve does. We pull the permit and pass the inspection, and we tell you which side of that line your job is on before we start.
A written estimate from us is line-itemized: demo, plumbing rough-in, waterproofing, tile or panel, fixtures, glass, permit, and cleanup. What it won’t include is behind-the-wall repair we can’t see, which is why we photograph anything unexpected before we touch it. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah homes specifically do to this job
Hialeah is dense, mostly Spanish-speaking, and built on 1950s – 1970s concrete-block and stucco homes with small, original bathrooms. That housing stock changes this job in ways you won’t hit in a newer suburb. The tubs are original cast-iron or steel, often set into a mortar bed, and pulling one out of a block-wall alcove takes longer than a modern fiberglass unit. We set the drain and valve, and the rough-in is often older than the house’s electrical, so we look at both. Our crews work in Spanish and English, because in Hialeah the bid you can’t read might as well not exist.
Permitting in Hialeah and Miami-Dade runs under the county’s wind-borne debris and flood elevation rules, and moving plumbing or electrical in a conversion means an inspection, so we build a day into the schedule for it. On the west side, in the 33016 and 33018 ZIP codes, we see 1960s block homes where the original drain is set deep and the subfloor is still solid, so a straight swap is common. In 33010 and 33012, where the older homes sit close to the property line and many have a rear or side addition, we’ve run into plumbing that was never permitted and needs to be brought up to code before the new pan goes in.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Tub-to-Shower Conversion in Hialeah
Most conversions take 5 to 10 working days from demo to final inspection. A standard alcove with no plumbing move is closer to 5; a custom tile job with a valve relocation and a permit inspection runs toward the 10-day end. We give you a day-by-day schedule in the written estimate. Call (833) 968-1198 for an exact timeline.
You need a permit if the plumbing or electrical is moving; a straight swap in the same footprint may not require one. We pull the permit and pass the inspection when it’s required, and we tell you which applies to your job before we start. Call (833) 968-1198 to talk through your layout.
Yes, in most Hialeah bathrooms. If the drain stays under the old tub footprint and the valve stays on the same wall, we can convert without a plumbing move, which keeps the cost down and avoids a plumbing inspection. Call (833) 968-1198 and we’ll check your layout on the free estimate.
The range in Hialeah is $3,500 – $10,000, with most jobs landing between $4,500 and $7,500. Size, what’s behind the tub, plumbing moves, material grade and permit scope are the five things that move the number. We offer 0% financing for 18 months and $1,000 off projects over $10,000. Call (833) 968-1198 for an exact quote.
Every tub-to-shower conversion is covered by our 730-Day Done Right Promise. If the waterproofing, tile, or plumbing isn’t right within that window, we make it right. That’s one of the longest workmanship guarantees in residential construction, in writing. Call (833) 968-1198 to schedule your free estimate.
Schedule your free tub-to-shower conversion estimate
We’ll come out, look at the tub, check the drain and valve, and give you a line-itemized estimate for a tub-to-shower conversion in Hialeah before you commit to anything. Calls are answered by a live person, 24/7. If you’re planning this as part of a Bathroom Remodeling in Hialeah, we’ll scope both together and you see the whole number up front. Call (833) 968-1198. Our bathroom remodeling service runs the full project from foundation to finish line, and homeowners across Hialeah pair this work with Metal Roofing in Hialeah and Tile Roofing in Hialeah when the rest of the house is due. More detail lives on our Bathroom Remodeling hub.
Written by the team at Groundwork Construction Co.