Garage Conversion ADU in Gladeview, FL: What It Takes and What It Costs
A Garage Conversion ADU in Gladeview runs $45,000 – $130,000 and takes about 4 to 7 months from permit to final inspection. The work turns an attached or detached garage into a legal, permitted living unit: new framing and insulation, full electrical and plumbing, a bathroom and kitchenette, impact-rated glazing, and a separate entry. Most of that time is county review, not hammer-and-nail work. Call (833) 968-1198 for a free on-site estimate.
Key takeaways
- Budget $45,000 – $130,000 depending on size, whether you’re adding a bathroom and kitchenette, and how much structural or utility work the existing garage needs.
- Permits run through Miami-Dade County, not a city hall, and even a small conversion has to meet High-Velocity Hurricane Zone rules.
- Expect 4 – 7 months. Roughly 6 to 12 weeks of that is plan review and inspections.
- Most garage conversions finish in a single pass if the survey catches the old carport-to-bedroom additions before demo.
How we run a garage conversion, stage by stage
Every garage is different, but the sequence doesn’t change much. Here’s what the calendar actually looks like.
Stage 1: Site survey and as-built drawings (week 1 – 2). Before anyone picks up a pry bar, we measure the existing garage and document what’s really there. In Gladeview that means checking whether the garage slab, roof tie-in, or electrical panel was built to plan or added informally. You decide the unit’s footprint and whether you want a one-bedroom or a studio layout. This is also when you decide whether the conversion is part of a full Home Additions & ADU in Gladeview project or a standalone job.
Stage 2: Permit submittal and plan review (week 2 – 10). We prepare and submit the permit package to Miami-Dade County with stamped drawings, product approvals for the wind-rated components, and the electrical, plumbing, and mechanical plans. County plan reviewers can take several weeks. You don’t have to lift a finger here, but you do decide the finish schedule and your glazing and roofing selections during this window so nothing stalls later.
Stage 3: Demo and rough framing (week 10 – 13). Old garage doors come out, the floor gets prepped, and any elevation change to the slab gets handled. We add or infill framing for the new walls, bathroom, and kitchenette, then run electrical and plumbing rough-ins. You’ll get a heads-up before any inspection stage that requires the home to be accessible.
Stage 4: Inspections and close-in (week 13 – 20). Rough inspections for framing, electrical, plumbing, and mechanical happen before insulation and drywall go up. Then it’s insulation, drywall, finish carpentry, and the impact-rated window and door installs. This is the slowest, most visible stretch. Expect inspections at framing and at final.
Stage 5: Finishes and final walkthrough (week 20 – 28). Flooring, paint, cabinets, fixtures, trim, and the final inspection and occupancy sign-off. We do a walkthrough with you room by room, and any punch-list items get handled before we call it done. Everything is backed by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make: options and honest trade-offs
- Flooring: LVP holds up well in a humid South Florida climate and cleans up fast; it costs less than tile but shows wear in high-traffic kitchens. Porcelain tile is the durable pick and handles moisture better if the unit sits on a slab with any dampness.
- Wall insulation and moisture barrier: Closed-cell spray foam costs more upfront but controls humidity and summer heat better in a garage that used to be unconditioned. Standard batt insulation is cheaper and adequate if the assembly is sealed and vented right.
- Windows and doors: Impact-rated glazing is the sensible default here. It costs more than non-rated units but is what the county expects in a wind-borne-debris zone, and it drops your insurance premiums.
- Kitchenette: A compact sink, two-burner cooktop, and under-counter fridge fit a studio and rent well. A full galley kitchen costs more but appeals to longer-term tenants.
- Bathroom: A walk-in shower is simpler to build in a converted garage than a tub and takes less square footage. A tub-and-shower combo is worth considering if you expect families as renters.
- HVAC: A mini-split is the usual pick for a single-room unit and doesn’t require extending ductwork from the main house. A ducted system works if you’re already replacing the main HVAC and can tie in.
We’ll walk you through each of these with real numbers so you can decide what matters to you. Here’s the short version of our Home Additions & ADU service: you choose, we build it to spec, and the price you see is the price you pay.
What Garage Conversion ADU costs in Gladeview, FL
Plan on $45,000 – $130,000. Most Gladeview conversions land in the $65,000 – $95,000 range for a one-bedroom unit with a compact kitchenette and full bathroom.
Five variables push the number to the low or high end:
- Size and layout. A 300-square-foot studio is on the low end. A 600-square-foot one-bedroom with a full kitchen and separate laundry runs near the top.
- Existing condition. A garage on a level, crack-free slab saves money. A slab that needs lifting, a roof tie-in that wasn’t built right, or old electrical that fails inspection adds $5,000 – $20,000.
- Relocating plumbing and structure. If the washer hookup or bathroom drain needs a new trench and floor cut, the price climbs. Keeping the new bathroom close to the existing plumbing wall keeps the number down.
- Material grade. Builder-grade cabinets and LVP land near $65,000. Custom cabinets, porcelain tile throughout, and upgraded windows land closer to $110,000+.
- Permit and inspection scope. Adding a second electrical meter, a new address, or a separate utility connection extends the county process and the cost.
A written estimate covers the scope of work line by line: framing, electrical, plumbing, HVAC, insulation, drywall, finishes, and the permit fee. What it typically doesn’t cover is landscaping or hardscape outside the unit, foundation work if the survey reveals an unexpected problem, or moving the main-house electrical panel. Any of those gets quoted separately before we touch it, with no surprises on the final invoice. Call (833) 968-1198 for a free on-site estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Gladeview homes specifically do to this job
Gladeview is an unincorporated pocket of Miami-Dade County around NW 79th St and the 33147 ZIP, and there’s no local city hall handling permits. Every conversion here goes through the county’s permitting process, and that means High-Velocity Hurricane Zone rules and product approvals apply from the first submittal. That’s different from a job just across the line in Hialeah, and it changes what materials and drawings we need going in.
The housing stock adds its own wrinkle. Much of 33147 is 1940s – 1960s concrete-block and terrazzo homes that have been expanded over decades with unpermitted room additions and carports turned into bedrooms. That legacy means as-built surveys, roof-to-wall tie-in inspections, and verification of what’s already built are routine on almost every garage conversion we do here. If a past addition surfaces during the survey, we flag it early rather than letting it derail the final inspection. We serve all of Gladeview, including the NW 79th Street corridor and nearby streets toward West Little River and Brownsville.
Serving Gladeview, FL – Our Local Coverage Area
We serve Gladeview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Gladeview
Most take 4 to 7 months from permit submittal to final inspection, with 6 to 12 weeks of that in county plan review before construction begins. A simple studio finishes faster than a one-bedroom with a full kitchen. Call (833) 968-1198 to get a timeline for your specific garage.
Yes. Miami-Dade County requires a permit for every garage conversion, and because Gladeview is unincorporated, there is no city-level shortcut. A conversion also has to meet High-Velocity Hurricane Zone rules for wind rating, which means impact-rated doors and windows and approved product specs. Call us and we’ll tell you what your drawings need.
Often yes, if the new bathroom shares a wall with the existing plumbing and the garage ceiling can accommodate the new unit without cutting into the roof structure. Keeping the kitchenette and bathroom on the same wall keeps costs down significantly. Call (833) 968-1198 to get an honest read on your garage.
Ranges run $45,000 – $130,000, with most one-bedroom conversions landing between $65,000 and $95,000. The big drivers are size, existing slab and roof condition, and how much plumbing needs to move. A written estimate breaks out every line item so you know where the money goes. Call (833) 968-1198 – estimates are free.
Every garage conversion we build is covered by the 730-Day Done Right Promise. If something isn’t done right, we make it right. You get a live person on the phone any hour of the day, and background-checked uniformed technicians on every job site. Financing at 0% for 18 months is available, plus $1,000 off projects over $10,000. If you’re also refreshing the main house, homeowners often pair this with Cabinets & Countertops in Gladeview or Backsplash, Tile & Flooring in Gladeview.
Ready to price your Gladeview garage conversion?
Call (833) 968-1198 for a free on-site estimate on your Garage Conversion ADU in Gladeview. We walk the garage with you, measure the slab and roof tie-in, check what’s been added over the years, and give you a written line-item quote within a few days. No pressure, no hidden fees, and a real person on the phone any hour of the day. The number you see is the number you pay.